Академический Документы
Профессиональный Документы
Культура Документы
This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.
Lead Engineer
Engineering Manager:
Client Approval:
Record of Revisions
Revision Date Description
No.
Table of Contents
1.0 GENERAL
1.1 Scope
1.2 Terminology
Approved Equal shall mean a product approved by the Buyer as equal to the product
specified in this specification.
Buyer shall mean the detailed engineering contractor, acting for the Owner.
Manufacturer shall mean the manufacturer of the specified insulation, jacketing and/or
accessories.
Operating Temperature shall mean the maximum temperature of the substrate surface
exposed to weather (indoor and outdoor) during operating conditions. Owner shall mean
the Owner of the Project or its authorized representative.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-M-4043
Project Name Date: 14 Apr 2011
Contract Number Page 5 of 7
Revision 1
Piping shall mean piping, pipe fittings, valves, pipe supports and accessories unless a
particular item and/or size limitation is stated.
Stainless Steel (SS) shall mean austenitic stainless steel such as Type 304, 316, 321 and
347.
Uninsulated Surfaces shall mean carbon steel or stainless steel and other alloy surfaces
which will not be insulated.
Work shall mean all labor, supervision, installed and consumable materials, services,
equipment, instruments, tools, and each and every item of expense necessary for
application of acoustic and thermal insulation materials, repairs, quality control, and
cleanup thereafter.
2.0 REFERENCES
The latest revision, including addenda, of the following references in effect on the latest date of
this Specification form a part of this Specification. Except as modified by the requirements
specified in this Specification or on the drawings, all Work performed shall comply with the
following references. Any conflicts between the following references and this Specification shall
be resolved by the Buyer.
C450 Fabrication of Thermal Insulating Fitting Covers for NPS Piping and Vessel
Lagging
C553 Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial
Applications
C647 Guide for Properties and Tests of Mastics and Coating Finishes for Thermal
Insulation
C795 Thermal Insulation for Use In Contact With Austenitic Stainless Steel
3.0 EXECUTION
The Supplier shall perform all Work related to the design of insulation systems to piping and
equipment as required by this document and Specification MQ-SP-M-4045 Specification for Hot
Insulation.
4.1 Revise the last paragraph of Section 5.3 to read: “NACE SP 0198-2010 describes
control measures for mitigating corrosion under thermal insulation. Common
coatings for mitigating corrosion under thermal insulation are epoxy phenolic and
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-M-4043
Project Name Date: 14 Apr 2011
Contract Number Page 7 of 7
Revision 1
5.0 MATERIALS
The insulation and accessory materials for application to surfaces requiring insulation shall be as
specified in MQ-SP-M-4045 Specification for Hot Insulation.
6.1 Documentation
The Supplier and Contractor are solely responsible for all QA/QC activities regardless
of any QA/QC activities performed by the Buyer. The Supplier and Contractor shall
maintain documentation to comply with the guidelines of ASTM D3276. Inspection shall
also comply with the following additional requirements. Any approvals for products and
procedures submitted by the Supplier and Contractor shall be considered additional to
the requirements stated in the specification and shall not be considered as a substitution to
the requirements of this specification.
All QA/QC documentation for work performed shall be made available to the Buyer on
demand and without notice. If the Supplier and Contractor are unable to produce the
QA/QC documentation to the satisfaction of the Buyer, such absence of documentation
shall be sufficient cause for the Buyer to reject the work performed.
The Buyer’s review (or lack thereof) of quality control documents shall not be construed
as acceptance of omissions or defective work. Nor shall it in any way lessen the
Supplier’s responsibilities to provide a completely operative system or component in full
compliance with this specification.
Verify that all oil, grease, dirt, chlorides and other contaminants have been removed.
Verify that all surfaces requiring coatings under insulation have been coated.
Verify that the storage, handling and application of insulation materials are in accordance with the
Application Data.
7.0 ATTACHMENTS