Вы находитесь на странице: 1из 3

SUBH SHREE AGNI CEMENTS UDHYOG PVT. LTD.

JEROUNI, SITGANGA-8, ARGHAKHACHI NEPAL


ELECTRICAL & INSTRUMENTATION DEPARTMENT
ENERGY MONITORING SYSTEM ON DATE: 2076-11-01/2020-02-13 ENERGY CONSUMPTION ON MONTH FAGUN,2076
ENERGY CONSUMPTION KWH ENERGY CONSUMPTION ON MONTH FAGUN,2076

ENERGY
S.NO SECTION
RUNNING
HOURS
OPERATING
KW
ON DATE ENERGY REPORT RUNNING HOURS(ON OPERATING KW(ON
MONTH) MONTH)
CONSUMPTON(ON
MONTH)
CLINKERIZATION UNIT
LIME STONE CRUSHER-321KW 93.39 1349.49 93.39 1349.49
1.00 IMPACT CRUSHER-132 KW 14.45 65.00 939.25 14.45 65.00 939.25
LS CRUSHER AUX.MCC-1-189 KW 28.39 410.24 28.39 410.24
RAW MILL-1961 KW 1369.42 30414.76 1369.42 30414.76
RAW MILL MD-1200 KW 1038.27 23060.00 1038.27 23060.00
RAW MILL AUX MCC-2-272 KW 65.15 1446.90 65.15 1446.90
2.00 22.21 22.21
RAW MILL VENT FAN-110 KW 65.00 1443.65 65.00 1443.65
RAW MILL CA FAN-305 KW 180.00 3997.80 180.00 3997.80
RAW MILL SEPERATOR-90 KW 21.00 466.41 21.00 466.41
COAL MILL 830KW 554.15 4006.50 554.15 4006.50
COAL MILL MAIN DRIVE 400 KW 358.23 2590.00 358.23 2590.00
COAL MILL AUX.MCC-6- 118 KW 45.92 332.00 45.92 332.00
3.00 COAL MILL BOOSTER FAN-132 KW 7.23 65.00 469.95 7.23 469.95
65.00
############# # 0.00 0.00 0.00
CONSUMPTION TOTAL ON
COAL MILL CA FAN-180 KW 85.00 614.55 DG-1 614.55
ON DAY MONTH 85.00
KILN 2112.5 KW 1122.58 24584.58 Energy Consumption(KWH) 0.00 0.00 1122.58 24584.58
MAIN BAG HOUSE MCC-3-19KW 4.92 107.80 Diesel Consumption(litre) 0.00 0.00 4.92 107.80
KILN FEED MCC-4-114 KW 54.64 1196.58 Running Hours 0.00 0.00 54.64 1196.58

KILN,FIRING,PH, COOLER&CLINKER MCC-5-


294.43 6448.00 6448.00
652.5 KW
294.43
PRE-HEATER FAN-360 KW 310.00 6789.00 310.00 6789.00
CONSUMPTION
MAIN BAG HOUSE FAN-235 KW 111.59 2443.90 DG-2 TOTAL ON 2443.90
4.00 21.90 ON DAY 21.90
MONTH 111.59
KILN MAIN DRIVE-132 KW 80.00 1752.00 Energy Consumption(KWH) 122.00 122.00 80.00 1752.00
COOLER FAN-2-90 KW 60.00 1314.00 Diesel Consumption(litre) 40.00 40.00 60.00 1314.00
COOLER FAN-4-90 KW 55.00 1204.50 Running Hours 0.80 0.80 55.00 1204.50
COOLER HYDRAULIC 1-45 KW 30.00 657.00 30.00 657.00
KC ROOTS BLOWER-110 KW 61.00 1335.90 61.00 1335.90
PC ROOTS BLOWER-110 KW # # #VALUE! #
KC /PC ROOTS BLOWER-110 KW 61.00 1335.90 61.00 1335.90
COOLER HYDRAULIC 2 -45 KW # # #
UTILITIES 231.5kw 109.70 1890.80 109.70 1890.80
WATER PUMP-1-15 KW 22.00 13.00 286.00 22.00 13.00 286.00
WATER PUMP-2-45KW 0.00 0.00 0.00 #DIV/0! 0.00
COMPRESSORS-GA 37KW-1 22.00 34.00 748.00 22.00 34.00 748.00
COMPRESSORS-GA 37KW-2 0.00 0.00 0.00 0.00 #DIV/0! 0.00
5.00
5.00 COMPRESSORS-GA 18.5KW-3 12.00 13.00 156.00 12.00 13.00 156.00
COMPRESSORS-GA 18.5KW-4 0.00 13.00 0.00 0.00 #DIV/0! 0.00
COOLING WATER PUMP-1 24.00 7.50 180.00 24.00 7.50 180.00
COOLING WATER PUMP-2 0.00 7.50 0.00 0.00 0.00
WATER CIRCULATION PUMP 24.00 3.70 88.80 24.00 88.80
AC/INVERTER-1-7(9KW EACH) 24.00 18.00 432.00 24.00 432.00
GRINDING UNIT
OPC POWER CONSUMPTION 2758KW 1421.76 14524.33 14524.33
1421.76
VRM MAIN DRIVE 1390KW 824.65 7628.00 824.65 7628.00
6.00 MAIN BAG HOUSE FAN-650 KW 552.11 5107.00 9.25 552.11 5107.00
9.25
MATERIAL HANDLING-MCC-1 14.39 133.11 14.39 133.11
VRM CIRCUIT-MCC-2 118.54 1096.50 118.54 1096.50
CLASSIFIER FAN 45.00 416.25 45.00 416.25
VRM AUXILLARY MOTOR 15.51 143.47 15.51 143.47
7.00 PACKING PLANT-185KW 9.15 78.79 720.97 9.15 78.79 720.97

PPC POWER CONSUMPTION 2758KW 1553.45 15655.42 0.00 15655.42


1553.45
VRM MAIN DRIVE 1390KW 829.07 8042.00 0.00 829.07 8042.00
9.70
MAIN BAG HOUSE FAN-650 KW 554.95 5383.00 0.00 554.95 5383.00
9.70
MATERIAL HANDLING-MCC-1 14.50 140.65 0.00 14.50 140.65
8.00
VRM CIRCUIT-MCC-2 119.53 1159.41 119.53 1159.41
FLYASH & HAG-MCC-3 35.40 343.41 35.40 343.41
CLASSIFIER FAN 45.00 436.50 436.50
VRM AUXILLARY MOTOR 15.51 150.45 150.45
VRM UTILITIES-2(POWER DISTRIBUTION
24.00 123.24 2957.78 2957.78
BOARD 24.00 123.24
TOTAL
9.00 LIGHTING & WELDING CPP TOTAL GRID RUNNIG HOUR TOTAL GRID
CPP RUNNING HOUR ON DAY
10.00 ERECTION 417.37 RUNNING HOUR 24.00 ON DAY RUNNING HOUR ON 417.37
11.00 TRX LOSSES & MISCELLANEIOUS 0.80 0.80 23.20 23.20
CONSUPTION UNIT TIME CONSUPTION UNIT
KWH KWH
ON DAY TIME ON MONTH
12.00 GRID POWER 96400.00 96400.00
6 AM TO 6 PM- 45800.00 6 AM TO 6 PM- 45800.00
6 PM TO 10 PM- 15600.00 6 PM TO 10 PM- 15600.00
13.00 CPP POWER 122.00 10 PM TO 6AM- 35000.00 10 PM TO 6AM- 35000.00 122.00
14.00 TOTAL 96522.00 TOTAL(T1+T2+T3) 96400.00 TOTAL(T1+T2+T3) 96400.00 96522.00
DAILY PRODUCTION REPOTION
TOTAL -UNIT
RUNNING TOTAL - CLINKER- TOTAL
PRODUCTION( TOTAL UNIT(Kwh) ON TOTAL -UNIT TOTAL RUNNING /TON Clinker
Sr.No. SECTION TON) ON DAY
HOURS ON MILL TPH
DAY
UNIT UNITS PRODUCTION ON
(Kwh)ON MONTH HOURS ON MONTH (Kwh) ON
DAY /TON(Kwh) /TON MONTH
MONTH

1.00 CRUSHER 920.00 14.45 63.67 1349.49 1.47 2.07 920.00 1349.49 14.45 2.07
2.00 RAW MILL 1345.90 22.21 60.60 30414.76 22.60 35.48 1345.90 30414.76 22.21 35.48
3.00 COAL MILL 122.30 7.23 16.92 4006.50 32.76 6.24 122.30 4006.50 7.23 6.24
4.00 CLINKER 786.30 21.90 35.90 24584.58 31.27 31.27 786.30 24584.58 21.90 31.27
5.00 OPC 385.80 9.25 41.71 14524.33 37.65 37.65 385.80 14524.33 9.25 37.65
6.00 PPC 566.40 9.70 58.39 15655.42 27.64 27.64 566.40 15655.42 9.70 27.64
7.00 PACKING PLANT 562.50 9.15 61.48 720.97 1.28 1.28 562.50 720.97 9.15 1.28

Вам также может понравиться