Вы находитесь на странице: 1из 3

TEL: 0861 765897 FAX: 0861 765896 EMAIL: INFO@LINEA.CO.ZA WEB: WWW.LINEA.CO.

ZA

_______________________________________________________________________________________________
Please make sure that when you start a new project on the server you start by saving the Linea Template as your project.
 Linea Design
 Current
 Alterations and additions
 00.000 Linea Template
 As-Built Drawings and folders
 All PDF’s + DWG files of the drawings are to be saved as follows:
- Street number + Street Name_Drawing Type_Drawing label
-e.g: 21 Victoria Road_As Built_Floor Plan
21 Victoria Road_Land Survey
21 Victoria Road_Council Submission_Elevations
____________________________________________________________________________________________________________________

A/B DRAWINGS TO SHOW:


PLEASE TICK BOXES AS COMPLETED

ROOF PLANS AND FLOOR PLANS:

 All dimensioned

 Ground Floor to be marked as LD FFL 0 000 unless Linea has done the L/S. Then use the correct floor level

 All construction lines to be shown on the drawing until I have had the final check and I am happy. (Only then can they be deleted before printing)

 Area calculations in a box on the right hand side at the top

 Show the position of the roof trap door on the top floor plan

 Arrows showing the direction of the roof slopes

 2 X section lines

 Elevation lines (please label)

 Boundary lines as well as distance to be indicated (If L/S was done)

 Street names

 BIG BOLD ERF #

 Door openings shown as dashed lines

 Reference legend shown (shower, bath, W.C etc.)

 Room name eg: Bathroom, Bedroom

 UC = Underside of ceiling

 All B.I.C’s to be shown

 fittings and finishes

 FFL (each room)

 Carpet / Tiles (each room)

 Show the position of all gulleys, vent pipes, stacks and sanitary fittings (W.C, baths, shower, etc.)

1
 Show ceiling heights, beam heights and bulkhead heights
P

L Show window heights = wh

E Show drawing scale on all planning sheets


A Floor to sill = ws

S Stairs to be numbered and to have a direction arrow

E Size of treads and risers to be noted

 Show site plan with North Point and scale (to be checked on google earth)

 Show area calculations

 All roof types to be hatched accordingly and labeled as well as an indication of the angle

 Dimensions – largest to smallest from outside in

 LD FFL – Linea Datum Finished Floor Level – Ground floor 0 000 work up or down from that

 LD FFL is very important unless we have L/S drawings

 RWP – Rain Water Pipe and gutters t be indicated

 LD FFL + Title Block (on all Plans) as well as foundation note and boundary note (in a red rectangle)

 Folding Instructions (on all plans)

 Drawing Title correctly labeled (on all plans)

 Lazer image sometimes does not print (please double check after printing )

 Please ensure that the Linea logo and details print correctly in colour

 Drawing numbers to correspond with the project number

 Client, Project details and dates, scales and revision numbers to be checked before drawings are handed in

 Use the “=” equal sign and not the “-“ hyphen sign, when referring to heights of doors, beams, windows, sills etc. (The “-“ hyphen sign could be

interpreted as a negative figure instead of a hyphen)

 All levels must add up to the correct total NB!

SECTIONS AND ELEVATIONS:

 Heights dimensioned

 All construction lines to be shown on the drawing until I have had the final check and I am happy. (Only then can they be deleted before printing)

 Section to show roof members and construction (only where applicable)

 Label “Bulkhead” in Sections

 LD FFL is very important unless we have L/S drawings. Indicate the LD FFL Line in red as per the template

 All levels must add up to the correct total NB!

 All levels must be the same as on the floor plans

 Boundary, Section and Elevation lines

 Street names

 ERF number

 All wall and roof types are to be hatch accordingly

 RWP – Rain Water Pipe to be indicated

 Ground level line in thick , bold blue showing the underlying earth

2
 Roof angle and type on all Sections and Elevations

 LD FFL + Title Block (on all Plans)

 Folding Instructions (on all plans)

 Drawing Title correctly labeled (on all plans)

 Lazer image sometimes does not print (please double check after printing )

 Drawing numbers to correspond with the project number

 Client, Project details and dates, scales and revision numbers to be checked before drawings are handed in

 Notes on drawings regarding below soil = footings and surface beds to be on all Sections and Elevations showing footings etc

*NOTE: All illustrations below ground level are based on logical assumption to be confirmed by Structural Engineer

 Note for Sections through roofs that are not accessible

*NOTE: The roof construction is based on logical assumptions as access was not possible at the time of survey

 All NGL and contours are to be determined from the L/S drawings. Our NGL line to follow these contours in Sections and Elevations

 Elevation photographs to correspond with A/B Elevations (Photo’s printed for checking of the drawing)

SIGN:________________________________________________

DATE:________________________________________________

Вам также может понравиться