Академический Документы
Профессиональный Документы
Культура Документы
MT
CURRICULUM VITAE
Summary of Qualifications
Experiences:
10 years as an Engineer : Control System PT. Mulia glass Float Division
2 year as Technical Specialist PT. Transavia Otomasi Pratama
3 year as a Manager : DCS (Power Plant) PT. Sungai Budi
3 year as a Manager CED PT.Sinarmas
Certificates:
7
Presenter of Suggestion System (SS), Indonesian Quality Convention, Yogyakarta 2004.
Presenter of Quality Control Circle (QCC), Indonesian Quality Convention, Yogyakarta 2004.
Presenter of Suggestion System (SS), Indonesian Quality Convention, Palembang 2005.
Presenter of Quality Control Circle (QCC), Indonesian Quality Convention, Palembang 2005.
SEA SURVIVAL COURSE, Jakarta 30 th January, 2008.
Automation for Remote System (RESY) Training Course, 17/18 April 2008. Phoenix contact, Singapore
Project History
Troubleshooting SLC5/04 & PanelView600T (Allen-Bradley) in Packing Area in PT. SARIHUSADA 2 Yogyakarta,
2006
Preventive Maintenance SLC 502 & Control Logic 5000 (Allen-Bradley) in Goss Area in PT. Gramedia Jakarta,
2006
Preventive Maintenance PLC5/20,30B (Allen-Bradley), Quantum PLC, SCADA Citect MC08 Area in PT. IKPP
Riau, 2006
Assessment Control Logic 5000, SLC5/03, 04 (Allen-Bradley) in plans Area in PT. Multistrada Arahsarana,
Bekasi, 2006
Finished project “Control System Field Services Contract” at CGS1, 2, 3, 4 & 5 in PT. Chevron Pacific
Indonesia Duri - Riau. Oct 01, 2006 until March, 2007.
Setting module 1770-KF2 communication with PLC5/40E in Yokogawa Jakarta.
Commissioning test module 1770-MBP & 1770-MNET PLC5/40B in PT. IKPP Riau.
Upgrade slc5/01 and DTAM in PT. Samator at Cikarang, May 2007
Check Loop and commissioning test Control Logix5555 in MCS (SEA GOOD 101 Santos Project) Batam, June
July 2007.
Troubleshooting in PT Gramedia Palmerah Jakarta, Agustus 2007.
Maintenance Versa View1500W in PT Fakokuina Surya Cipta-Karawang, September 2007.
Upgrade Panel View1400 to 1500plus in WT09 PT. IKPP Perawang – Riau, September 2007.
Troubleshooting net work slc504 in PMB IKPP Serang, October,2007
Troubleshooting SLC503 in PT Bina Karya Prima Bekasi, October 2007
Troubleshooting SLC504 in PT Dian Rakyat2 Pulogadung October 2007
Maintenance Map I/O PLC5 to DCS Foxboro in Concentrating Area PT Freeport Indonesia Tembaga Pura Irian
Jaya. Nov 12 until Des 14, 2007.
Troubleshooting SLC500&PLC5 in PT Pindo Deli Karawang, December 2007.
Commissioning SLC504&Panel View1500Plus in PT Jawa Manis Banten, October 2007
Troubleshooting RSView32 SCADA and PMS PLC Control Logix5000 in Premier Oil Anoa NATUNA, January
2008.
Troubleshooting SLC501 in Boiler Medco Energy Kalimantan Timur, January 2008.
Troubleshooting Micrologic1500 in mixer PT Bina Karya Prima Bekasi, January 2008.
Troubleshooting SLC504&PanelView1250Plus in PT Holcim Indonesia Bogor, February 2008
Troubleshooting SLC502 in PT Sinar Meadow International Indonesia Pulogadung – Jakarta, February, 2008
Upgarde SLC500 in PT Sinar Mradow Internasional Indonesia Pulogadung – Jakarta, February 2008
8
Troubleshooting SLC501 in PT Daikin Pulogadung, February 22,2008.
Replacement CPU MicroLogic1500 in mixer PT Bina Karya Prima Bekasi, February, 2008
Networking of Versa View1500W and Install UPS (2866266 Phoenix Contact) in MMC/MMS BP Indonesia, West
Java Ltd. February 23 until 29, 2008.
FAT SLC504 and Panel Viewplus 1250 in PT SHGI Jakarta Barat, May 2008
Project WTP in PT Freeport Irian Jaya, Juli 2008.
Finished project Upgrade PLC Rosemont to PLC5/40E (Allen-Bradley) at Furnace F1 as PLC Engineer.
Upgrade SLC5/01 to 5/04 (Allen-Bradley) in Utility Area Float 1.
Upgrade PLC Modicon to 5/04 (Allen-Bradley) in Utility Area Float 1.
Upgrade DTAM to Panel View 550 (Allen-Bradley) in Furnace Area Float 3.
Make Mini SCADA Center (Wonderware) in Utility Area Float 1.
Make Automatic Transfer Fuel Oil in Oil pump Area Float 1&2.
Make Automatic Emergency Engine in Utility Area Float 1&2.
Make Automatic Battery Charger in Pound House Area Float 1.
Make Fire Alarm in Substation Area Float 1.
Make Automatic Starting Compressor in Utility Area Float 1&2.
Make Automatic Battery Charger in Genset Area Float 1.
Make Automatic Transfer SO2 in Tin bath Area Float 2.
Make Automatic Battery Charger in Cooling Tower Area Float 1.
Make Automatic Battery Charger in Annunciation Area Float 1.
Make Automatic Battery Charger in Pound House Area Float 1.
Make Safety Top Roll in Tin bath Area Float 1, 2&3.
Make Automatic Battery Charger in Pound House Float 1.
Make Automatic Counter in Cutting Line Area 1.
Finished project Fuel conversion from Heavy Fuel Oil into Natural Gas at Furnace F1&F3 as Project Engineer.
9
Customer List
1. O o Pharmacheu cal - Tetrapack – 2014.
Project: Programming PLC dan HMI Siemens
Scope of supply:
- Programming PLC
- Programming HMI
3. CIP, Skim, Milk, Sugar Panel Yakult Ngoro jawa Timur – 2013.
Project: CIP Panel, Prepara on Panels
Scope of supply:
- Panel installa on 6 Panel
- Design HMI use GT Designer Mitsubishi
- Design PLC Programming use GX Developer Mitsubishi
- Comissioning
10
- Panel instala on 1 Panel
- Design HMI use WinCC Flexible Siemen
- Design PLC Programming use Sima c manager Siemen
- Commissioning
11
12. Loreal India Pune 20T -Tetrapak –2012.
Project: Programming support to Loreal India Pune 20T – Tetrapak
Scope of supply:
- Design HMI use Panel View Plus
- Design PLC Programming use RSLogic5000
- Design programming SCADA use FactoryTalkView
- Design PLC Programming use RSLogic5000
- Design programming SCADA use FactoryTalkView
12
- Project: PT. Mulia Glass Division, Upgarde SLC500 Allen Bradly.
- Project: PT. LINDE INDONESIA, ControlLogix and SCADA Wonderware
- Project: PT. Blue scope, cu ng flat project
- Project; PT. Freeport “DEEP MILL LEVEL ZONE LOWER PUMPING SYSTEM
GRASBERG BLOCK CAVE MAIN PUMP STATION”
- Project; PT. Chevron Pacific Indonesia, Preven ve Maintenance
13