Вы находитесь на странице: 1из 1

Notes:-

1. All dimensions to be checked on site, written


W8
dimensions to be followed in preference to scaled

D0
W8 dimensions.
LADIES

D2
(Terrazzo FF)

Bath
D0
North Elevation

D0
PWD
D0 D0 11 x 55 = 600
UP
2. All walls less than 200mm thick to be reinforced with
D0
hoop iron at every 2 course.

W8
DUCT store

W8
3. All reinforced concrete work is to be in accordance
PWD

Bath
URINAL W8 W8 W8 W8
D0

D2
D0
MH
D0
11 x 55 =
600
with structural engineer's details.
UP

D0
GEN TS
W8 (Terrazzo FF)

W8 4. All sanitary work to be in accordance with MINISTRY


MH
OF HEALTH (M.O.H) rules and regulations.
East Elevation

S-07
5. Where drain passes under building or driveway area,
pipe to be of cast iron .

17,438 6. All waste pipes and soil pipes are to be in ducts and
7,738 2,600 7,100
the bends to have all cleaning eyes accessible from

1,500
outside.

1,500 810 D1
7. All windows and external glazed doors on ground

700
1,326

1730
200

200
floor to have burglar proofing to Architect's detail.

(60 iclination)
AUDITORIUM +

3,000
8. All door frames to be rebated & moulded & be full

3,000

W1
W1
1200mm (Terrazo

ramp
floor finish)
width of wall with moulded architrave to detail,

1,428
2530
9. Stair case and lobby doors to be self closing and 1/2
hour fire resistant.

3,000

3,000
W1

W1
East Elevation

East Elevation

14450
10. All internal plaster to be two coats steel float
AUDITORIUM + finished.

1,317
2600
600mm (Terrazo floor
finish)
11. All manholes within building area, driveway and
parking to have heavy duty air tight covers and double

3,000
200 17,100 200 844 2,440

3,000

W1
W1
sealed.

27,100

27,100
26,800
75 0 750
12. Provide GALVANISED IRON (G.I.) 125 x 100 rainwater

3,179
3640
down pipes and

200
125 x 100 (G.I.) box gutter with brackets etc. where

19 x 56 = 1,000
shown.
AUDITORIUM +/-

2,600

2,600
0.000m

D1

D1

5190
S-08 S-08 13. All painting to be 3 coats.

150
200 17,100 200

500
14. Splash apron of 600mm along the perimeter of

3910

150

3900
building.

200
75 0
750

15. Samples of fittings, materials etc. to be produced &


PULPIT AREA
approved before commencing work.

3,000

5600
(Ceramic floor tiles)

W1

3,000
W1
CHOIR AREA

SOUND ROOM
16. All windows to BE built in reinforced concrete
Pelmet boxes & timber internal window cills & Skirtings.

2760

2460

950 100
17. TIMBER trusses/portal frames & purlins to be

200
200 4000 1,000 7600 1320 3500 200
East Elevation
painted with 2 coats of oil paint.
#toPZvalue
East Elevation
17,500

#toPZvalue

18. Fire fighting equipment to be provided and installed

S-07
by Building Fire Consultants where shown on plan.
#toPZvalue

17,500

1
19.These architectural drawings shall be read in
conjunction with the Structural drawings,Electrical-

R
Mechanical drawings Bills of Quantities & Technical

TE
Specifications. Any discrepancy shall be reported

EN
immediately to the Architect.

EC
3
20. The Architect shall not accept any liability for

AR
works which he has not been expressly instructed to

6
4
Supervise in writing and has accepted to proceed in

,51

YC
writing, or for any ommissions or deviations from his

17

DA
drawings/technical specifications. Nor shall he take

5
responsibility for works handled by other nominated
Consultants or Contractors
#toPZvalue

8
,68

6
31
16,919

0
,40
#toPZvalue

31
Elevation
East

CK
O
BL
D
SE
No. Revision/Issue Date

PO
0

O
,40

PR
14
#toPZvalue

Owner
#toPZvalue

#toPZvalue

18,200 15,800
SPIRIT LIFE CHURCH
KIGUNGA, MUKONO

ARCHITECT
Arch. Nakkungu Esther Grace
Reg. No.: 171, P.C No.: 2529

+256 772 510525/+256 753 117800


nest23000@gmail.com

Project Name and Address

PROPOSED
CHURCH DEVELOPMENT
TO BE BUILT AT KIGUNGA,
SEETA MUKONO

Drawing Title Sheet

Scale Date Architectural Asst;; Design by

1:100 AMERI HERBERT AMERI HERBERT


2020

Вам также может понравиться