3000 5100 400 430 2070


B

400 500

400 500

600
850
400

400

750
300

300
1500

1500
550 1800

1650

1650
1200

1200
500 1800 500
C1 C1
2200

2000
300

3250
500

500
500 1800 500 C3
4450

4450
300 2200

A C2 C2 A A A

1200

1200
1650

1650
1500

1500
3000 3000 1000

2000
3000 5500
300

300
250400
400

250400
2270
300 750 20

750
300 20

300
20

300
700

1120

1480
250
430
Existing Wall Existing Wall

2000
300

3540

2280

550
650
550

2280

2830
6930
3540

5620
8600
2280
3000
18200 (Existing)

18200 (Existing)

2100
29440

29440
17600

17600
3540

2280
500 1800 500 2200 550 1800

2280

1500
3540

2280
SECTION A-A

2280
3540

Existing Wall Existing Wall

1120
20 750 20300

20 300

20
750
2270
400250

400250
300

300

2000
3000 3000 1000
1500
1650

1650
1200

1200

C2 C2 300 2200
4450
4450

500 1800 500


500

500

C3
3250

2200 300 2000


500 1800 500
1200

1200

C1 C1
1650

1650

550 1800
1500
300

300

750

ONLY FOR TENDER


400

400

400

500 400
850

600

CONSULTANT: DRAWING TITLE: NAME DESIGNED BY DRAWN BY CHECKED BY APPROVED BY Date: August, 2019
PROJECT:
3000 1000 3000 3000 1000 3000 5100 400 430 2070
B TOP PLAN FOR ABUTMENT AND WINGWALL
B
Madani
PILE CAP &Avenue to PLAN FOR ABUTMENT
PILE LAY-OUT
SIGNATURE DH M. JU S.M. MZ
Vertical Scale
Balu river (Major Road 5) Horizontal Scale
DATE
and Balu river to Shitolakkhya CLIENT: CLIENT ACCEPTANCE: HDD SEAL & SIGNATURE: LEGEND: DIMENSIONAL DETAILS OF ABUTMENT
(Major Road 5A) 24 Engineer Construction Brigade,
NOTES: Drawing No:
Zia Colony, Dhaka Cantonment,
Road project Dhaka-1206 All Dimensions and Elevations are in millimeter unless otherwise mentioned in the drawings. Revision: WB02/S-18/31
5500 (New) 20mm Gap 18200 (Existing) 20mm Gap 5500 (New)

℄. OF DECK
2% Slope 2% Slope 2% Slope 2% Slope
2% Slope 2% Slope
1480

300 CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL of Girder CL 300
of Girder
750 2000 2000 750 20 1120 2280 2280 2280 2280 2280 2280 2280 1120 20 750 2000 2000 750
300 300

New Wall New Wall Existing Wall Existing Wall New Wall New Wall
5620

8600
6120 6120
600 300 1500 2950 20 750 300 300 750 20 2950 1500 300 600
1120

1500 300350 350300 1500


1500

1500
850 3250 2270 17700 2270 3250 850

SECTION B-B

ONLY FOR TENDER

CONSULTANT: DRAWING TITLE: NAME DESIGNED BY DRAWN BY CHECKED BY APPROVED BY Date: August, 2019
PROJECT:
Madani Avenue to SIGNATURE DH M. JU S.M. MZ
Vertical Scale
Balu river (Major Road 5) Horizontal Scale
DATE
and Balu river to Shitolakkhya CLIENT: CLIENT ACCEPTANCE: HDD SEAL & SIGNATURE: LEGEND: SECTIONAL DETAILS OF ABUTMENT
(Major Road 5A) 24 Engineer Construction Brigade,
NOTES: Drawing No:
Zia Colony, Dhaka Cantonment,
Road project Dhaka-1206 All Dimensions and Elevations are in millimeter unless otherwise mentioned in the drawings. Revision: WB02/S-19/31
B

B4-Y16-150 (Top bar)


B5-Y16-150 (Both Faee) B1-Y20-125 (Bottom bar)
B2-Y20-150 (Top bar)

℄. OF DECK
2% Slope 2% Slope 2% Slope 2% Slope
2% Slope 2% Slope
B5-Y16-150(Both Faee)

W7-Y12-150 (E/F) W8-Y12-150 (W/F)


W8-Y12-150 (W/F) W7-Y12-150 (E/F)

B3-Y16-150 (Bottom bar)


A9-Y12-150 A9-Y12-150

1 1
A8-Y16-150 A8-Y16-150
A7-Y16-150 A7-Y16-150

W6-Y12-150 (W/F) W5-Y16-150 (E/F) W5-Y16-150 (E/F) W6-Y16-200 (W/F)

New Wall Existing Wall Existing Wall New Wall

A4-Y16-150 A4-Y16-150
Existing Wall

W4-Y16-150 (W/F) W3-Y16-150 (E/F) A3-Y16-150 A3-Y16-150 W3-Y16-150 (E/F) W4-Y16-150 (W/F)

W2-Y12-150 (W/F) W1-Y16-150 (E/F) W1-Y16-150 (E/F) W2-Y12-150 (W/F)


A2-Y16-150 A2-Y16-150
A1-Y16-150 A1-Y16-150

REINF. DETAILS OF WINGWALL


SECTION B-B

Existing
150
W7-Y12-150 (E/F) A10-Y12-150
W8-Y12-150 (W/F) A9-Y12-150
FW1-Y12-150

W9-Y12-150 (E/F) A11-Y12-150 FW2-Y10-200


W10-Y12-150 (W/F)

1500
A7-Y16-150
ST1-Y10-200
A7-Y16-150
A6-10-Y20

450
A5-Y16-150
(Stirrup)

W11-2-Y16

EF WF
ST2-Y12-150
W5-Y16-150 (E/F)
W6-Y12-150 (W/F)
Existing Wall

REINFORMENT DETAILS
W1-Y16150 (E/F)
W2-Y12-150 (W/F) A4-Y16-150 A1-Y16-150 FLANK WALL AND SEISMIC
B3-Y16-150 (Bottom bar)

A2-Y16-150 A3-Y16-150 STOPPER BLOCK FOR ABUT.


SIZE-(W11 xT150 x H1500)
B4-Y16-150
W3-Y16-150 (E/F)
B2-Y20-150
W4-Y16-150 (W/F)

300 300

B5-Y16-150 B5-Y16-150
(Both Face) (Both Face)

1PI19-6-Y12
B4-Y16-150 (Top bar)

B5-Y16-150 (Both Faee)


1PI20-3-Y12
B3-Y16-150
REINFORMENT DETAILS
B1-Y20-125
ELEVATION SHOWING REINF. DETAILS OF RETURN WALL REINF. SECTION OF ABUTMENT (SECTION 1-1) (450x450) BEARIG PLINTH
B2-Y20-150 (Top bar) ONLY FOR TENDER
B5-Y16-150(Both Faee) B1-Y20-125 (Bottom bar)
REINFORCEMENT PLAN OF PILE CAP FOR ABUTMENT
CONSULTANT: DRAWING TITLE: NAME DESIGNED BY DRAWN BY CHECKED BY APPROVED BY Date: August, 2019
PROJECT: B
Madani Avenue to SIGNATURE DH M. JU S.M. MZ
Vertical Scale
Balu river (Major Road 5) Horizontal Scale
DATE
and Balu river to Shitolakkhya CLIENT: CLIENT ACCEPTANCE: HDD SEAL & SIGNATURE: LEGEND:
REINF. DETAILS OF ABUTMENT
(Major Road 5A) 24 Engineer Construction Brigade,
NOTES: Drawing No:
Zia Colony, Dhaka Cantonment,
Road project Dhaka-1206 All Dimensions and Elevations are in millimeter unless otherwise mentioned in the drawings. Revision: WB02/S-20/31
300 300 400 400

300
410 300

300300

C6-Y12-150
6750

C6-Y12-150
C6-Y12-150

6200

6200
5620
C5-Y12-150

5000

5000

5000
Z Z
C5-Y12-150 Y Y

3500

3500

3500
X X C5-Y12-150
X X Y Y C4-4-Y12 Z Z C4-3-Y12
C4-4-Y12 C3-5-Y25
C3-2-Y25 C2-5-Y25 C3-4-Y25
C2-4-Y25 C1-5-Y25 C2-4-Y25
C1-6-Y25 C1-4-Y25

1500 300 600 1500 300300 2200 550 1800


300
1500

1500

1500

1500

1500

1500
300 300

COUNTERFORT C1 (CONCRETE DETAILS) COUNTERFORT C1 (REINF. DETAILS) COUNTERFORT C2 (CONCRETE DETAILS) COUNTERFORT C2 (REINF. DETAILS) COUNTERFORT C3 (CONCRETE DETAILS) COUNTERFORT C3 (REINF. DETAILS)
BOTH END BOTH END BOTH END BOTH END BOTH END BOTH END

300 300 300 300 550 550

C3-4-Y25
C3-2-Y25 C3-5-Y25 C2-4-Y25
C2-4-Y25 C6-Y12-150 C2-5-Y25 C6-Y12-150 C6-Y12-150
1500~300 1500~300 2200~410 C1-4-Y25
C1-6-Y25 C1-5-Y25
1500~300 1500~300 2200~410
500

500

500

500

500

500
C5-Y12-150 C4-4-Y12 C5-Y12-150 C4-4-Y12 C5-Y12-150 C4-3-Y12

SECTION X-X (C1) SECTION X-X (C1) SECTION Y-Y (C2) SECTION Y-Y (C2) SECTION Z-Z (C3) SECTION Z-Z (C3)

ONLY FOR TENDER

CONSULTANT: DRAWING TITLE: NAME DESIGNED BY DRAWN BY CHECKED BY APPROVED BY Date: August, 2019
PROJECT:
Madani Avenue to SIGNATURE DH M. JU S.M. MZ
Vertical Scale
Balu river (Major Road 5) Horizontal Scale
DATE
and Balu river to Shitolakkhya CLIENT: CLIENT ACCEPTANCE: HDD SEAL & SIGNATURE: LEGEND: DETAILS OF COUNTERFORT, C1, C2 & C3
(Major Road 5A) 24 Engineer Construction Brigade,
NOTES: Drawing No:
Zia Colony, Dhaka Cantonment,
Road project Dhaka-1206 All Dimensions and Elevations are in millimeter unless otherwise mentioned in the drawings. Revision: WB02/S-21/31