Barge or pontoons have flat hull or shaped a large box that floats, construction a
barge without a shipboard system in general. A barge used for transporting
cargo and drawn by tugs or used to accommodate shatt which dependent
current the tides like a river and shallow port.
A barge not having a machine ( unpropelled ) that it must be drawn by tugs. Tug
boat and barge inseparable. It can be said Inseparable because, without barge,
tugboat can not carry much cargo. But because a barge unpropelled so tug boat
role as barge motors. In the process berthing / unberthing a barge need help at
least 1 tug boat additional, because in manufacturing a barge different from
ships in general.
1. Loading Conveyor
loading process starts from stockpile cargo loaded using conveyor from above a
barge. Altitude conveyor must above the height of a barge to cargo be loaded
maximum. Loading with this method have requirements quantity cargo conveyor
must be stable and supplies stockpile must charge enough, so that the stability
of barge and cargo can reach.
Loading barge with conveyor
*Note :
-180 ft Barge = Capacity 2000 MT
-200 ft Barge = Capacity 2500 MT
-230 ft Barge = Capacity 3000 MT
-250 ft Barge = Capacity 3500 MT
-270 ft Barge = Capacity 5000 MT
-270 ft jumbo Barge = Capacity 7000 MT
-300 ft banci Barge = Capacity 7000 MT
-300 ft Barge = Capacity 8000 MT
-330 ft Barge = Capacity 9000 ton
-330ft jumbo Barge = Capacity 11.000 MT