Вы находитесь на странице: 1из 4

TRAIL PIT LOG

KAWARE & JAWADE PROJECTS PVT.LTD

PROJECT: NEW BG RAILWAY LINE BETWEEN GADAG TO WADI


TYPE OF STRUCT: RUB( A1) BRIDGE NO: 343
CHAINAGE NO: 254615 mts SPAN: 1 5.50 x5.00
TRAIL PIT ID: TP.NO - 343 DATE: 13-07-2014

CROSS SECTION OF PIT DEPTH SOIL DESCRIPTION

GROUND LEVEL SPT"N" VALUE 0.00 m

1.00 m Medium to Fine Grained


Silty Sand(SM)

20 1.50 m

2.00 m

Soft Designtegrated Rock(SDR)

56 3.00 m
Pit Bottom
NOTES KEY PLAN OF PIT

Proposed Track A1

A2

Drawing not to scale


KAWARE & JAWADE PROJECTS PVT.LTD Trail Pits

PROJECT: NEW BG RAILWAY LINE BETWEEN GADAG TO WADI


TYPE OF STRUCT: RUB( A1) BRIDGE NO: 343
CHAINAGE NO: 254615 m SPAN: 1 5.50 x5.00
TRAIL PIT ID: TP.NO 343 DATE: 13-07-2014

SBC CALCULATION BASED ON SPT 'N' VALUE


Depth,m SPT N Value
1.50 20
3.00 56
Bulk Density : 1.89 g/cc Size of Foundation
Water content : 0.133 Width,m 1.00
Depth of testing : 1.50 m Length,m 1.00
γd : 1.883 g/cc
SPT "N" value : 20 wq 0.5 wγ 0.5
2
σ' (γB D) : 28.28 kN/m δ1 30 δ2 30
Cn : 0.77log(2000/σ')
: 1.424
N' : Cn*N
: 28.48
Corrected N value : 15+1/2(N'-15)
: 22
Ultimate Capacity,q ult : 0.314*N2*B*wq+0.943(N2+100)Df*wγ
2
: 479.2 kN/m
2
: 47.9 t/m
qsafe : qult/3 : 15.97 t/m2
Allowable Soil Pressure : 53(N-3)((B+0.3)/2B) 2*w*δ1/δ2
2
: 209.8 kN/m
20.98 t/m2
2
Safe Bearing Capacity at 1.50 m : 15.97 t/m

Depth of testing : 3.00 m


γd : 1.93 g/cc
SPT "N" value : 56
σ' (γB D) : 57.9 kN/m2
Cn : 0.77log(2000/σ')
: 1.185
N' : Cn*N
: 66.33
Corrected N value : 15+1/2(N'-15)
: 41
Ultimate Capacity,q ult : 0.314*N2*B*wq+0.943(N2+100)Df*wγ
: 2740 kN/m2
2
: 274.0 t/m
qsafe : qult/3 : 91.35 t/m2
Allowable Soil Pressure : 53(N-3)((B+0.3)/2B) 2*w*δ1/δ2
: 422 kN/m2
2
: 42.17 t/m

Safe Bearing Capacity at 3.00 m : 42.17 t/m2


TRAIL PIT LOG
KAWARE & JAWADE PROJECTS PVT.LTD

PROJECT: NEW BG RAILWAY LINE BETWEEN GADAG TO WADI


TYPE OF STRUCT: RUB( A2) BRIDGE NO: 343
CHAINAGE NO: 254615 mts SPAN: 1 5.50 x5.00
TRAIL PIT ID: TP.NO - 343 DATE: 13-07-2014

CROSS SECTION OF PIT DEPTH SOIL DESCRIPTION

GROUND LEVEL SPT"N" VALUE 0.00 m

1.00 m

Medium to Fine Grained


Silty Sand(SM)

23 1.50 m

2.00 m Soft Designtegrated Rock(SDR)

53 3.00 m
Pit Bottom
NOTES KEY PLAN OF PIT

Proposed Track A1

A2

Drawing not to scale


KAWARE & JAWADE PROJECTS PVT.LTD Trail Pits

PROJECT: NEW BG RAILWAY LINE BETWEEN GADAG TO WADI


TYPE OF STRUCT: RUB( A2) BRIDGE NO: 343
CHAINAGE NO: 254615 m SPAN: 1 5.50 x5.00
TRAIL PIT ID: TP.NO 343 DATE: 13-07-2014

SBC CALCULATION BASED ON SPT 'N' VALUE


Depth,m SPT N Value
1.50 23
3.00 53
Bulk Density : 1.744 g/cc Size of Foundation
Water content : 0.133 Width,m 1.00
Depth of testing : 1.50 m Length,m 1.00
γd : 1.742 g/cc
SPT "N" value : 23 wq 0.5 wγ 0.5
2
σ' (γB D) : 26.16 kN/m δ1 30 δ2 30
Cn : 0.77log(2000/σ')
: 1.45
N' : Cn*N
: 33.35
Corrected N value : 15+1/2(N'-15)
: 24
Ultimate Capacity,q ult : 0.314*N2*B*wq+0.943(N2+100)Df*wγ
2
: 575.9 kN/m
2
: 57.6 t/m
qsafe : qult/3 : 19.20 t/m2
Allowable Soil Pressure : 53(N-3)((B+0.3)/2B) 2*w*δ1/δ2
2
: 237.1 kN/m
23.71 t/m2
2
Safe Bearing Capacity at 1.50 m : 19.20 t/m

Depth of testing : 3.00 m


γd : 1.93 g/cc
SPT "N" value : 53
σ' (γB D) : 57.9 kN/m2
Cn : 0.77log(2000/σ')
: 1.185
N' : Cn*N
: 62.78
Corrected N value : 15+1/2(N'-15)
: 39
Ultimate Capacity,q ult : 0.314*N2*B*wq+0.943(N2+100)Df*wγ
: 2518 kN/m2
2
: 251.8 t/m
qsafe : qult/3 : 83.94 t/m2
Allowable Soil Pressure : 53(N-3)((B+0.3)/2B) 2*w*δ1/δ2
: 402 kN/m2
2
: 40.18 t/m

Safe Bearing Capacity at 3.00 m : 40.18 t/m2