Вы находитесь на странице: 1из 13

CZMAINOC/JE/2016124 o

No. 17|/DSTF,IP
GOVERNMENTOF PUDUCHERRY
DEPARTMENTOF SCIENCE.TECHNOLOGY& ENVIRONMENT
PUDUCHERRYCOASTAL ZONE MANAGEMENT AUTHORITY
3.dFLooR. PHI} BUILDING. ANNA NAGAR, PUDUCHERRY_ 5.
Phone: (04f3) 2201256 Fax: (0413)2203494

Puducherry,,n.
W, B Jui 2.t1fr
To
Shri S.K. Srivastava
Additional Director
Ministry of Environment,Forests& Climate Change
Governmentof India
Indira ParyavaranBhavan,Jor Bagh Road
Ali Ganj,New Delhi - 110003.

Sir,

Sub: PCZMA- CRZ clearancefor construction of one nearshorereef, one


offshore and beach nourishmentfor restorationof PondicherryBeach -
Reg.

Ref: Application from PWD, Puducherry vide letter No. 40l/PW/CEIEEPI


AE(P)1/F.No./ 2016-17dated10.06.2016.

The Governmentof Puducherryaims to restorethe Puducherrybeach in front of the


town using safe and secure coastal protection methods in collaborationwith the National
Institute of Ocean Technology (NIOT), Chennai. This proposal was discussedin the
Authority held on 13.06.2016and
of the PuducherryCoastalZoneManagement
32ndmeeting
the Authority resolvedto recommendthe proposalto Ministry of Environment,Forestsand
ClimateChange,Governmentof India for approvalsubjectto the following conditions:

i) The project shall not interferewith the regularfishing activitiesin the area.
ii) Continuousmonitoring of the levels of crest of berm or other appropriatemethods
shall be carried out by the Project Proponentto assessthe shorelinechangesfor the
entire coast of the Union Territory and report shall be submitted to PCZMA every
ot year.

: 1 .ouT
o.f, (Continuedto PageNo. 2)
lht/
'! 1 jill- ?fi"l$
1' ..g.

6
. r*
- t
{
.*
-)-

Accordingly, the following documents submitted by the Project proponent


are
recommendedand forwardedfor issueof CRZ Clearance:
i) Copy of letter and applicationin Form I dated 10,06.2016.
ii) Environmental TrnpactAssessmentStud,ydone by NIOT, Chennai.
iii) DetailedDesign Report on PondicherryBeachRestorationProject.
iv) CRZ map covering 7 km radius, indicating HTL and LTL demarcatedby NIOT,
Chennaii n l:4000 scale,with project layout superimposedon the abovemap and
indicating the CRZ-I, II, III and IV areasincluding other notified ecologically
sensitiveareas.
v) Minutes of 32"dpczM|meeting held on 13.06.2016,

Since,the restorationof the Pondicherrybeachis a top priority for the Government


of
Puducherry, it is recommendedthat CRZ Clearancemay be accorded for the project
at the
earliest.

Yours sine.ereh'.

(M. DWARAKANATH)
Director/ MS-PCZMA
Copyto:
4. TheDirector,NIOT, Chennai.
2. TheChiefEngineer,PWD,puducherry.
3. StandingGuardFile.

I
"r-,

'd
rvrnutes orS|-pC-JEIVlA Meeting held on
f3.06.2016

Agenda Item No. 1r: cRZ crearancefor M/s.


Annamarai sea view Resorfs at
Nallavadu, Poornankuppam Village, Ariyankuppam
Commune Panchayat,
Puducherry.
The Authority heardthe proposaland discussed
thesubjectin detail.After due
deliberation,the Authority resolved to recommend
the proposal to Mi'istry of
Environment,Forestsand climate change, Government
of India for extendinqthe
validity of the CRZ Clearanceissuedby the Ministry vide
F. No. t6-412009-14.lII dated
31.05.2010, subjectto thefollowingcondition:
i) Thereshallbe no changein theprojectprofireapproved
earlier.

Additional Aeenda
I'
AgendaItem No. 1: cRZ clearancefor construction
1?'n'aaitional of one near shore
/" reef, one offshore and beach nourishmentnear Gandhi statue, Beach road.
Puducherry.
The Authority heardthe proposaland discussed
the
subjectin detail.After due
deliberation,the Authority resolved to recommend
the proposal to Ministry of
Environment,Forestsand ClimateChange,Governmentof
India for appro'al subiectto
thefollorvingconditions:
i) Theprojectshallnot interferewith the regularfishingactivities
in the area.
ii) continuousmonitoringof the levelsof crestof bermor other
appropriate methods
shall be carriedout by the ProjectProponentto assessthe
shorelile changesfor
the entirecoastof the union Territoryand reportshall be submitted pcZMA
to
CVCrV VCAI.

Additional Agenda Item No, 2 -CP<Zclearancefor providing


Elevatedwooden
walk way and rourist Amenitiesat IsrandNo.3in yanam:
The Authority heardthe proposaland discussedthe subjectin detail.After due
deliberation,
the Authorityresolvedto accordCRZ Clearancefor the proposal,
subjectto
followingconditions.
i) Theactivitiesshouldnot causeanyadverseimpacton the nearbymangroves.
ii) oniy eco-friendlyconstructionmaterialslike bamboo,wood, etc. shall
be usedfor
ali construction.
iii) Thereshouldnot be any groundwaterextractionin cRZ areas. ,.
iv) No untreatedwastewatershallbe discharged in the CoastalRegulationZone.
v) Properarrangements shall be madefor disposalof solid wastesand thereshallnot
be any dumping,ofsolid wastein CRZ areas.
vi) The project proponentshall submit bi-annualreport on the project progress
to
PCZMA.
il |
Y\,L
{
ANNEXURE - 1 LOCATION MAP
ANNEXURE - 2 CONNECTIVITY MAP
ANNEXURE - 3 GOOGLE BUFFER MAP OF 10KM RADIUS
ANNEXURE - 4 BATHYMETRY MAP
ANNEXURE - 5 NHO CHART
ANNEXURE - 6 TOPOSHEET
ANNEXURE - 7 DEMARCATION OF HTL/LTL FOR PONDICHERRY
CRZ MAP in 1:4000 scale

Вам также может понравиться