SHELL
NOM. THK = 8
C MIN. REQ.THK = 7.7 C
2
2
ORIENTATION PLAN GENERAL NOTE:
1 : 18
1) WORK ORDER REFER TO APPROVED FOR CONSTRUCTION STAMP.
2) SERIAL NUMBER REFER TO APPROVED FOR CONSTRUCTION STAMP.
3) ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE NOTED.
4) FLANGE BOLT HOLES SHALL STRADDLE NOMINAL HORIZONTAL
AND VERTICAL CENTER LINE OF VESSEL.
5) ALL UNSPECIFIED WELDS SHALL BE 5mm CONTINUOUS FILLET WELD
UNLESS OTHERWISE NOTED.
6) DIMENSIONAL TOLERANCE SHALL FOLLOW DOCUMENT NO.
YF-TOLERANCE- 01(REV.1).
7) FLANGE SHALL COMPLY WITH ASME B16.5, 2009 (2) ED.
8) WROUGHT STEEL PIPE SHALL COMPLY WITH ASME B36.10M, 2015 ED.
9) FILLET WELD SIZE TOLERANCE : -0/+3.
B B
THE LOWEST POINT.
11) AS PER UG99(b) NOTE 36 MAWP EQUAL TO DESIGN PRESSURE
2
CLIENT :
FOR STOCK
2
D D
2 WELD DETAIL - LS1 WELD DETAIL - CS1 & CS2
TABLE UW-12 TYPE 1 TABLE UW-12 TYPE 1
C C
CERTIFIED BY
YUEN FEE (WAN SOON)
ENGINEERING SDN. BHD.(152417-U)
LOT 17224, JALAN HARUAN 6,OAKLAND INDUSTRIAL PARK,
70300 SEREMBAN, N.S.D.K, MALAYSIA. Website: www.yuenfee.com CLIENT :
FOR STOCK