PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO
CONTRACTOR RA BILL NO. : RA-01
A Annexure A
B Annexure B
12th Floor-Dining Area + Meeting Room &
20,122,135.50 - 977,210.16 977,210.16
Gym Area
C Annexure C
12th Floor-Wet Area + Kitchen 5,183,190.00 - 125,859.24 125,859.24
D Annexure D
13th Floor-Lounge Area + Offices 16,548,138.35 - 1,113,284.89 1,113,284.89
E Annexure E
Washroom + Lift Lobby 7,319,461.25 - 258,370.07 258,370.07
F Annexure F
A REPAIR WORKS
Note:
The rate for all demolishing and dismantling to include carting and disposing
of
Thethe debris
Site shouldat the
be site at designated
handed dumping
over in a clean grounds
state; removing andallfurther
debristofrom
the
approved
Necessaryplace,
Site propping, outside of theand
shoring hotel
/ orpremises,
underpinningby the NDMC
shall or any other
be provided for the
relevant
safety
Use wallof authority.
the adjoining
cutter/ breakerwork or property,
in place of handwhich
tools is to be left in tact, before
dismantling
The CONTRACTOR and demolishing
shall take is necessary
taken up and the workfrom
approvals shall beHotel
the carried out in
A.1 such a
Providingway
Management that
andor no damage
any temporary
fixing is caused
other Authority to the adjoiningof
beforebarricading
partitions/ disposing work
area or property.
themade
debris.of hard Sqm 20.00 3,075 61,500.00
wood,
Uptoframe
90%work and 6mm
on Pro-rata commercial
completion plywood on one side including all,
of works 2,768 - - 20.00 20.00 - 55,350.00 55,350.00
supporting and fixing arrangement and finished
10% upon completion of entire work and handing over with a flex sheet or printed 308 - - - - - -
A.2 wallpaper, as directed
Covering glass panes of towards
windows/ the doors/
guest facing side,bytoplywood
openings be maintained
or tin sheets Sqm 84.00 967 81,228.00 - - -
through
or pvc the required
sheets or as period and
directed, to the satisfaction
maintaining the aestheicof project
beautymanager.
of the area, to
Upto 90% on Pro-rata completion of works 870 - - 84.00 84.00 - 73,105.20 73,105.20
avoid
10%damage
upon to shutters of
completion and glasswork
entire panes
and including
handing using
over P.O.P. to clean 97 - - - - - -
Rateglass
the shall( be
if inclusive),of
required dismantling
removal of thetemporary
same afterpartition
completionand of
taking
work, always
A.3 Providing
from and making
site/ and
hotel premises core
at cutting in RCC Up to 200
the designated mm thickness, - - - - -
cleaning,
including making good local damage if place
any toand
the disposal
satisfactionsafely.
of the
a 50 to 100 cutting
mm diasteel reinforcement wherever required, cleaning, removing Nos 11.00 2,219 24,409.00 - - - - -
project
debris manager.
b For to at
150anmm
100 dimensions, indicated
please
dia location outside the site on
check measurements etcsite.
complete as per drawing Nos 11.00 3,117 34,287.00 - - - - -
c & directions
200 to 250 mm of the
diaproject manager. Nos 11.00 5,073 55,803.00 - - - - -
A.4 Dismantling, Demolishing, Cutting, Breaking, Removing & Cleaning Existing - - - - - -
a Items Carefully
Removing and Stacking
of existing flooring the useable
in areas Materials
including at sitematerials,
bedding or as Instructed
wooden Sqm 2200.00 198 435,600.00 - - - - -
including
planks
Upto 90% necessary tool, tackles,
on Pro-rata machineries,
completion of works requisite scaffolding, carting 178 - - 313.70 313.70 - 55,901.47 55,901.47
away10% debris
uponfrom site timeoftoentire
completion time or
workdisposing the material
and handing over at the municipal 20 - - - - - -
grounds as designated and specified by the project manager for the
b Removing of existing doors including door frames Sqm QRO 460 - - - - -
following Items. (The rate shall include all leads, lift and height)
c Removing of existing partitions/ paneling Sqm 2700.00 152 410,400.00 - - - - -
Upto 90% on Pro-rata completion of works 137 - - 283.06 283.06 - 38,721.99 38,721.99
10% upon completion of entire work and handing over 15 - - - - - -
d Removal of existing internal plaster with racking out the masonry joints. Sqm QRO 152 - - - - -
e Removing of existing internal 100 mm thick brick work Sqm QRO 161 - - - - -
f Removing of existing internal 150 mm thick brick work Sqm QRO 221 - - - - -
g Removing of existing internal 230 mm thick brick work Sqm 1000.00 286 286,000.00 - - - - -
Upto 90% on Pro-rata completion of works 257 - - 208.30 208.30 - 53,617.23 53,617.23
10% upon completion of entire work and handing over 29 - - - - - -
h Removing of existing counters - bar counters, vanity, etc. Sqm 100.00 1,381 138,100.00 - - - - -
Upto 90% on Pro-rata completion of works 1,243 - - 5.57 5.57 - 6,919.22 6,919.22
10% upon completion of entire work and handing over 138 - - - - - -
i Removing of existing curtains with pelmet Sqm 500.00 92 46,000.00 - - - - -
Upto 90% on Pro-rata completion of works 83 - - 4.93 4.93 - 408.14 408.14
10% upon completion of entire work and handing over 9 - - - - - -
j Removing of existing false ceiling with structural steel supports, framings, Sqm 2200.00 231 508,200.00 - - - - -
lightUpto
fittings,
90%wooden beams,
on Pro-rata etc. all complete
completion of works 208 - - 1,006.81 1,006.81 - 209,315.87 209,315.87
10% upon completion of entire work and handing over 23 - - - - - -
k Dismantling of RCC work Sqm 200.00 1,105 221,000.00 - - - - -
l Removing of existing Storage with all fixtures Sqm 300.00 691 207,300.00 - - - - -
Upto 90% on Pro-rata completion of works 622 - - 8.80 8.80 - 5,470.54 5,470.54
10% upon completion of entire work and handing over 69 - - - - - -
m Removal of the existing mezzanine floor including the false ceiing, wooden Sqm 150.00 341 51,150.00 - - - - -
stairs,
Upto floor
90%andonrailings,
Pro-ratapaneling, structural
completion steel members, etc. all
of works 307 - - 150.00 150.00 - 46,035.00 46,035.00
complete
10% upon completion of entire work and handing over 34 - - - - - -
03/05/2020 ANNEX-A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
- - - - -
B CIVIL WORKS
B.1 Providing & doing well Burnt (First Class) Brick masonary in all location with -
conventional
a. 150mm thick type brickbricks
work in cement mortar 1:4 in superstructure including Sqm 34.00 1,381 46,954.00 - - - - -
striking
Uptojoints,90% on racking
Pro-rata out completion
joints, watering, of works scaffolding and cleaning etc. 1,243 - - 4.33 4.33 - 5,384.24 5,384.24
complete.
10% upon Ratecompletion
also included providing
of entire work &and laying
handingcast in over situ RCC band beam 138 - - - - - -
(Patli) in M:15 at 1200mm c/c with 2nos 8mm dia reinforcement including
b. 100mm thick brick work Sqm 11.00 NQ - -
shuttering, deshuttering, curing, cleaning etc. completed at all heights and
c. 230mm thick
satifaction to thebrick project work manager. Sqm 115.00 1,612 185,380.00 - - - - -
B.2 Providing and applying avg. 12 - 15mm thk. (avg.) internal plaster in cement Sqm 67.00 415 27,805.00 - - - - -
B.3 sand mortar
Providing and(1:4) for allCement
applying plain / curved sand rough surfaces of brick
Plaster 1:4,/ 12-15mm
block / RCC thickwalls
over Sqm 134.00 415 55,610.00 - - - - -
and finishing
Internal
Upto 90%the
Walls on same (smooth
/ Columns
Pro-rata / completion or broom)
RCC Surfaces of workstoinline
correct
10%level line,
uponandlevel plumb
completion & toplumb,
smooth
of 374 - - 8.66 8.66 - 3,236.00 3,236.00
making
finish
entire
10% of
accordingedges,
workcompletion
upon and corners,
to specifications.
handing sill,
of over jambs,
entireRate soffits,
workshall grooves,
and include
handingfor pattas
over etc. as
providing G.I.chicken per 42 - - - - - -
drawings
mesh made & relevant
outlaying specifications
of galvanised iron of including
nominal all necessary surface
B.4 Providing and average 75mm thick PCCthickness
1:3:6 with 0.3520mm mm down with a Zinc Sqm 147.00 424 62,328.00 - - - - -
preparation,
coating of 120 scaffolding,
gms per Sqmincludingat the p/f of PVC of
junctions chicken
masonry mesh andof nominal works
concrete
aggregate
Upto 90% complete
on Flooring
Pro-rata at the toilet
completion of floor area
works 10% after
upon the drainage
completion works. 382 - - 18.40 18.40 - 7,021.44 7,021.44
thickness
to a width 0.35
ofinclude
100 mm to with
125mm a Zinc coatingtying
including of 120 gms perwith
in position Sqmsuitable & width ofof100
The costupon
entire
10% to
work and
completion the labour,
handing over
ofstaging,all the
entire material, accessories over atcomplete as per 42 - - - - - -
to 125mm
clamps/screws, at all junctions
necessary of RCC &work masonry and handing
scaffolding work,
and hacking
curing ofallconcrete
levels and
B.5 the instruction
Providing and satisfaction of the project manager. Sqm 218.00 576 125,568.00 - - - - -
surface to &receive
elevations laying
etc., IPS flooring
plaster,
complete aswatering,at anycuring,
directed. location
Rate shall asinclude
cleaning specified
etc.for of
complete 75mmhacking,
proper at all
thickness
levels
Upto
cleaning and (avg.)
90%
and onwith
heights
as allcement
Pro-rata
directed complete
by concrete
completionas per
project nominal
ofthe
manager. works mix of
directions
10% ofproportion
upon project1:2:4
thecompletion manager.
of 518 - - 18.40 18.40 - 9,538.56 9,538.56
(cement
entire
10% upon : work
Sandcompletion
: Aggregate)
and handing in correct
of over
entire worklevel and /handing
slope atover all levels as per 58 - - - - - -
B.6 architectural drawings
Waterproofing includingfollowing
Works including mixing of: concrete in mixer, lifting, shifting to Sqm 74.00 1,027 75,998.00 - - - - -
the work location, compacting / vibrating, finishing smooth to the satisfaction
B.7 Providing and laying light weight AAC/ foam concrete blocks under sunken Cum 15.00 3,222 48,330.00 - - - - -
of the project
a) Waterproofing manager,treatment curing, and
: Cleaning cleaning
the the surface
surface our etc.
toramming complete.
requirements,
B.8 portion
Providing of floors
Pest control up to the
and depth of 300mm
Anti-termite including
treatment: Drill atand Sqm 210.00 231 48,510.00 - - - - -
(Mode
providing of measurements
and applying :Plan
polymer area
based of Flooring
flexible shall
cementitious beholes
measured the for
waterproof
junction
consolidation
of wall and floorall complete
at 1sqft as directed
intervals & by
inject the
in project
approved manager.
anti termite and
payment
coating consisting of acrylic polymer mixed with cement, applied in 2 coats
sealing
TOTAL the OF holes
CIVILthereafter
WORKS with white cement and spray all exposed walls 676,483.00 - 25,180.25 25,180.25
in
andtheflooring
form ofsurface slurry over with the antiRCC slab and
termiticide spray on bytheappointing
vertical surfaces a specialized up to a
height
agency1.50 as per mtr.the above F.F.L. or as
specifications instructed,
mentioned byincluding
the Bureau grouting
of Indian of,
C STRUCTURAL
construction joints,WORKS honeycombs locations, cracks etc. with crystalline based
Standards and Agencies specifications (whichever is higher), for General
C.1 Preparing
non shrink
Civil, Plumbing,/shop drawings,
cementitious Drainage grout obtaining
andtotimber/full consultant's/
saturation,
Carpentrymaking client approval,
works, small
Gypsum filletssupplying,
(wattas)
related -
fabricating,
around
For
work, Deck the delivering
periphery
slab, roof
including a 10extensionat site,
junctions
year guarantee hoisting
ponding
including and
under withfixing
columns,water,
suitable in position
curing
trusses,
undertaking including
testing
extension for
on stampall
ofwater MT 12.71 161,120 2,048,205.39 - - - - -
C.2 temorary
tightness
existing
Providing
paper etc, staging
by
members,
and ponding
complete fixingandsite supporting
with
welding
chemical
as water
directed. etc
grout work
for “and
7ofdays making
etc.,including
Hilti” for variousall structural
bars (12steel
protection to 25mm,work in Nos 40.00 1,796 71,840.00 - - - - -
C.3 accordance
screed/plaster
hilti
Mode make of with
chemical:
measurement etc the design,
complete
Re-500
to be drawings
and
max.
on 10 depthyrs
carpet-area
Supplying and installing in position Metal Decking Sheets ( Tata Bluescope and directions
guarantee
300 mm)
of floor on of
STAMP
including
and the
not project
PAPER
drilling
the area manager.
the ofOF
holes- Sqm 196.69 1,243 244,484.18 - - - - -
Thetherate
Rs.100/-
in of steel
complete.
concrete forwork shall
Measurement
anchoring include
the 1 coat
given
new is of redper
surface
reinforcement oxide
area primer
etc. (This isand 2 coats
basic of
C.4 surface
0.7mm
Providing
enamal
treated
thick Smartdeck
fabricating
paint assembly,
51 @
& erecting
welding,
7.35 kg/sqm)
structural
jointing,
as
steelwork
building
IS:1079
up in hotallsections
new
/complete
Galvanized
rolled sections
using
as per
for MT 2.00 230,171 460,342.00 - - - - -
requirement
the drawings contractor
and the to provide
directions detail product specification and
C.5 Steel
the
Providing (as per
staircase IS:277)
with
& laying grated
non Galvanized
traysgrout
shrink alloffinish.
the
bracings,
of project
The
FOSROCK manager.
metal
bolts, /sheets
plates
Sunanda to as
etc. be fixeddetailed
per
/ concrete
Krishna to/ the
MYK Cum 0.50 50,638 25,319.00 - - - - -
plates/
application.)
structural rolled section
one layer (including
on the cost
mother ofslabfasteners,
and 2nd nuts,
layer bolts
after and washers) layer
C.6 drawing
Laticrete
Reinforcement
and
after /framework
or
fabrication
piping
as per
Ardex
works for
out the
Endura
RCC with
of the
under workthe help
directions
Make
following
the GPof of
including
stone. 2,Thru-bolts
the
types project
undersupplying,
of
with
manager
side
structural
a minimum
ofdelivering
basesteelatplates
all heights
and
material
diameter
etc.
storing
with allofof
atand - - - - - -
½" and
levels shall
including be hot-dipped
removing galvanized
the scales or
&ofgrade stainless
burrs, of steel.
cleaning with Silicon
phosphoricwashers to
locations
various
Thermo
connections andusing
diameters heights
Mechanically as as required
required
Treated
plates, channels at
bars and
site of
and directions
work
angles,Fe-415 gussetthe
transporting, project
manufactured
plate, manager.
decoiling,
connectionby acid, MT 1.00 82,862 82,862.00 - - - - -
be used on
marking,
straightening, thecutting,
cutting, top andbending,
bottom
fabrication, of
hoisting the ,erecting
placing sheet while
in position bolting.
&tofixing
at Item includes
allindepths,
position, making
levels all
and
recommended
bolts,
material, cleats,
b) Treatment labour, listtools
fasteners
around of manufacturers
etc.
pipe
& as per
entry
tackles, the conforming
/ Scaffolding,
exit drawing.
locations :Steel IS conforming
Grouting
cleaning 1786
etc and- latest
complete torevision
sealing IS:226
as around
per
alignment
binding
as
and per withof 18-20
members,
specifications
IS:2062-Gr.A gauge,
with making
ofminimum
works soft andwelded/
drawn drgs.
yield bolted/of
locations
strength riveted
annealed
335 connections
steel binding andwire
the
TOTAL
the periphery
drawing OF joints
STRUCTURAL pipes passing
ofWORKS through the floorMpa and for
wallsplates.
in various 2,933,052.58 - - -
finishing
complete
(Fasteners,welding
locations by as and
etc complete.
filling
directions
per specifications
electrodes,
micro concrete
theand project
indrawings.
consumables
manager.
the gap between (Cost
will notofbe binding
the paid wireinshall
cut seperately.
outs be
the slab
borne
and theby
Rates the surface
inclusive
pipe contractor and& applying
of necessary binding
testswire as per
P.U. shall not be
technical
Sealant measured
specification)
around for payment.
the periphery joints
Rate includes cost of tests
of the pipes, as per manufacturers recommendation of materials by Contractor
GRAND TOTAL as specified
etc. complete (This is in the 6,170,512.58 - 570,024.92 570,024.92
Specifications
basic requirement and &IS) and preparing
contractor to provide and obtaining
detail product prior specification
approval of bar and
bending
application.) schedule .
For treatment around pipe entry will not be paid separately.
Contractor has to quote rate for entire system.
Prepared by: Aman Srivastava Contractor Sign & Stamp :
03/05/2020 ANNEX-A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Urinal area 1 1.660 1.975 3.28
WC=02 Nos 2 1.300 0.970 2.52
Threshold 2 0.750 0.200 0.30
JMR Page No. 25 0.00
Dismantling of Kota Flooring in Kitchen Service Corridor Pool 1 4.200 1.970 8.27
side
Less - 1 3.600 0.240 -0.86
1 8.000 1.970 15.76
MISSED MEASUREMENT 1 1.500 0.150 0.23
JMR Page No. 26 0.00
Dismantling of Kota Flooring in Kitchen Service Corridor Opp. 1 8.000 1.725 13.80
Cold Room 1 3.040 0.520 1.58
1 3.000 1.990 5.97
Near Cold Store Entrance 1 1.440 0.800 1.15
1 0.850 0.600 0.51
JMR Page No. 31 0.00
Dismantling of Marble Flooring in Guest Lift side Washroom 0.00
Entrance Area 1 1.750 1.690 2.96
Threshold 1 0.900 0.200 0.18
Threshold 1 0.870 0.190 0.17
Threshold 1 0.750 0.200 0.15
Ladies Toilet Washbasin Area 1 2.160 2.540 5.49
Less - 1 0.700 0.350 -0.25
WC=02 Nos 2 1.280 0.920 2.36
Threshold 2 0.680 0.200 0.27
Gents Toilet Washbasin Area 1 2.530 4.060 10.27
Less - 1 1.970 0.515 -1.01
Less - 1 0.600 0.160 -0.10
JMR Page No. 32 0.00
WC=02 Nos 2 1.280 0.920 2.36
Threshold 2 0.680 0.200 0.27
Less Column (Ladies Toilet) - 1 0.350 0.370 -0.13
0.00
Sqm Total Qty upto this bill 313.70
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 313.70 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Ladies Toilet Ent. Door 1 0.850 2.120 1.80
Ladies Toilet WC Door 2 0.720 2.120 3.05
Gents Toilet WC Door 2 0.750 2.120 3.18
Removing of Mirrors in Lounge Washroom 1 1.380 1.250 1.73
1 0.720 2.320 1.67
1 2.080 1.280 2.66
JMR Page No. 20 0.00
Removing of Doors in Villa Madici (Service Lift side) 2 1.620 2.550 8.26
JMR Page No. 22 0.00
Removing of Doors in Grill Area 2 1.500 2.250 6.75
JMR Page No. 23 0.00
Removing of Doors in Passage Between Kitchen and Service 2 1.650 2.450 8.09
Lift
JMR Page No. 25 0.00
Removing of Doors in Kitchen Service Corridor Pool side 1 1.500 2.310 3.47
1 1.500 2.310 3.47
1 1.760 2.800 4.93
JMR Page No. 26 0.00
Removing of Doors in Kitchen Service Corridor Opp. Cold 1 1.725 2.290 3.95
Room
JMR Page No. 29 0.00
Removing of Doors in Guest Lift side Washroom 0.00
Main Door 1 0.900 2.100 1.89
Ladies Toilet Entrance Door 1 0.750 2.100 1.58
Ladies Toilet WC Door 2 0.680 2.100 2.86
Gents Toilet Entrance Door 1 0.870 2.130 1.85
Gents Toilet WC door 2 0.680 2.100 2.86
Removing of Mirrors 0.00
Ladies Toilet W/B Mirror 1 1.800 1.540 2.77
1 0.730 1.200 0.88
Full Height Mirror 1 0.720 2.350 1.69
Gents Toilet W/B Mirror 1 1.800 1.540 2.77
JMR Page No. 33 0.00
Removing of Doors in Kitchen passage Near Cold Store 1 0.700 1.100 0.77
1 0.900 1.150 1.04
Store Near Stairs door 1 0.900 2.100 1.89
JMR Page No. 37 0.00
Removing of Doors in Lounge Area Service Corridor 1 1.700 2.170 3.69
1 1.070 2.140 2.29
0.00
Sqm Total Qty upto this bill 149.69
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 149.69 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
2 6.120 3.050 37.33
1 1.960 2.850 5.59
Stair sides 2 1.500 0.485 1.46
Offset 1 0.150 2.500 0.38
0.00
Sqm Total Qty upto this bill 283.06
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 283.06 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
1 0.200 3.770 0.75
1 0.600 3.100 1.86
Dismantling of 350mm thick Brick Wall Between Lounge Area 1 0.350 2.400 0.84
& Corridor (100mm thick)
Sqm Total Qty upto this bill 7.71
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 7.71 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Ledge wall 1 6.890 0.770 5.31
1 0.510 0.770 0.39
JMR Page No. 11 0.00
Dismantling of 230mm thick brick work in Kitchen 1 0.800 3.250 2.60
1 1.510 3.250 4.91
1 0.980 2.280 2.23
1 1.930 2.280 4.40
1 0.660 2.280 1.50
Shaft Wall 1 2.450 3.250 7.96
2 0.520 3.250 3.38
Corridor side wall 1 3.200 2.280 7.30
1 0.500 2.280 1.14
JMR Page No. 19 0.00
Dismantling of 230mm thick brick work in Villa Madici shaft 1 6.500 6.380 41.47
wall
JMR Page No. 20 0.00
Dismantling of 230mm thick brick work in Lounge Area shaft 1 2.600 3.100 8.06
wall
JMR Page No. 23 0.00
Dismantling of 230mm thick brick work in Pashmina Room 1 8.020 4.450 35.69
Service
JMR PageCorridor
No. 24side wall 0.00
Dismantling of 330mm thick brick work in Lounge Area 1 0.600 2.700 1.62
with columns 1 0.400 3.770 1.51
1 0.300 3.770 1.13
1 0.200 3.770 0.75
1 0.600 3.100 1.86
JMR Page No. 33 0.00
Cold Store Wall (200 mm) 1 0.850 3.200 2.72
1 0.615 3.200 1.97
1 0.800 3.200 2.56
1 1.050 3.200 3.36
1 0.900 3.200 2.88
Less Shaft door - 1 0.700 1.100 -0.77
Less Shaft door - 1 0.900 1.150 -1.04
1 3.000 3.200 9.60
Service Lift side 1 2.400 3.200 7.68
1 0.575 3.200 1.84
Corridor side wall 1 4.800 2.900 13.92
Less door - 1 0.900 2.100 -1.89
0.00
Sqm Total Qty upto this bill 208.30
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 208.30 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Less Ent. Offset - 1 3.200 0.400 -1.28
Less Shaft Area - 1 2.450 0.720 -1.76
Less Columns - 4 0.520 0.420 -0.87
Less Columns - 1 0.660 0.370 -0.24
Near Long Champ Entrance 1 3.515 2.570 9.03
1 2.340 2.120 4.96
1 2.180 1.700 3.71
Vertical Ceiling 2 14.250 0.300 8.55
2 3.650 0.300 2.19
Window side Vertical 1 15.850 0.500 7.93
JMR Page No. 15 0.00
Dismantling of false ceiling in Lounge Washroom 0.00
Entrance Area 1 2.470 1.855 4.58
Ladies Toilet Washbasin area 1 2.280 2.250 5.13
Above washbasin 1 1.490 0.350 0.52
WC-1 1 1.320 0.980 1.29
WC-2 1 1.320 0.930 1.23
Gents Toilet Washbasin area 1 2.860 2.115 6.05
Urinal area 1 1.660 1.975 3.28
WC 2 1.300 0.970 2.52
JMR Page No. 23 0.00
Dismantling of false ceiling in Passage Between Kitchen and 0.00
Service LiftMadici
Near Villa 1 6.800 1.670 11.36
Near Lift 1 5.800 1.650 9.57
Near Pashmina Room 1 3.000 1.650 4.95
JMR Page No. 25 0.00
Dismantling of false ceiling in Kitchen Service Corridor Pool 1 4.200 1.970 8.27
side
Less - 1 3.600 0.240 -0.86
Vertical 1 1.970 0.250 0.49
1 3.600 0.250 0.90
1 8.000 1.970 15.76
JMR Page No. 26 0.00
Dismantling of false ceiling in Kitchen Service Corridor Opp. 1 8.000 1.725 13.80
Cold Room 1 3.040 0.520 1.58
Vertical 1 5.910 0.850 5.02
1 3.000 1.990 5.97
JMR Page No. 32 0.00
Dismantling of False Ceiling in Guest Lift side Washroom 0.00
Entrance Area 1 1.750 1.690 2.96
Ladies Toilet Washbasin Area 1 2.160 2.540 5.49
Less - 1 0.700 0.350 -0.25
WC=02 Nos 2 1.280 0.920 2.36
Gents Toilet Washbasin Area 1 2.530 4.060 10.27
Less - 1 1.970 0.515 -1.01
Less - 1 0.600 0.160 -0.10
WC=02 Nos 2 1.280 0.920 2.36
JMR Page No. 34 0.00
Dismantling of MDF Board Ceiling in Store (Near Cold Store) 1 6.120 0.870 5.32
Waist slab bottom 1 5.600 1.150 6.44
JMR Page No. 35 0.00
Dismantling of False Ceiling insulation in Pashmina Room 2 7.850 1.000 15.70
JMR Page No. 36 0.00
Dismantling of False Ceiling insulation in Lounge Area 1 2.100 2.100 4.41
JMR Page No. 37 0.00
Dismantling of False Ceiling in Lounge Area Service Corridor 1 2.990 2.395 7.16
Vertical with wall 1 2.395 2.170 5.20
1 2.995 2.225 6.66
1 3.500 1.830 6.41
Less Offset - 1 1.330 0.250 -0.33
JMR Page No. 38 0.00
Dismantling of False Ceiling in Guest Lift Lobby 0.00
12th Floor 1 6.830 2.210 15.09
1 5.300 2.840 15.05
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Lounge Floor Guest Lift Lobby 1 5.365 2.870 15.40
JMR Page No. 39 0.00
Dismantling of False Ceiling insulation in Villa Madici 2 3.620 1.200 8.69
0.00
Sqm Total Qty upto this bill 1006.81
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 1006.81 Sqm
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
2 15.400 0.250
4 5.000 0.250
2 5.000 0.250
8 3.470 0.250
6 1.500 0.250
JMR Page No. 27
Dismantling of Wall False Cladding in Grill Area (Mezzanine) 2 4.300 3.100
JMR Page No. 34
Dismantling of False Ceiling (Double Layer) in Grill Area 1 18.100 8.120
(Mezzanine)
Central Beam Vertical 2 18.100 0.870
0.00
Sqm Total Qty upto this bill 150.00 PROV.
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 150.00 Sqm
B.1 Providing & doing well Burnt (First Class) Brick masonary in
all locationthick
a. 150mm with conventional
brick work type bricks in cement mortar 1:4
in
JMR superstructure
Page No. 37including striking joints, racking out joints, 0.00
watering,
Grill Area scaffolding
(Mezzanine) and cleaningside
Pashmina etc. door
complete. Rate also
closing 1 1.900 2.280 4.33
included providing & laying cast in situ RCC band beam
(Patli) in M:15 at 1200mm c/c with 2nos 8mm dia
reinforcement including shuttering, deshuttering, curing, Sqm Total Qty upto this bill 4.33
cleaning etc. completed at all heights and satifaction to the Sqm Less Qty upto previous bill 0.00
project manager. Net Qty upto this bill 4.33 Sqm
B.5 Providing & laying IPS flooring at any location as specified of Sqm
75mm thickness
Pashmina Room(avg.) with cement concrete nominal mix of 0.00
proportion
Window side 1:2:4 (cement
Passage : Sand
Area:- : Aggregate)
P.C.C. below IPS in Floor
correct level / 1 8.000 2.300 18.40
slope at all levels as per architectural drawings including 0.00
mixing of concrete in mixer, lifting, shifting to the work
Sqm Total Qty upto this bill 18.40
location, compacting / vibrating, finishing smooth to the
satisfaction of the project manager, curing, and cleaning the Sqm Less Qty upto previous bill 0.00
surface etc. complete. (Mode of measurements :Plan area of Net Qty upto this bill 18.40 Sqm
Flooring shall be measured for payment
03/05/2020 MS - A
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-B
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS :
Civil & ID works for Guest Floors renovations at Taj Mahal
Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0
CONTRACTOR RA BILL NO. : RA-01
Measurement Sheet for 12TH Floor - Dining, Meeting Room & Gym Area
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
E.8 Providing and fixing Mirror Paneling (MI4001) with 12 mm thick waterproof Sqm
ply of IS Challan
Delivery 303 grade
No.backing 6mm thick the
DSP/19-20/0475 Dt. mirror of approved
14.02.2020, make Plywood
Delhi Sales and 4 1.220 2.440 10.42
10mm shadow gap etc. all complete. Rate shall be inclusive of necessary
CONSIDERING ONLY 50% FOR NOW
fittings and fixtures of S.S. 316. Machined edge grounding of glass and
fixing shall be on to the ply with standard grade mirror silicon ( Dow corning
make) as per the dfawaing and directions of the project manager. Sqm Total Qty upto this bill 10.42
Sqm Less Qty upto previous bill 0.00
Ref. Dwg.: ID-1.6B.6-4
Net Qty upto this bill 10.42 Sqm
03/05/2020 MS - B
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS :
Civil & ID works for Guest Floors renovations at Taj Mahal
Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0
CONTRACTOR RA BILL NO. : RA-01
Measurement Sheet for 12TH Floor - Dining, Meeting Room & Gym Area
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
H.2 Pantry Cabinet No
Providing & placing
Delivery Challan No.Pantry Cabinet as per
DSP/19-20/0475 Dt.details given in
14.02.2020, specification.
Delhi Sales Plywood 2
TO BE CLAIMED AFTER MAKING IT'S RAW SHELL
Item No. : FR4052
Ref. Dwg. : ID-FR4052
Sqm Total Qty upto this bill 0.00
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 0.00 Sqm
03/05/2020 MS - B
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
A CIVIL WORKS
*Note: Supply and installation of SS false ceiling will be under client's scope.
A.1 Providing & Constructing Brick work 115mm thick masonry at all levels in Sqm 110.00 1,381 151,910.00
walls,
Upto piers90% and onarchitectural
Pro-rata completion features of using
works approved
10% upon blocks of required
completion of 1,243 - 59.19 59.19 - 73,569.24 73,569.24
strength
entire
10% upon cement
workcompletion
and mortar
handing1:5 Rate shall
of over
entire workbe and inclusive
handingofover 100 mm thick RCC 138 - - - -
band and shall be provided after every 1200mm height with concrete 1:2:4
A.2 Providing
reinforcedand withapplying
2 No. steel Cement
bars of sand 8 mm rough Plasterin1:4,
diameter 12-15mm
longitudinal thick over
direction Sqm 140.00 415 58,100.00 - - - -
Internal
andUpto
8mm Walls
90% / Columns
on
dia stirrups Pro-rataat 150/ completion
RCCmmSurfaces
centresof worksto transverse
in line10% level and
upon plumbas
completion
direction to specified
smooth
of 374 - - 140.00 140.00 - 52,290.00 52,290.00
finish
10% according
entire
for piers. upon to specifications.
workcompletion
Rate and
includes handing of over
curing, Rate
workshall
scaffolding,
entire include
andstaging, for
handingshuttering
overproviding G.I.chicken
& concreting 42 - - - - -
mesh
for RCC made bands outat ofallgalvanised
floors withironall of
leadnominal
and liftthickness
and aswith
per0.35 mm with a and
specification Zinc
A.3 Providing
coating of and120 laying average
Sqm at75mm thick PCC 1:3:6 20mm down works Sqm 100.00 424 42,400.00 - - - -
instructions
aggregate by gms
complete project per manager.
Flooring
the junctions
at the toilet
of masonry and concrete
A.4 Providing
to a width and of 100laying M:25 grade
to 125mm including tyingfloor
concrete with area
proper
in position after
with the
compaction drainage
suitable for works. Cum 3.00 14,271 42,813.00 - - - -
A.5 The cost tocasting
jacketing,
clamps/screws,
Waterproofing include theincluding
including
necessary
Works labour, all
breaking
staging, the material,
the old
: concrete
scaffolding
following accessories
and curing atcomplete
and carting away
all levels as
andper Sqm 350.00 1,027 359,450.00 - - - -
the instruction
debris
elevationsas specified and
etc.,making satisfaction
by the
complete of the all
consultant
as directed. project
Ratecomplete.manager.
shall
A.6 Providing and core cutting in RCC Up to include
200 mmforthickness,
proper hacking, - - - - -
a cleaning
a)
50 to 100and
Waterproofing
including mmas
cutting diadirected
treatment
steel by :project
Cleaning
reinforcement manager.
the surface
wherever to our cleaning,
required, requirements, removing Nos 4.00 2,219 8,876.00 - - - -
providing
debris andindicated
applyinglocationpolymeroutside based the flexible
site cementitious
etc complete waterproof
b 100 to at
coating 150 an mm diaof acrylic
consisting polymer mixed with cement,
as per drawing
applied in 2 coats Nos 4.00 3,117 12,468.00 - - - -
& directions of the project manager.
c 200
in thetoform
250 of mm dia over the RCC slab and on the vertical surfaces up to a
slurry Nos 4.00 5,073 20,292.00 - - - -
A.7 height 1.50
Providing andmtr. above
laying F.F.L.
light weight or as instructed,
AAC/ foam concrete including grouting
blocks under of,sunken Sqm 30.00 967 29,010.00 - - - -
A.8 construction
portion
Polished ofKota joints,
floors up honeycombs
Stone toflooring
the depth - 25oflocations,
300mm
mm cracks
thickincluding
stone slab etc. with crystalline
ramming
flooring and
( sample based
of Sqm 250.00 2,440 610,000.00 - - - -
non shrink
consolidation
kota stoneand cementitious
shallall complete
be approved grout
as to full
directed
by guards saturation,
by
the designer) the making
project small
manager. fillets
thick(wattas)
A.9 Providing fixing S.S. corner of full laid over
height up20 to mmthe ceiling base
from of Rmt 85.00 1,427 121,295.00 - - - -
around
cement the
mortarperiphery
1:4 junctions ponding with water, curing testing for water
A.10 finished
1st quality
tightness
floor,
bywall tiles( of
made
ponding
1
out cement
approved : 4make
of 16 gauge, course & sand
grade model 304 ) of
and jointed fixed
at corners
approved with
make cement
usinglike Sqm 300.00 1,450 435,000.00 - - - -
slurry
screws
KAJARIA with
etc. pigment
or all complete,
equivalent to with
match water
as
make the
per for
in detail
all
7 days
shade of the
drawings,
colours,
etc.,including
slab
shades, including
brush protection
finished
design grinding
and with
prints and
as
A.11 Providing
screed/plaster
mirror Pest
polishing control
etc and
complete
complete Anti-termite
andand also10 yrs treatment:
guarantee
protective sheetDrill
on to holes
STAMP
prevent atPAPER
the junction
scratches, OF Sqm 60.00 231 13,860.00 - - - -
protective
approved
of wall and coating,
by the
floor at rounded
project
1sqft manageredges&
intervals all
over as
inject per
12mm in instruction
thick
approved bed and
of
anti entire and
cement
termite mortar 1:3
Rs.100/-
curing
satisfaction complete.
etc., all
the complete
of Measurement
the as
project per the
manager. given
drawing is surface
and area (This
directions of is basic
the project
(1cement:
sealing
requirementthe 3holes
coarse sand)
thereafter
contractor to and
with
provide jointed
white
detail with
cement greyand
product cement
spray slurry
specification all @ 3.3kgwalls
exposed
and per
TOTAL
manager.
Sqm.flooringOF
including CIVIL WORKS
pointing inanti
white cement mixed with pigment 1,905,474.00 - 125,859.24 125,859.24
and
application.) surface
one layer withon the termiticide
mother slab spray
and by 2nd appointing
layer afterof matchinglayer
aconcrete
specialized
shade
agency
after complete.
as per
piping the40/sqft
specifications mentioned by the Bureau of Indian
Basic Rate -works
Rs. under the stone.
Standards and Agencies specifications (whichever GRAND TOTAL is higher), for General 5,183,190.00 - 125,859.24 125,859.24
Basic
Civil, rate - Rs
Plumbing,/
b) Treatment 35/Sqft
aroundDrainage and timber/
pipe entry Carpentry
/ exit locations works, Gypsum
: Grouting and sealing relatedaround
work, including joints
the periphery a 10 year of pipesguarantee
passingunder through suitable undertaking
the floor and wallson instamp
various
paper
locationsetc,by complete
filling micro as directed.
concrete in the gap between the cut outs in the slab
Mode
andAman
theofpipe
measurement
surface and to applying
be on carpet-area
P.U. Sealant of floor and not
around the the area ofjoints
periphery
Prepared by: Srivastava Contractor Sign & Stamp :
surface treated.
of the pipes, as per manufacturers recommendation etc. complete (This is
basic requirement & contractor to provide detail product specification and
application.) For treatment around pipe entry will not be paid separately.
Contractor has to quote rate for entire system.
03/05/2020 ANNEX-C
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man
Singh Road, New Delhi
DAVI CERTIFICATE NO Dec-99
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
A CIVIL WORKS
*Note: Supply and installation of SS false ceiling will be under client's scope.
A.1 Providing & Constructing Brick work 115mm thick masonry at all levels in Sqm
walls,
115mm piers
thickand architectural
Brick Work features using approved blocks of required 2 5.950 2.400 28.56
strength
Low Heightcement
Wall mortar 1:5 Rate shall be inclusive of 100 mm thick RCC 2 4.260 1.330 11.33
band and shall be provided after every 1200mm height with concrete 1:2:4
Wall
reinforced with 2 No. steel bars of 8 mm diameter in longitudinal direction 1 5.950 2.400 14.28
Less8mm
and Opening
dia stirrups at 150 mm centres in transverse direction as specified - 1 3.400 1.100 -3.74
for piers. Rate includes curing, scaffolding, staging, shuttering & concreting 1 0.750 2.400 1.80
for
WallRCC bands at all floors with all lead and lift and as per specification and 1 2.400 2.400 5.76
instructions by project manager.
1 0.500 2.400 1.20
0.00
Sqm Total Qty upto this bill 59.19
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 59.19 Sqm
A.2 Providing and applying Cement sand rough Plaster 1:4, 12-15mm thick over Sqm
Internal Walls
15mm thick / Columns
plaster / RCC
on Brick wallSurfaces to line level and plumb to smooth 4 5.950 2.400 57.12
finish according
Low Height Wall to specifications. Rate shall include for providing G.I.chicken 4 4.260 1.330 22.66
mesh made out of galvanised iron of nominal thickness 0.35 mm with a Zinc
face
coating of 120 gms per Sqm at the junctions of masonry and concrete works 2 0.130 1.330 0.35
Wall
to a width of 100 to 125mm including tying in position with suitable 2 5.950 2.400 28.56
clamps/screws,
Less Opening necessary staging, scaffolding and curing at all levels and - 2 3.400 1.100 -7.48
elevations etc., complete as directed. Rate shall include for proper hacking, 1 0.750 2.400 1.80
cleaning and as directed by project manager. 1 0.865 2.400 2.08
Wall 2 2.400 2.400 11.52
1 0.920 2.400 2.21
Villa Madici side wall (Old hood side) 1 14.005 2.950 41.32
JMR Page No. 38 0.00
Extra 15mm thick Cement Plaster on Villa Madici side wall (Old Hood Area) 1 14.005 1.800 25.21
due to undolation of wall 0.00
Sqm Total Qty upto this bill 185.34
Sqm Less Qty upto previous bill 0.00
Net Qty upto this bill 185.34 Sqm
03/05/2020 MS - C
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-D
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-D
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal
Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
Ref. Dwg.-ID-1.6B.6-1
Name: Rovere Oak (Colour stain to match WD-4004)
Finish: 30% gloss, Water-based PU
03/05/2020 MS - D
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
V WASHROOM
Note: Metal parts to be used while making furniture items shall be madde of
D SS + appropriate
FLOORING WORKS coating to match the finish and other work shall use SS + -
D.1 PVD coating.
Providing and laying of following types of approved machine cut, machine - - - - -
a polished Flooring
General marble flooring(ST1004) in pattern and size as detailed in drawing and as Sqm 38.00 10,588 402,344.00 - - - -
directed by the project
Name: Botticino Fioritomanager. Marble to be bedded over minimum 20mm
b Accent Flooring (ST1004 with ST1002 border) Sqm 18.00 11,232 202,176.00 - - - -
thick cement
Finish: Silver
Polished sand mortar mix ratio 1:6 (1 cement : 6 sand) including
Name: Portoro (ST1002)
cleaning and preparing the surface for bedding, spreading neat cement - - - -
Finish: Polished
slurry
TOTAL byFOR usingFLOORING
minimum cement WORKS about 3 kg/sqm prior to bedding and 604,520.00 - - -
spreading cement paste using minimum cement about 4.5 kg/sqm over - - - -
bedding, joints to be cleaned and grouted with matching colour approved
E WALL FINISHING WORKS -
quality polymer based readymade grout (Bal or Laticrete or equivalent
All plywoodcuring,
approved), shall becleaning,
of BWR polishing grade except for wash
to required room
line, or/protecting
level, and wet areas till - - - - -
E.1 which
Providing
handing shall
overand beetc.Marine
fixingall of grade
Marbleplywood.
complete Dado fixed over
at all heights andwhiteleadscement mortar 1:4 as
to the satisfaction of - - - - -
a per site
the project
General conditions
Stone manager. to
(ST1004) make the surface in level with quality seal coat Sqm 58.00 12,015 696,870.00 - - - -
application
Name: Botticino on all sides,
Fiorito laid in proper line and level. The Dado shall be done
b Accent Stone (ST1006) Sqm 4.00 34,342 137,368.00 - - - -
as
Ref.per
Finish: design
Dwg. / pattern as specified inclduing providing 10mm shadow gap
- ID-1.6D.4
Polished
Name: Tiger
Providing Onyx
E.2 as shown and , soap fixing
dish125mmniche, WC highledge,
approved etc. machine cut, machine
all other necessary polished
related Rmt 180.00 1,685 303,300.00 - - - -
Finish:
19mm Polished
thick
E.3 works as
Providing & approved
shown fixingononthe marble
sitedrawings.
Veneer stoneWall(ST1004)
Cost to include
panelling skirting
labour,
(WD-1002) including
materials,
finish10mm made of Sqm 38.00 9,364 355,832.00 - - - -
shadow
wastages, gap as shown in completion,
the drawing and as directed by the ofproject
12mm oncleaning
35%thick MR grade
completion after plywood
of raw shell necessary
over(including
Aluminium protection
framework
shutters) and inclusive
size 25x50 of 3,277 - - 17.86 17.86 - 58,537.64 58,537.64
manager.
all lead,
mm lifts
sections Marble
etc.
as per shall
complete, be fixed
as per
manufacturer's over
the pre-plastered
instructions and
specifications masonry/
with to the RCC
spacing surfaces
satisfaction
of 16" - 24" of
by 30%
theusing on fixing
approved of veneer/ laminate/ Fabric and any other finishing 2,809 - - - - -
c/c project
horizontally manager.andcompatible
Sample both
vertically toadhesive
beways
submitted (Bal or
.The toLaticrete
12mm thickor
designers equivalent
group
plywood for
surface to
products
approved)
25% onmachine
approval, to correct
polishing/ line, level
painting
polishing/ and plumb.
& fixing
finishing/ of Joints
accessories
cleaning are well cleaned and 2,341 - - - - -
be finished with 3 mm thick veneer as per designetc andasdrgs.per design
as perand drg,
grouted
drawing,
including
5% on with
all matching
specification
necessary
virtual completion colour
and
endas approved
directed by
mouldings, polymer
project based
moulding manager,
pattern, readymade
etc.polish.
and grout
Ant and
all complete. 468 - - - - -
cured, cleaned
termite treatment andto including
plywood finishing junction
including all leads of& plaster
lifts etc. all as
complete complete
per theat
all 5%
heightson handover 468 - - - - -
Ref. Dwg.
detailed drg. :-and leads toand
ID-1.6D.6-1
& design theas satisfaction
instructedofbythe project
project manager.
manager.
E.4 Providing and fixing mirror panelling (MI1001) with 15mm wide metal border Sqm 18.00 38,300 689,400.00 - - - -
(MT1001)
Ref.
Ref.35%Dwg.
Dwg.: on
- ID-1.6D.6-1of raw shell (including shutters) drawings. The frame
aluminium
ID-1.6D.4
on -completion framework as per the detailed 13,405 - - 8.93 8.93 - 119,706.65 119,706.65
work shall be fixed to the wall with necessary anchor screws.The 12mm
30% on fixing of veneer/ laminate/ Fabric and any other finishing 11,490 - - - - -
thick marine grade plywood shall have provision of indirect lighting, if
products
25% on polishing/
required. The plywoodpainting surface &shall fixingbeoffixedaccessories
with 6mm thick edge polished 9,575 - - - - -
clear5%mirror.
on virtual The completion
mirror shall be properly fixed using in combinolion of 3M 1,915 - - - - -
make double
5% on handover sided tape with primer applied lo ply and mirror and 1,915 - - - - -
Dowcorning / Mcoy make silicon sealants with necessary
E.5 Fixing wall paper (WP- 1001) finish
SS studs arrangements as per the drawing and directions . Cost to include preparing of the wall surface
project Sqm 36.00 433 15,588.00 - - - -
E.6 having
Providing
manager. one& The coat
fixing of5primer
frame mmandx 15 andmm putty and
high one trim
metal coat(MT-1001)
of enamel in paint
the in proper
marble Rmt 172.00 1,059 182,148.00 - - - -
line ply
dado
the and levelbe
running
shall in all direction
vertically
see inside andand foronlyapplying
horizintally mirror towall
be covering
fixed
shall bewih as peras
adhesive
projected theper
in thethe
manufacturer specification. - - - -
pattern,
drawing. shade, etc. as per drawing & instruction of the project manager.
TOTAL FOR WALL FINISHING WORKS 2,380,506.00 - 178,244.29 178,244.29
ClientDwg.
Ref. Supplied ID-1.3.6-1Item : Wall Paper
- ID-1.6D.6-1 - - - -
F Ref.
CEILINGDwg.FINISHING
:- ID-1.6D.6-2 WORKS -
F.1 Providing and fixing at site False Ceiling of Plaster of Paris installed flat or Sqm 56.00 2,624 146,944.00 - - - -
F.2 taper or vertical
Providing & fixing orTrap
Cobedoor or making
(hinged) grooves
of sizesonasthe perjunction of wallswith
the drawings andthe Sqm 1.50 13,810 20,715.00 - - - -
ceiling where
suitable ever required to(section do so on grid framework comprising of rolled
F.3 Providingframe & applying& suspenders
paint on ceiling, Slab 50mm x 50mm).
soffit, beamsSingle cornice shutter
etc atmade
all Sqm 56.00 363 20,328.00 - - - -
galvanized
out of 19mm metal
marine sections consisting of theleaping
main channels
levels
Providingwithand two coats plywood
installing of approved
POP
& teak
Cornice
wood
primer and
size three
of lock, 20
hinged
coats toapproved
20ofmm
the framepaint-as
F.4 (50mmx25mmx22SWG)
shown in drawing including to run
P/f in onekey
allen direction atmm
hinges,1000mm xsafety c/c shapes
and
chain, as per Rmt 95.00 184 17,480.00 - - - -
Acrylic
drawing Premium
including emulsion.,
all supporting including labour,
material, preparation
POP , lead of surface,
lift etc complete.
secondary
necessary ceiling section
hardware, sand finished70mm x23mm
with 4mm x24SWG
thick approved at 450mm c/c
veneerason in other
one side - - - -
levelling
direction ,connected
scrapping, topaint
main papering,
channel scaffolding,
with GI connectingall materialsclipsmake
of 10 per
and
TOTAL synthetic
drawings FOR enamel
CEILING by( Project
FINISHING primerWORKS+Manager.
3 coats )(Note:
of approved &SWG
shade of 205,467.00 - - -
Ref. Dwg etc,
approved -quality.as
0.4.7-1 directed
with above 500mm patta smooth
Measurement
finish required (Mode
as per
to put of
on other side etc. complete as instructed
IS 1200) (Make : Dulux or equivalent as per project manager advice). Mode by the project manager. - - - -
light in line level.: Area
measurements The grids of trap shalldoor beopening
suspended from
shallwillbebe structural for
measured slabpayment)
by MS
G of measurement
DOORS
strap & WINDOWS
hangers area as
25mmx3mm seen
WORKS sizein@ plan.
1000mm Nothing C/C both paid
waysextrafrom structural -
*Note:
slab byRate
usingquoted for frame
soffit cleats andshall include fasteners.
expandable the provision G.Ifor sub-frame
wire mesh 24of the - - - - -
Item Finishing
required size asNo. :- directions
PT-1003 of the project manager.
SWG GI
Toilet Door shall beper
stretchedand tight
fixingover the frame workdoor and plaster of Paris
G.1 Ref. Dwg. :-- ID-1.6D.2
Providing 50 mm thick flush shuttersof size Nos 4.00 126,364 505,456.00 - - - -
avg. 12mm
1000mm thick is applied, trowelled or floated to produce smooth surfaces
G.2 WC Door x- 2350mm
Providingconforming
and fixing 50 to IS:
mm2202
thick(Part
flushI)door
decorative
shutterstype, solid
of size Nos 8.00 113,704 909,632.00 - - - -
i/c providing
wood
800mm (IC/CPT)
x 2350mmframecorework for light fixtures
of WD-1002
conforming with , A/C
frame ofgrills,
1st diffuser,
class hardshadow
wood solidline
(IC/CPT)
G.3 Providing,
etc.as per making and
drawing no. fixing in to IS: 2202
position (Part
selected I)seasoned
decorative type,
(Ivory Coast/ Cum 0.55 294,619 162,040.45 - - - -
size as(IC/CPT)
wood per the drawing and well matched
core of WD-1002 with frame teak 3 ply
of 1st veneering
class hard with (IC/CPT)
15mm
CPT
Modeor
wide ofas
metal per approval)
measurement
moulding second
area
finished as
in class
seen inteak
MT-1002 plan
on wood
area.
both in frames
Nothing
faces of of wood
will doors
be paid
shutters asmade
extrato
per
size as per the drawing andshown
well matched teakwith
3 ply veneering with 15mm
03/05/2020 size,
design
shape
for verticals,
of the
and design as
grooves
drawingand anddrops
in drawing,
etc.
directions of theonproject
mitred
manager
joints fixed
including
with ANNEX-E
wide metal
40x3mm flatmoulding
iron holdfinished
fast 400mmin MT-1002
long embeddingboth faces of shutters
for concrete as per
blocks
Stainless
design ofx steel
the (304 Grade)
drawing butt hinges the
and directions withproject
two ball bearings, 100 mm X
300mm
Ref. Dwg. 100mm
:-mm x 150mm
ID-1.6D.2 in cementofconcrete 1:2:4manager including
in contact with brick
75 mm
StainlessX 3steel of ofGrade)
(304 approved buttmake
hingeswith necessary
with screws, with
two ball bearings, 100allmm X
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
VI Ref.
LIFTDwg.
LOBBY-ID-1.6D.6-1
ID-1.6D.5
Note: Metal parts to be used while making furniture items shall be madde of
D SS + appropriate
FLOORING WORKS coating to match the finish and other work shall use SS + -
D.1 PVD coating.
Supplying ,fitting and fixing of (ST-401) Marble Flooring with accent stone Sqm 63.00 17,033 1,073,079.00 - - - -
flooring (ST-402) with uniform texture and without decorative veins in floor - - - -
with 15 mm thick (avg) cement mortar 1:2 including making suitable
TOTAL FOR FLOORING WORKS 1,073,079.00 - - -
arrangement to hold stone properly by adhesives including pointing the
cement mortar (1:2) (1 white cement :2 marble dust) with admixture of - - - -
E WALL FINISHING
pigment matching the WORKS
marble/ stone shade, pattern & all sizes as per the -
E.1 drawings, and
Providing all complete
fixing of 100mm as per direction of project
high (ST-401) manager.marble
pre-polished (Using skirting
cement Rmt 60.00 1,897 113,820.00 - - - -
E.2 slurryaPunning:
with
POP at
5mm backside
chamfering of marble/
Providing onandtopstone
edge@skirting
applying 315-18mm
Kg/ sqm and white
of approved
average cement
colour
thick andslurry
POP finish
punning for Sqm 53.00 359 19,027.00 - - - -
jointplastered
on fillingto@existing
matching 1.8 Kg/
walls sqm) hacking
flooring
including fixed on ofwall with necessary
existing surface andhardwares
all staging in
E.3 Providing & fixing on site Veneer Wall panelling (WD-401) made of 12mm Sqm 46.00 10,254 471,684.00 - - - -
approved necessary
including grout, colour and sealed
scaffolding, with approved
materials, labour,quality
lead, sealant,
lifts, laid in
necessary
thick
35% MRon
Location:
proper grade
Lift plywood
completion
Lobby ofover
raw Aluminium framework
shell (including shutters) of size 25x50 mm 3,589 - - 22.33 22.33 - 80,125.78 80,125.78
finishes,line
sections in
asof
and
true
per
level.
'line &Finishing/Polishing
levels, tospecifications
manufacturer's
to be
plumb, right as directed
angle, withoutby
with spacing
the project
waves,
of smooth
16" - 24" c/c
Base
manager.
30% Rate onCost
finish, all complete Marble:
fixing to include
of Rs.
veneer/
as directed400/sqft
labour, materials,
laminate/
by Fabric
the.The
project wastages,
and any
manager. cleaning
other after
finishing 3,076 - - - - -
horizontally
Ref.products and
Dwg. :- necessary vertically
ID-0.4.4, 0.4.7-1 both ways
& ID-1.6E.4 12mm thick plywood surface to be
completion,
25% with on polishing/ protection
painting and
& fixing inclusive of all lead, lifts etc. complete,
finished 3 mm thick veneer, 45mmofx accessories
10mm or 25mm x 10mm (at edges/ 2,564 - - - - -
as per
Ref. Dwg.the :- instructions
ID/0.1.4 and to the satisfaction of the project manager.
bottom/
5% on top) moulding with 5 mm grooves provided as per drg, including all
(Sample tovirtual completion
be submitted to designers group for approval) 513 - - - - -
necessary
5% on handover moulding pattern, and polish. Ant termite treatment to plywood 513 - - - - -
including all leads & lifts complete as per the detailed drg. & design and as
E.4 Ref. Dwg. and
Providing :-ID-0.4.7-2
fixing all sides polished natural stone (ST-402) as specified in Rmt 13.00 4,935 64,155.00 - - - -
instructed by project manager.
E.5 the drawing
Providing of approved
& Fixing 4mm Veneerquality, panelling
pattern, colour
(WD4001) and thickness
of Approved for door
Shade & Sqm 12.00 9,667 116,004.00 - - - -
architraves
Texture
Ref. Dwg.: (150
on -12mm mm
ID-0.4.6-3,thickwideBWR x 50
0.4.7-2&3 mm&thick)
grade Plywood including
ID-1.6E.4 preparing
with Marine the surface
adhesive including
andgroove
levelling in the etc. desired line, machine cutting, jointingand in approved - - - -
the Pattern all complete as per the drawing directions of the
TOTAL
adhesives, FOR WALL FINISHING WORKS
levelling, smooth cement plastering along the sides to match the 784,690.00 - 80,125.78 80,125.78
project manager.
existing surface in cement mortar, filling the joints with pigment mixed with - - - -
F cement, cleaning,
Smokingfinishing,
CEILING FINISHING
Location: RoomWORKS curing etc complete as directed by project -
F.1 manager.
Ref. Dwg. and
Providing - ID-1.6E.6-2
fixing at site False Ceiling of Plaster of Paris installed flat or Sqm 63.00 1,910 120,330.00 - - - -
F.2 taper
Providingor vertical
and or CobePOP
installing or making
Cornice grooves
of sizeon100 themm junction
x 100ofmm walls and as
shapes Rmt 60.00 470 28,200.00 - - - -
Ref. Dwg.:
ceiling where - ID-0.4.6-3
ever required & ID-0.4.7-2
to do so material,
on grid framework comprising of rolled
F.3 per drawing
Providing & including
applying all supporting
paint on ceiling, Slab POP
soffit, , lead
beams lift etc complete.
cornice etc at all Sqm 63.00 363 22,869.00 - - - -
galvanized metal sections consisting of the main channels
levels with two coats of approved primer and three coats of approved paint- - - - -
(50mmx25mmx22SWG)
Ref. Dwg - 0.4.7-1 & to run in one direction at 1000mm c/c and
ID-1.6E.2
Acrylic Premium emulsion., including labour, preparation of surface,
secondary
TOTAL FOR ceiling
CEILING section 70mm x23mm
FINISHING WORKS x24SWG at 450mm c/c in other 171,399.00 - - -
levelling , scrapping, sand papering, scaffolding, all materials as per
direction connected to main channel with GI connecting clips of 10 SWG of - - - -
drawings etc, as directed by Project Manager. (Note: Measurement as per
approved quality. with above 500mm patta smooth finish required to put
G DOORS
IS 1200) & WINDOWS
(Make : DuluxWORKS or equivalent as per project manager advice). Mode -
light in line level. The grids shall be suspended from structural slab by MS
of measurement
Single leaf Door ,area
50 mm as seen
thick in plan. (concealed
Nothing willdoor), be paid extrarated fire
G.1 strap hangers 25mmx3mm sizeshutter
@ 1000mm C/C both 1 hour
ways from structural No 2.00 69,926 139,852.00 - - - -
door,
Teak
slab by structural
wood
using opening
of soffit
approved size
cleatsmakeand- expandable
950mm
(IC/ CPT):x 2600mm,
fasteners. inner G.Iside
wiretomesh
be finished
24 - - - - -
Item Finishing
in paint (PT-401) No. :- PT401
& outer side to over
be finished withwork
4 mm thick veneer (WD-
SWG
a) S.S GI shall
butt:-bearingbe stretched
Hinges tight the frame
102mm x 76mm x 3mm - 4 Nos. and plaster of Paris - - - - -
Ref.
401) Dwg.
including ID/0.4.2
all & ID-1.6E.2
hardwares mentioned below as per Hardware Schedule,
avg. 12mm thick is applied, trowelled or floated to produce smooth surfaces
as per drawings,
i/c providing frame FFE workschedule
for light&fixtures
directions
, A/C ofgrills,
the project
diffuser, manager
shadow line
03/05/2020 (Location
etc.as per:drawing Staircase no.Entry Door) ANNEX-E
Mode of measurement area as seen in plan area. Nothing will be paid extra
Ref. Dwg. :- ID-D12-1
for verticals, grooves and drops etc.
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-E
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi ]
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel,
Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
V WASHROOM
E.3 Providing & fixing on site Veneer Wall panelling (WD-1002) finish made of Sqm
12mm
Deliverythick MR grade
Challan plywood over Aluminium
No. DSP/19-20/0475 framework
Dt. 14.02.2020, of Sales
Delhi size 25x50
Plywood 6.00 1.220 2.440 17.861
mm sections as per manufacturer's specifications with spacing of 16" - 24"
CONSIDERING ONLY 50% FOR NOW
c/c horizontally and vertically both ways .The 12mm thick plywood surface to
be finished with 3 mm thick veneer as per design and drgs. as per drg, Sqm Total Qty upto this bill 17.86
including all necessary end mouldings, moulding pattern, and polish. Ant Sqm Less Qty upto previous bill 0.00
termite treatment to plywood including all leads & lifts complete as per the Net Qty upto this bill 17.86 Sqm
detailed drg. & design and as instructed by project manager.
E.4 Providing
Ref. Dwg.:and fixing mirror panelling (MI1001) with 15mm wide metal border
- ID-1.6D.6-1 Sqm
(MT1001) on aluminium
Delivery Challan framework as per
No. DSP/19-20/0475 Dt.the detailed drawings.
14.02.2020, The
Delhi Sales frame
Plywood 3.00 1.220 2.440 8.930
work shall be fixed to the wall with necessary anchor screws.The 12mm
CONSIDERING ONLY 50% FOR NOW
thick marine grade plywood shall have provision of indirect lighting, if
required. The plywood surface shall be fixed with 6mm thick edge polished Sqm Total Qty upto this bill 8.93
clear mirror. The mirror shall be properly fixed using in combinolion of 3M Sqm Less Qty upto previous bill 0.00
make double sided tape with primer applied lo ply and mirror and Net Qty upto this bill 8.93 Sqm
Dowcorning / Mcoy make silicon sealants with necessary
SS studs arrangements as per the drawing and directions of the project
VI LIFT LOBBY
manager. The frame and
E.3 the ply shall
Providing be see
& fixing oninside and only
site Veneer mirror
Wall shall be
panelling projected
(WD-401) as per
made the
of 12mm Sqm
drawing.
thick MRChallan
Delivery grade plywood over AluminiumDt.
No. DSP/19-20/0475 framework of size
14.02.2020, 25x50
Delhi Salesmm
Plywood 7.50 1.220 2.440 22.326
sections as per manufacturer's specifications with spacing of 16" - 24" c/c
CONSIDERING ONLY
Ref. Dwg. - ID-1.6D.6-1 50% FOR NOW
horizontally and vertically both ways .The 12mm thick plywood surface to be
finished with 3 mm thick veneer, 45mm x 10mm or 25mm x 10mm (at edges/ Sqm Total Qty upto this bill 22.33
bottom/ top) moulding with 5 mm grooves provided as per drg, including all Sqm Less Qty upto previous bill 0.00
necessary moulding pattern, and polish. Ant termite treatment to plywood Net Qty upto this bill 22.33 Sqm
including all leads & lifts complete as per the detailed drg. & design and as
instructed by project manager.
03/05/2020 MS - E
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-F
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
03/05/2020 ANNEX-F
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi ]
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj
Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
C.6 Console No
Providing
Console & placing Console as per details given in specification. 1 1.000
03/05/2020 MS - F
Client: Indian Hotels Co. Ltd. Project: Taj Mahal Hotel, New Delhi ]
PROJECT CODE: ID0004
PROJECT NAME: TAJ MAHAL HOTEL, NEW DELHI
WORK ORDER NO. : IHCL/TMH/CHAMBER/SCG/2019-20/30
WORK DETAILS : Civil & ID works for Guest Floors renovations at Taj
Mahal Hotel, Man Singh Road, New Delhi
DAVI CERTIFICATE NO 0%
CONTRACTOR RA BILL NO. : RA-01
Height /
Sr.No Item Ref. Desription Unit No. Length Width Quantity Remark
Depth
03/05/2020 MS - F