ENERGY
S.NO SECTION
RUNNING
HOURS
OPERATING
KW
ON DATE ENERGY REPORT RUNNING HOURS(ON OPERATING KW(ON
MONTH) MONTH)
CONSUMPTON(ON
MONTH)
CLINKERIZATION UNIT
LIME STONE CRUSHER-321KW 93.39 1349.49 93.39 1349.49
1.00 IMPACT CRUSHER-132 KW 14.45 65.00 939.25 14.45 65.00 939.25
LS CRUSHER AUX.MCC-1-189 KW 28.39 410.24 28.39 410.24
RAW MILL-1961 KW 1369.42 30414.76 1369.42 30414.76
RAW MILL MD-1200 KW 1038.27 23060.00 1038.27 23060.00
RAW MILL AUX MCC-2-272 KW 65.15 1446.90 65.15 1446.90
2.00 22.21 22.21
RAW MILL VENT FAN-110 KW 65.00 1443.65 65.00 1443.65
RAW MILL CA FAN-305 KW 180.00 3997.80 180.00 3997.80
RAW MILL SEPERATOR-90 KW 21.00 466.41 21.00 466.41
COAL MILL 830KW 554.15 4006.50 554.15 4006.50
COAL MILL MAIN DRIVE 400 KW 358.23 2590.00 358.23 2590.00
COAL MILL AUX.MCC-6- 118 KW 45.92 332.00 45.92 332.00
3.00 COAL MILL BOOSTER FAN-132 KW 7.23 65.00 469.95 7.23 469.95
65.00
############# # 0.00 0.00 0.00
CONSUMPTION TOTAL ON
COAL MILL CA FAN-180 KW 85.00 614.55 DG-1 614.55
ON DAY MONTH 85.00
KILN 2112.5 KW 1122.58 24584.58 Energy Consumption(KWH) 0.00 0.00 1122.58 24584.58
MAIN BAG HOUSE MCC-3-19KW 4.92 107.80 Diesel Consumption(litre) 0.00 0.00 4.92 107.80
KILN FEED MCC-4-114 KW 54.64 1196.58 Running Hours 0.00 0.00 54.64 1196.58
1.00 CRUSHER 920.00 14.45 63.67 1349.49 1.47 2.07 920.00 1349.49 14.45 2.07
2.00 RAW MILL 1345.90 22.21 60.60 30414.76 22.60 35.48 1345.90 30414.76 22.21 35.48
3.00 COAL MILL 122.30 7.23 16.92 4006.50 32.76 6.24 122.30 4006.50 7.23 6.24
4.00 CLINKER 786.30 21.90 35.90 24584.58 31.27 31.27 786.30 24584.58 21.90 31.27
5.00 OPC 385.80 9.25 41.71 14524.33 37.65 37.65 385.80 14524.33 9.25 37.65
6.00 PPC 566.40 9.70 58.39 15655.42 27.64 27.64 566.40 15655.42 9.70 27.64
7.00 PACKING PLANT 562.50 9.15 61.48 720.97 1.28 1.28 562.50 720.97 9.15 1.28