Вы находитесь на странице: 1из 10

CRONOGRAMA DE ADQUISICION DE INZUMOS

OBTA CONSTRUCCION PLAZA DE ARMAS - SANTA ROSA


PRECIOS AL: 25/08/2007
DISTRITO SANTA ROSA
PROVINCIA JAEN
DEPARTAMENTO CAJAMARACA

Mes 1 Mes 2 Mes 3 Mes 4 Mes


Descripción Insumo Unidad Cantidad Precio Parcial
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
MANO DE OBRA
MANO DE OBRA
ACERO DE REFUERZO FY=4200 GRADO 60 KG 958.63 2.78 39.09 100 39.07
VARILLA DE FE CORRUGADO DE 1/2" VAR 50.00 25.50 3,483.86 20 697.85 35 1,221.23 25 872.31 15 523.39 5
VARILLA DE FE CORRUGADO DE 3/8" VAR 16.00 14.50 2,401.16 20 480.05 35 840.09 25 600.07 15 360.04 5
VARILLA DE FE CORRUGADO DE 1/4" VAR 100.00 6.50 2,269.09 15 340.32 85 1,928.49
ALAMBRE NEGRO RECOCIDO # 16 KG 30.00 3.80 851.18 15 127.67 85 723.48
ALAMBRE NEGRO RECOCIDO # 8 KG 12.00 3.80 120.96 100 121.08
ARENA FINA M3 5.00 16.00 1,565.54 10 156.44 45 703.98 25 391.10 15 234.66 5
ARENA GRUESA M3 9.00 28.00 20,422.72 10 2,042.57 45 9,191.58 25 5,106.44 15 3,063.86 5
CEMENTO PORTLAND TIPO I (42.5KG) BOL 150.00 18.80 118.38 100 118.40
CERAMICA CELIMA 20X30 CM SERIE ARELLA COLOR GRISS M2 9.00 20.00 2,793.15 15 419.49 85 2,377.13
CERAMICA DE 40x40CM M2 36.00 20.00 948.61 15 141.37 85 801.09
CLAVOS CON CABEZA DE 2 1/2", 3", 4" KG 18.00 3.80 201.74 100 201.80
CLAVOS PARA MADERA C/C 3" KG 1.00 3.50 3,000.00 100
FRAGUA GRIS CLARO KG 10.00 3.50 4,000.00 100
FRAGUA NOVACEL KG 7.00 3.50 3,500.00 100 3,500.00
HORMIGON M3 8.00 40.00 6,000.00 100 6,000.00
LADRILLO ARTESANAL O SIMILAR DE 6x12x24 CM UND 5,000.00 0.18 25,958.26 20 5,190.09 35 9,082.65 25 6,487.61 15 3,892.57 5
LADRILLO HUECO 30 X 30 X 15 CM UND 550.00 1.40 96.62 100 96.64
MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 400.00 0.20 180.82 100 179.17
PIEDRA CHANCADA DE 1/2" M3 1.00 70.00 77,951.19 9,775.03 27,446.72 13,457.52 17,574.51
PIEDRA CHANCADA DE 3/4" M3 4.00 70.00
PIEDRA GRANDE DE 8" M3 2.00 35.00
PIEDRA MEDIANA DE 3" M3 1.00 35.00
MEZCLADORA DE CONCRETO
VOLQUETE
CRONOGRAMA DE ADQUISICION DE INZUMOS

Mes 1 Mes 2 Mes 3 Mes 4 Mes


Descripción Insumo Unidad Cantidad Precio Parcial
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
MATERIALES
ACERO DE REFUERZO FY=4200 GRADO 60 KG 5,517.97 2.96 16,333.19 7 1,143.88 93 15,197.21
AFIRMADO M3 264.19 120.00 31,702.80 100 31,703.04
ALAMBRE NEGRO N°16 KG 272.39 3.80 1,035.08 43 453.89 57 590.03
ALAMBRE NEGRO N°8 KG 248.94 3.80 945.97 35 331.71 65 616.04
ALMACEN DE OBRA MES 5.00 200.00 1,000.00 25 250.00 25 250.00 25 250.00 25 250.00
ARENA FINA M3 143.90 120.00 17,268.00 45 7,770.71 40 6,907.30 10 1,726.82 5 863.41
ARENA GRUESA M3 139.99 120.00 16,798.80 45 7,559.78 40 6,719.80 10 1,679.95 5 839.98
BANCA DE FO GALVANIZADO GLB 2.00 1,200.00 2,400.00 100
CABLE NYY DE 2X16 M 250.00 17.00 4,250.00 100 4,250.00
CAJA DE CONCRETO P/POZO DE TIERRA UND 1.00 30.00 30.00 100 30.00
CAJA DE FIERRO GALVANIZADO DE 16" X 8" X 4" UND 1.00 50.00 50.00 100 50.00
CEMENTO BLANCO BLS. 50 KG BOL 10.14 70.50 714.87 100 714.80
CEMENTO PORTLAND TIPO I (42.5KG) BOL 2,724.84 20.50 55,859.22 7 3,909.98 50 27,928.41 30 16,757.04 13 7,261.39
CERA LIQUIDA AMARILLA GLN 7.00 25.00 175.00 100
CINTA PLASTICA DE SEÑAL ELECTRICA M 250.00 0.16 40.00 100 40.00
CINTA TEFLON RLL 0.60 0.97 0.58 100 0.60
CLAVOS CON CABEZA DE 2 1/2", 3", 4" KG 156.17 3.90 609.06 100 605.59
CODO DE 90°C/R PVC SAP P/AGUA DE 3/4" UND 15.96 1.80 28.73 100 28.74
CODO FO.GO 1/2 UND 6.00 0.90 5.40 100 5.40
CODO PVC SAP (AGUA CALIENTE) 3/4"X 90° PZA 21.60 0.90 19.44 100 19.20
CONECTOR DE COBRE TIPO PERNO 5/8" UND 1.00 8.00 8.00 100 8.00
CORDEL M 3.26 0.20 0.65 100 0.00
COSTO TOTAL DE TRATAMIENTO PAISAJISTA GLB 1.00 5,000.00 5,000.00 35 1,750.00 65
DISEÑO DE MEZCLA DE CONCRETO UND 3.00 250.00 750.00 100 750.00
ENCOFRADO METALICO M2 36.63 220.00 8,058.60 100 8,058.60
EQUIPO DE ALUMBRADO 250W DE VAPOR Na JGO 6.00 1,200.00 7,200.00 100 7,200.00
ESCALLA DE MARMOL TRAVERTINO COLOR BEIG M2 493.02 28.00 13,804.56 15 2,070.70 70 9,663.27 15 2,070.70
ESCALLA DE MARMOL TRAVERTINO COLOR GRIS M2 281.27 28.00 7,875.56 20 1,575.12 80 6,300.47
ESCULTURA DE SANTA ROSA DE LIMA A COLOR EN FIBRA DE VIDRIO UND 1.00 6,200.00 6,200.00 100 6,200.00
FAROLA ESFERICA DOBLE 70W INCLUYE ACCESORIOS UND 19.00 450.00 8,550.00 100 8,550.00
FLETE CHICLAYO-JAEN KG 18,299.80 0.32 5,855.94 100 5,855.94
GRANALLA BLANCA KG 1,013.90 0.80 811.12 100 811.12
CRONOGRAMA DE ADQUISICION DE INZUMOS

Mes 1 Mes 2 Mes 3 Mes 4 Mes


Descripción Insumo Unidad Cantidad Precio Parcial
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
HORMIGON M3 10.12 120.00 1,214.40 100 1,214.45
INSTALACION PROVISIONAL DE AGUA GLB 1.00 500.00 500.00 100 500.00
INSTALACION PROVISIONAL DE ENG.ELECT GLB 1.00 500.00 500.00 100 500.00
INTERRUPTOR TERMOMAGNETICO DE 2x15A UND 1.00 36.10 36.10 100 36.10
INTERRUPTOR TERMOMAGNETICO DE 2x20A UND 1.00 36.40 36.40 100 36.40
INTERRUPTOR TERMOMAGNETICO DE 2x30A UND 1.00 35.90 35.90 100 35.90
LADRILLO K.K. 9x12x24 CM UND 186.00 0.40 74.40 100 74.40
LOSETA VENECIANA COLOR CLARO 30x30cm M2 405.27 33.00 13,373.91 100 13,373.86
MADERA TORNILLO P2 3,183.95 4.00 12,735.80 25 3,183.93 45 5,731.07 15 1,910.36 15 1,910.36
MARMOLINA BLANCA KG 1,013.90 0.70 709.73 100 709.73
MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 5,000.00 5,000.00 50 2,500.00 50 2,500.00
PASTORAL DE A°G° TRIPLE UND 6.00 200.00 1,200.00 100 1,200.00
PEGAMENTO PARA PVC AGUA FORDUIT GLN 0.91 90.80 82.63 100 83.39
PIEDRA CHANCADA DE 1/2" M3 199.00 130.00 25,870.00 100 25,870.05
PIEDRA CHANCADA DE 3/4" M3 12.06 130.00 1,567.80 25 391.66 65 1,018.31 10 156.66
PIEDRA LAJA COLOR NEGRO M2 109.86 30.00 3,295.80 50 1,647.93 50 1,647.93
PINTURA ANTICORROSIVA PARA ESTRUCTURA METALICA GLB 1.00 4,000.00 4,000.00 100
PINTURA ESMALTE SINTETICO GLN 0.43 41.50 17.85 100 17.93
PLANCHA DE POLICARBONATO ALVEOLAR TANSLUCIDO 2.90X1.05X8MM PLN 47.00 185.00 8,695.00 100
POSTE 12/200 UND 6.00 890.00 5,340.00 100 5,340.00
REGISTRO DE BRONCE DE 6" PZA 1.00 22.00 22.00 100 22.00
ROTURA DE PROBETAS UND 9.00 25.00 225.00 100 225.00
TABLERO GEN. C/FUSIBLES DE 8 CIRCUITOS UND 1.00 1.50 1.50 100 1.50
TAPA DE CONCRETO DE 0.3 X 0.6 MT. UND 6.00 30.00 180.00 100 180.00
TAPON MACHO DE Fo. GALV. DE 1/2" UND 6.00 6.00 36.00 100 36.00
TEE PVC SAP 3/4" C/R P/AGUA UND 36.00 1.40 50.40 100 50.40
TEE SP PVC SAP P/AGUA DE 3/4" UND 1.98 11.00 21.78 100 21.78
TEKNOPOR DE 1" x 4' x 8' PLN 205.65 15.00 3,084.75 100 3,084.75
THOR GEL KG 10.00 16.40 164.00 100 164.00
TIERRA DE CHACRA O VEGETAL M3 2.50 10.00 25.00 100
TRANSPORTE DE MATERIAL A SANTA ROSA KG 154,147.85 0.16 24,663.66 30 7,399.10 55 13,565.01 5 1,233.18 10 2,466.37
TRIPLAY DE 4 MM PLN 3.50 22.00 77.00 100 77.00
TUB. PVC SAP PRESION C-10 C/R. 3/4" x 5m UND 20.26 12.50 253.25 100 253.70
CRONOGRAMA DE ADQUISICION DE INZUMOS

Mes 1 Mes 2 Mes 3 Mes 4 Mes


Descripción Insumo Unidad Cantidad Precio Parcial
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2" M 6.00 5.10 30.60 100 30.60
TUB. PVC SAP PRESION P/AGUA C-10 R. 3/4" M 1.98 1.02 2.02 100 2.04
TUBERIA PVC SAL6" M 0.25 16.02 4.01 100 4.01
TUBO FIERRO GALVANIZADO 5M 2"X3"X1/16" UND 30.00 108.82 3,264.60 100 3,264.60
TUBO FIERRO GALVANIZADO 5M 11/2"X11/2"X2MM UND 7.00 87.90 615.30 100 615.30
TUBO FIERRO GALVANIZADO 5M 2"X2"X1/16" UND 55.00 114.00 6,270.00 100 6,270.00
TUBO FIERRO GALVANIZADO 5M 2"X4"X2MM UND 12.00 122.72 1,472.64 100 1,472.64
TUBO FIERRO GALVANIZADO 5M 4"X4"X1/16" UND 22.00 144.84 3,186.48 100 3,186.48
TUBO FO.GALV.ST.ISO-I 1 1/2" M 138.56 18.00 2,494.08 100
TUBO FO.GALV.ST.ISO-I 1" M 131.96 15.00 1,979.40 100
TUBO FO.GALV.ST.ISO-I 2" M 13.20 20.00 264.00 100
TUBO PVC SAL 6" M 13.65 16.02 218.67 100 218.66
UNION UNIVERSAL DE Fo. GALV. DE 3/4" UND 12.00 6.00 72.00 100 72.00
VALVULA ESFERICA DE 3/4" UND 6.00 30.00 180.00 100 180.00
VARILLA DE COBRE d=5/8" DE 2.5m UND 1.00 215.00 215.00 100 215.00
WAYPE KG 13.84 4.50 62.28 100
YESO DE 28 Kg BOL 81.44 1.20 97.73 100 97.73
SUB TOTAL 346,899.43 68,067.44 157,499.01 42,040.49 55,960.93

Mes 1 Mes 2 Mes 3 Mes 4 Mes


Descripción Insumo Unidad Cantidad Precio Parcial
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
EQUIPO
BASUREROS UND 6.00 250.00 1,500.00 100
ESCOBAS PZA 6.51 50.00 325.50 100
CARGADOR FRONTAL CAT 930 HM 9.89 160.00 1,582.40 100 1,580.97
COMPACTADOR VIBR. TIPO PLANCHA 7 HP HM 150.06 12.00 1,800.72 100 1,802.07
MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 HM 183.13 15.00 2,746.95 10 275.09 67 1,844.88 23 630.91
PULIDORA DE TERRAZOS HM 67.60 5.00 338.00 26 86.62 74 251.01
TRACTOR DE ORUGAS HM 4.22 180.00 759.60 100 760.17
VIBRADOR DE CONCRETO 4 HP 1.50" HM 69.84 12.00 838.08 10 83.82 70 586.73 20 167.64
VOLQUETE DE 6 M3 HM 59.24 120.00 7,108.80 100 7,108.80
HERRAMIENTAS MANUALES %MO 0.00 0.00 25 664.49 35 930.28 15 398.69 13 343.47 12
SUB TOTAL 10,473.33 5,163.96 1,283.86 594.48
CRONOGRAMA DE ADQUISICION DE INZUMOS (GLOBAL)
OBTA CONSTRUCCION PLAZA DE ARMAS - SANTA ROSA
PRECIOS AL: 25/08/2007
DISTRITO SANTA ROSA
PROVINCIA JAEN
DEPARTAMENTO CAJAMARACA

Mes 1 Mes 2 Mes 3 Mes 4 Mes


TIPO DE INZUMO
% Costo S/. % Costo S/. % Costo S/. % Costo S/. %
MANO DE OBRA 12.54 9,775.03 35.21 27,446.72 17.27 13,457.52 22.55 17,574.51 12.43
MATERIALES 19.62 68,067.44 45.40 157,499.01 12.12 42,040.49 16.13 55,960.93 6.73
EQUIPO 53.27 10,473.33 26.26 5,163.96 6.53 1,283.86 3.02 594.48 10.92
TOTAL 19.87 88,315.80 42.77 190,109.68 12.77 56,781.87 16.68 74,129.92 7.92
Mes 5 Presupuest.
Costo S/.

39.07
174.46 3,489.24
120.01 2,400.26
2,268.81
851.15
121.08
78.22 1,564.40
1,021.29 20,425.74
118.40
2,796.62
942.46
201.80
3,000.00 3,000.00
4,000.00 4,000.00
3,500.00
6,000.00
1,297.52 25,950.44
96.64
179.17
9,691.50 77,945.28
Mes 5 Presupuest.
Costo S/.

16,341.09
31,703.04
1,043.92
947.75
1,000.00
17,268.24
16,799.51
2,400.00 2,400.00
4,250.00
30.00
50.00
714.80
55,856.81
179.16 179.16
40.00
0.60
605.59
28.74
5.40
19.20
8.00
0.00
3,250.00 5,000.00
750.00
8,058.60
7,200.00
13,804.67
7,875.59
6,200.00
8,550.00
5,855.94
811.12
Mes 5 Presupuest.
Costo S/.
1,214.45
500.00
500.00
36.10
36.40
35.90
74.40
13,373.86
12,735.72
709.73
5,000.00
1,200.00
83.39
25,870.05
1,566.63
3,295.85
4,000.00 4,000.00
17.93
8,695.00 8,695.00
5,340.00
22.00
225.00
1.50
180.00
36.00
50.40
21.78
3,084.75
164.00
25.00 25.00
24,663.66
77.00
253.70
Mes 5 Presupuest.
Costo S/.
30.60
2.04
4.01
3,264.60
615.30
6,270.00
1,472.64
3,186.48
2,494.04 2,494.04
1,979.40 1,979.40
263.92 263.92
218.66
72.00
180.00
215.00
65.15 65.15
97.73
23,351.67 346,919.54

Mes 5 Presupuest.
Costo S/.

1,500.00 1,500.00
325.75 325.75
1,580.97
1,802.07
2,750.88
337.63
760.17
838.18
7,108.80
321.01 2,657.94
2,146.76 19,662.39
Mes 5 Presupuest.
Costo S/.
9,691.50 77,945.28
23,351.67 346,919.54
2,146.76 19,662.39
35,189.93 444,527.21