Вы находитесь на странице: 1из 1

N

LAND KEY :
SITE LOCATION

RBW2

GENERAL NOTES:-
1. LOCATIONS OF AIR TERMINAL DEVICES HAS BEEN FOLLOWED
AS PER THE FALSE CEILING LAYOUT FROM CONSULTANT.
TOP ROOF
2. ACCESS DOOR ARE NOT PROVIDED FOR THE VCDs IN SPD &
LPD SHAFTS DUE TO THE INSUFFICENT SPACE AVAILABILITY.

3. ALL DUCT FOR BASEMENT VENTILATION SYSTEM SHALL BE


1.2mm THICK.

4. ALL FRESH AIR DUCT SHALL BE 1.2mm THICK.

5. ALL CPD,LPD & SPD SHALL BE 1.2mm THICK.

6. ALL MOTORIZED DAMPER SHALL BE PROVIDED WITH LIMIT


SWITCH.
ROOF FLOOR
7. ALL KITCHEN EXHAUST DIFFUSER TO BE PROVIDED WITH
GREASE FILTER.

8. FRESH AIR DUCT TO BE COMPLETELEY GI DUCT


9TH FLOOR (NO FLEXIBLE DUCT).

9. ALL SMOKE AND FIRE DAMPER IN SMOKE DUCT SHALL BE


PROVIDED WITH LIMIT SWITCH AND TO BE CONNECTED TO FOR
CONTROL PANNEL.
8TH FLOOR
10. STIFF VANCE WILL BE PROVIDED FOR ELBOW HAVING 450mm
TO 800mm DUCT SIZE AND 2 VANCE PROVIDED FOR ELBOW
HAVING 800mm ABOVE SIZES.

7TH FLOOR 11. ACCESS DOOR WILL BE PROVIDED IN EVERY 15 Mtr.

12. ALL DUCT ROOF SHALL BE 1.2mm THICK.

SUBMITAL REVIEW STATUS


6th FLOOR
CODE 1 APPROVED

CODE 2 APPROVED

CODE 3 REVISE & RESUBMIT


5th FLOOR
CODE 4 REJECTED

CODE 5 FOR INFO & RECORD ONLY

4th FLOOR
R.E Signature : Date :

3rd FLOOR

REV. NO. DESCRIPTION DATE


2nd FLOOR
MASTER DEVELOPER:

1st FLOOR

OWNER:

GROUND FLOOR
SALEH MOHAMMED SALEH
MEJREN ALAMERI
BASEMENT-1 FLOOR PROJECT MANAGEMENT:

CONSULTANT:

GROUND FLOOR

Founded 1956

MAIN CONTRACTOR:

BASEMENT-1 FLOOR

SUB CONTRACTOR:

LEGEND-VENTILATON LAYOUT
BASEMENT-2 FLOOR

PROJECT:
RBW2-24
RAHA BEACH-COMMERCIAL BUILDING

ZONE:
AL RAHA BEACH
SECTOR NO. PLOT NO.

RBW 2 24
DRAWING TITLE:

VENTILATION
SCHEMATIC DIAGRAM

DRAWING NO.: REVISION NO.:


AF174-ME-VE-013 01
SUBMISSION DATE: SCALE:
06-05-2019 N.T.S
PROJECT ID: SHEET NO:

13

Вам также может понравиться