N15928 - OPEN CUT DUCT BANK (OCD) SUMMARY

Date: 07.10.2019

ESTIMATED LENGTH IN
S.NO OCD TYPE OF SERVICES METERS STATUS
CIRCUIT-01 CIRCUIT-02
1 OCD-01 11KV& 33KV CABLES CROSSING 25.6 25.7 UNDER DESIGN STUDY

2 OCD-02 MILITARY ENTRANCE ROAD 21.6 21.6 UNDER DESIGN STUDY


UNDER DESIGN STUDY WITH
3 OCD-02A FUTURE ROAD - 71.7
M/S. TRISTAR SERVICES

ALTERNATE ROUTE OPTIONS IS UNDER


FUTURE ROAD
4 OCD-03 149.8 45.7 STUDY WITH M/S. TRISTAR SERVICES &
( AS PER TENDER)
EXITSING SERVICES TO AVOID SHARP BENDS

UNDER DESIGN STUDY WITH


5 OCD-04 FUTURE ROAD 18.5 15.2
M/S. TRISTAR SERVICES
FUTURE ROAD
6 OCD-05 27.4 27.2
( AS PER TENDER)
ALTERNATE ROUTE OPTIONS IS UNDER
FUTURE ROAD
7 OCD-06 20.3 19 STUDY WITH M/S. TRISTAR SERVICES TO
( AS PER TENDER)
AVOID SHARP BENDS
FUTURE ROAD
8 OCD-07 64.6 59.8
( AS PER TENDER)
9 OCD-08 FUTURE ROAD 70.8 64.7
10 OCD-09 FUTURE ROAD 16 13.2 UNDER DESIGN STUDY WITH
11 OCD-10 FUTURE ROAD 12.7 10.3 M/S. TRISTAR SERVICES
12 OCD-11 FUTURE ROAD 96.2 95.5
13 OCD-12 FUTURE ROAD 50.3 44.5 SUBMITTED TO O/E FOR APPROVAL
14 OCD-13 FUTURE ROAD 29.5 24.9 ( DTS NO: 0284 )
FUTURE ROAD + FUTURE LRT
15 OCD-14 74.5 65.5 UNDER DESIGN STUDY
CROSSING
16 OCD-15 FUTURE ROAD 29.5 25
17 OCD-16 FUTURE ROAD 28.7 28.5
18 OCD-17 FUTURE ROAD 17.6 13.1
19 OCD-18 FUTURE ROAD 67.5 61.9
20 OCD-19 FUTURE ROAD 50.7 44.8
21 OCD-20 FUTURE ROAD 17.4 12.9 SUBMITTED TO O/E FOR APPROVAL
22 OCD-21 FUTURE ROAD 17.3 12.7 ( DTS NO: 0284 )
FUTURE ROAD/ FUTURE MRT
23 OCD-22 59.7 53.8
CROSSING
24 OCD-23 FUTURE ROAD 29.9 25.3
25 OCD-24 FUTURE ROAD 17.5 13
26 OCD-25 FUTURE ROAD 17.6 13.1
27 OCD-26 FUTURE ROAD 54.9 139.3 UNDER DESIGN STUDY
SUBMITTED TO O/E FOR APPROVAL
28 OCD-27 FUTURE ROAD 79.3 70.7
( DTS NO: 0284 )
FUTURE ROAD + FUTURE LRT
52 -
29 OCD-28 CROSSING UNDER DESIGN STUDY
FUTURE ROAD - 32.8
SUB TOTAL 1217.4 1151.4
TOTAL ESTIMATED LENGTHS ( METERS) 2368.8

BOQ LENGTHS:
Open Cut Bank - Asphalt Road Crossing - 500 meters
Open Cut Duct Bank - Gatch Road Crossing - 2800 meters
Open Cut Bank - Existing Services - 200 meters

Submitted to O/E for Approval under DTS-284