K = 0.311*(Mr / Mo) + 0.239*(Cr / Co) + 0.231*(Ar / Ao) + 0.081*(Mr / Mo) + 0.076*(Mr / Mo) + 0.062*(Ar / Ao)
Reajuste de July-2019
INDICE COEF. DE Io (mayo - 19)
INCIDENCIA
% INCID. Ir (Aug-19) Ir/Io K
MONOMIO ELEMENTO REPRESENTATIVO SIMBOLO IND.BASE
Nº
(1) (2) (3) (4)=(2)x(3) (5) (6)=(2)x(5) (7)=(6)/(4) (1)x(7)
1 MANO DE OBRA INC. LEYES SOCIALES M 47 0.311 100.00% 600.40 600.40 619.76 619.76 1.032245 0.321028
2 CEMENTO PORTLAND TIPO I C 21 0.239 100.00% 449.56 449.56 449.56 449.56 1.000000 0.239000
3 ACERO DE CONSTRUCCION CORRUGADO A 03 0.231 100.00% 534.40 534.40 541.62 541.62 1.013510 0.234121
4 MAQUINARIA Y EQUIPO NACIONAL M 48 0.081 100.00% 371.16 371.16 374.19 374.19 1.008164 0.081661
5 MADERA NACIONAL PARA ENCOF. Y CARPINT M 43 0.076 100.00% 932.42 932.42 936.28 936.28 1.004140 0.076315
6 AGREGADO GRUESO A 05 0.062 100.00% 426.25 426.25 434.38 434.38 1.019073 0.063183
1.000
COEFICIENTE DE REAJUSTE: K= 1.015308
K-1 0.015308
CALCULO DEL COEFICIENTE DE REAJUSTE POR FORMULA POLINOMICA
LIQUIDACION FINAL DE OBRA
Reajuste de August-2019
INDICE COEF. DE Io (mayo - 19)
INCIDENCIA
% INCID. Ir (Sep-19) Ir/Io K
MONOMIO ELEMENTO REPRESENTATIVO SIMBOLO IND.BASE
Nº
(1) (2) (3) (4)=(2)x(3) (5) (6)=(2)x(5) (7)=(6)/(4) (1)x(7)
1 MANO DE OBRA INC. LEYES SOCIALES M 47 0.311 100.00% 600.40 600.40 619.76 619.76 1.032245 0.321028
2 CEMENTO PORTLAND TIPO I C 21 0.239 100.00% 449.56 449.56 449.56 449.56 1.000000 0.239000
3 ACERO DE CONSTRUCCION CORRUGADO A 03 0.231 100.00% 534.40 534.40 538.41 538.41 1.007504 0.232733
4 MAQUINARIA Y EQUIPO NACIONAL M 48 0.081 100.00% 371.16 371.16 373.24 373.24 1.005604 0.081454
5 MADERA NACIONAL PARA ENCOF. Y CARPINT M 43 0.076 100.00% 932.42 932.42 932.3 932.30 0.999871 0.075990
6 AGREGADO GRUESO A 05 0.062 100.00% 426.25 426.25 434.86 434.86 1.020199 0.063252
1.000
COEFICIENTE DE REAJUSTE: K= 1.013457
K-1 0.013457
Reajuste de September-2019
INDICE COEF. DE Io (mayo - 19)
INCIDENCIA
% INCID. Ir (Oct-19) Ir/Io K
MONOMIO ELEMENTO REPRESENTATIVO SIMBOLO IND.BASE
Nº
(1) (2) (3) (4)=(2)x(3) (5) (6)=(2)x(5) (7)=(6)/(4) (1)x(7)
1 MANO DE OBRA INC. LEYES SOCIALES M 47 0.311 100.00% 600.40 600.40 619.76 619.76 1.032245 0.321028
2 CEMENTO PORTLAND TIPO I C 21 0.239 100.00% 449.56 449.56 449.56 449.56 1.000000 0.239000
3 ACERO DE CONSTRUCCION CORRUGADO A 03 0.231 100.00% 534.40 534.40 538.89 538.89 1.008402 0.232941
4 MAQUINARIA Y EQUIPO NACIONAL M 48 0.081 100.00% 371.16 371.16 373.56 373.56 1.006466 0.081524
5 MADERA NACIONAL PARA ENCOF. Y CARPINT M 43 0.076 100.00% 932.42 932.42 938.95 938.95 1.007003 0.076532
6 AGREGADO GRUESO A 05 0.062 100.00% 426.25 426.25 434.66 434.66 1.019730 0.063223
1.000
COEFICIENTE DE REAJUSTE: K= 1.014248
K-1 0.014248
CALCULO DEL REAJUSTE CONTRACTUAL RECONOCIDO
"MEJORAMIENTO DEL DRENAJE Y CANALIZACIÓN DE AGUAS PLUVIALES EN EL ASENTAMIENTO HUMANO 15 DE AGOSTO Y JR. JOSÉ OLAYA DEL DISTRITO DE
Obra:
CASTILLO GRANDE - PROVINCIA DE LEONCIO PRADO - HUANUCO - I ETAPA”
Contratista: CONSORCIO JOSE OLAYA
Supervisor de Obra: ING. NITO LUNA CAMPOS
Residente de Obra: ING. LUIS ENRIQUE ENCISO FLORES
Proceso: ADJUDICACIÓN SIMPLIFICADA N°05-2019-MDCG-CS
Contrato de Ejecución: CONTRATO DE OBRA N° 001-2019-MDCG
Contrato deSupervisión: CONTRATO DE CONSULTORIA DE OBRA N° 002-2019-MDCG
Presupuesto Contratado: S/. 196,046.93
Fecha Base: Mayo del 2019 AREA GEOGRAFICA: 3
VALORIZACION VALOR. PROGRAM VALOR. EJECUTADA REAJ. PROGRAMADO REAJ. EJECUTADO REAJ. RECONOCIDO
K-1
FORMULA N° MES MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
1 Jul-19 49,745.74 49,745.74 58,222.03 58,222.03 0.01531 761.51 761.51 891.26 891.26 891.26 891.26
PLUVIAL - I
"DRENAJE
2
(UNICO)
ETAPA"
Aug-19 88,865.72 138,611.46 82,858.05 141,080.08 0.01346 1,195.87 1,957.38 1,115.02 2,006.28 1,115.02 2,006.28
001
3 Sep-19 27,530.01 166,141.47 24,700.67 165,780.75 0.01425 392.25 2,349.63 351.94 2,358.22 351.94 2,358.22
REAJUSTE RECONOCIDO= 2,358.22
N°
VALORIZACION
DE MES VENCIMIENTO FECHA DE NETA (V.N.) F.A TIL DIA DE PAGO F.A TIL DE ULTIMO DIA DE IGV 18% MONTO A PAGAR
CALCULO DE INTERESES SITUACIÓN
VAL. DE PAGO PAGO REAL REAL VENCIMIENTO DE PAGO (VN) POR LA ENTIDAD
1.1.0 AUTORIZADO
1.1.2 Intereses
Por Intereses S/. 0.00
TOTAL S/. 0.00
1.2.3 Intereses
Por Intereses S/. 0.00
TOTAL S/. 0.00
1.3.1 Retención Garantía de Fiel Cumplimiento (INCL. IGV 18%) S/. 19,604.69
1.3.2 Devueltos S/. 0.00
2.1.0 CONCEDIDOS
2.1.1 Directo S/S/.
148,381.35
0.00
2.1.2Materiales S/S/.
200,000.00
0.00
2.2.0 AMORTIZADOS
2.2.1 Directo S/. 0.00
2.2.2 Materiales S/. 0.00
VIII.- INTERESES
9.1 INTERESES S/. 0.00
9.2 INTERESES (INCL. IGV 18%) S/. 0.00
COSTO DE
III ELABORACION DE S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
LIQUIDACION
MULTA POR
IV ATRASO DE OBRA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
Y OTROS
REAJUSTES DE
V S/. 0.00 S/. 0.00 S/. 2,782.70 S/. 2,358.22
PRECIOS
CIERRE DE
VI S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
METRADO
VII REDONDEOS S/. 0.00 S/. 0.00 S/. 0.01 S/. 0.01
TOTAL 198,404.00
RESUMEN DE LIQUIDACION FINAL DE CONTRATO DE OBRA
(OBRA PRINCIPAL)
B. REAJUSTE DE PRECIOS
Reintegros Ppto. Principal 2,358.22 0.00 2,358.22
C. ADELANTOS OTORGADOS
Adelantos Directos 0.00 0.00 0.00
D. DEDUCION DE REINTEGROS
Adelantos Directos 0.00 0.00 0.00
E. OTROS
Mayores de Gastos Generales 0.00 0.00 0.00
Contrato RESUMEN
deSupervisión:
GENERAL DE OBRA CONTRATO DE CONSULTORIA DE OBRA N° 002-2019-MDCG
01.00 CONTRACTUAL
02.00 REINTEGRO
Reajuste del Contrato Principal S/. 2,358.22 S/. 424.48 S/. 2,782.70
Mayores Gast. Gen. del Contrato Principal S/. 0.00 S/. 0.00 S/. 0.00
Mayores Gast. Gen. del Reajuste del Adicional - Deductivo S/. 0.00 S/. 0.00 S/. 0.00
Mayores Gast. Gen. del Reajuste del Adicional Nª 02 S/. 0.00 S/. 0.00 S/. 0.00
Costos Adicionales del Contrato Principal S/. 0.00 S/. 0.00 S/. 0.00
Costos Adicionales del Reajuste del Adicional de Obra S/. 0.00 S/. 0.00 S/. 0.00
►OBRA
"MEJORAMIENTO DEL DRENAJE Y CANALIZACIÓN DE AGUAS PLUVIALES EN EL ASENTAMIENTO HUMANO 15 DE AGOSTO Y JR. JOSÉ OLAYA DEL DISTRITO DE
CASTILLO GRANDE - PROVINCIA DE LEONCIO PRADO - HUANUCO - I ETAPA”
►CONTRATISTA CONSORCIO JOSE OLAYA
►SUPERVISIÓN ING. NITO LUNA CAMPOS
►RESIDENTE ING. LUIS ENRIQUE ENCISO FLORES
►SISTEMA DE CONTRATACIÓN PRECIOS UNITARIOS
FECHA DESCRIPCION
DEDUCCION
DEDUCCION
N° DE
DEL MONTO
AMORTIZACION AMORTIZACION
DE MES VALORIZACION REAJUSTES DE VALORIZACION
REINTEGRO POR POR VALORIZACION IGV 18% MONTO A PAGAR
INICIO FIN CONTRACTUAL (FP1+FP2+F REAJUSTE BRUTA (V.B) SIN SITUACIÓN
VAL. SIN IGV P3)
QUE NO
QUE NO IGV
ADELANTO ADELANTO DE NETA (V.N.) (VN) POR LA ENTIDAD
CORRESP. DIRECTO MATERIALES
CORRESP.
POR AD
POR AM
1 Jul-19 12/30/1899 12/30/1899 58,222.03 0.00 0.00 0.00 58,222.03 0.00 0.00 58,222.03 10,479.97 68,702.00 PAGADO
2 Aug-19 8/1/2019 8/31/2019 82,858.05 0.00 0.00 0.00 82,858.05 0.00 0.00 82,858.05 14,914.45 97,772.50 PAGADO
3 Sep-19 9/1/2019 9/14/2019 24,700.67 0.00 0.00 0.00 24,700.67 0.00 0.00 24,700.67 4,446.12 29,146.79 PAGADO
"MEJORAMIENTO DEL DRENAJE Y CANALIZACIÓN DE AGUAS PLUVIALES EN EL ASENTAMIENTO HUMANO 15 DE AGOSTO Y JR. JOSÉ OLAYA DEL
Obra:
DISTRITO DE CASTILLO GRANDE - PROVINCIA DE LEONCIO PRADO - HUANUCO - I ETAPA”
Contratista: CONSORCIO JOSE OLAYA
Presupuesto Adicional de Obra con IGV 18% S/. 0.00 Presupuesto de Cierre Metrado (Metrado de Liquidacion) co S/. 0.00
Presupuesto Adicional de Obra sin IGV S/. 0.00 Presupuesto de Cierre Metrado (Metrado de Liquidacion) sin S/. 0.00
Presupuesto de Deductivo de Obra con IGV 18% S/. 0.00 Multa Por Atraso de Obra con IGV 18% S/. 0.00
Presupuesto de Deductivo de Obra sin IGV S/. 0.00 Multa Por Atraso de Obra sin IGV S/. 0.00