The Protection System Analysis Group (PASG-10) meeting was held on 12th November at
Kadra, Kodasalli Power Houses. Shri N.P.Gajakosh , Superintending Engineer (E),In charge
Kadra/Kodasalli Power House welcomed the members and participants . The List of
Participants is enclosed herewith as Annexure I. KPCL personnel briefed the Group
regarding the Grid disturbances that occurred during the 26th September 2014,5th and 14th
October 2014.
The Protection System Analysis Group (PASG-10) meeting was held on 13th November at
Kaiga (NPCIL) Nuclear Power Plant. Shri M.P.Hansara , Site Director, Kaiga Power House
and Shri M.Srinivas , Chief Superintendent, Kaiga Power House welcomed the PSAG
members and participants. NPCIL, Kaiga personnel briefed the members about the Kaiga,
Nuclear Power plant and its performance highlights (through power point presentation).
Kaiga, NPCIL also briefed the members about the Grid Disturbances that occurred in Kadra-
Kodasalli Power houses during the months of September –October 2014.The List of
Participants is enclosed herewith as Annexure II.
The details as submitted by KPCL to PSAG query regarding the 26th September 2014, 5 th and
14th October 2014 Grid Disturbances is enclosed herewith as Annexure III & IV
(respectively for Kadra & Kodasalli Stations) . The detail as submitted by Kaiga, NPCIL is
enclosed herewith as Annexure V.
1
I. Discussion and deliberations of the Group:
a. Tripping at 26-09-2014 at 15:50 hrs
1. It was informed by KPCL representative that that B-phase to earth fault had occurred
in 220kV Kadra-Kodasalli line. Main-2 distance relay (PZ1000) had sensed the fault
in zone-2, but backup e/f relay operated at Kodsalli end. The fault in B-phase was
initially a high resistance fault as the voltage dip was very less and fault current was
around 1.2kA. The fault current was observed to be gradually increasing. This was
verified with the relay event log. The issue of trip command from Mian-1 relay could
not be confirmed from the relay event log. Main-1 relay (Quadramho) is faulty at
Kodasalli end.
2. At Kadra end it was told that the Main-2 relay (PZ1000) had sensed the fault in zone-
1. However it was observed from the relay event log that the gradually increasing
fault current was persisting for around 380 ms. Time at which distance relay picked
up and issued trip could not be verified as D.R was not available.
3. 220kV Kaiga-Kadra line and 220kV Kaiga-Kodasalli line tripped from Kaiga end at
328ms and 400 ms respectively.
4. The 220kV Nagjheri-Kodasalli lines were kept in open condition from Nagjheri end.
5. The running unit at Kodasalli tripped due to tripping of evacuating lines. Hence bus
dead condition occurred at Kodasalli and Kadra.
6. The Prefault and Post fault conditions were depicted as below.
2
b. Tripping at 05-10-2014 at 17:22 hrs
1. B-phase to earth fault had occurred in 220kV Kadra-Kodasalli line. This was a
gradually developing high resistance fault. Zone-2 had picked up at Kadra and
Kodasalli but did not trip. 220kV Kaiga-Kadra and 220kV Kaiga-Kodasalli lines
tripped from Kaiga end on distance protection zone-2 in 300ms and 400ms
respectively.
2. The 220kV Nagjheri-Kodasalli lines were kept in open condition from Nagjheri end.
3. The running unit at Kodasalli tripped due to tripping of evacuating lines. Hence bus
dead condition occurred at Kodasalli and Kadra.
4. The Prefault and Post fault conditions were depicted as below.
3
c.Tripping at 14-10-2014 at 15:18 hrs
1. As informed by KPCL representative that distance protection zone-2, B-phase had
operated at Kodasalli end. Fault was cleared from Kadra end. The time of zone-2
pickup and trip could not be verified due to the absence of D.R. Back up earth fault
operated at Kadra end.
2. Two units were in operation at Kodasalli.
3. 220kV Kaiga-Kodasalli tripped from Kaiga end on operation of distance protection
Zone-3, B-phase at Kaiga. Fault was observed to be persistent for 560 milli seconds.
4. The running Unit at 220kV Kodasalli power house tripped as 220kV lines connected
from Kodasalli to Kadra and Kaiga tripped and 220kV Nagjheri line-1&2 were kept
out of service. This resulted in de-energization of 220kV bus at Kodasalli power
house. Generation loss was 74 MW.
5. The Prefault and Post fault conditions were depicted as below.
4
II. Recommendations of PSAG-10 & Follow up for Kadra and
Kodasalli Generating Stations (KPCL).
S.NO Recommendation To be Implement
implemented by ation
Schedule
1 The PSAG-10 members recommended to replace the KPCL in Latest by
Main I (Q21 static Quadramho relay -SHPM 101) coordination December,
distance protection relays with Numerical relays with KPTCL 2014.
having DR and EL features.
2 The PSAG group also advised KPCL to test the KPCL in Latest by
Main II Relay (PZ1000 numerical relay) at the coordination December,
earliest . with KPTCL 2014.
3 The PSAG group recommended to have a uniform KPCL in Completed
Zone II time settings as agreed in the Tripartite coordination on
meeting of KPCL, KPTCL and Kaiga (NPCIL) held with KPTCL 12.11.2014
during 11th& 12th of December, 2013) in the Kaiga – .
Kali Complex.
KPCL informed that they had revised their Zone
II time settings from 350 ms to 300 ms in all the
lines connected to Kadra, Kodasalli and Kaiga
Power House.
4 The Resistive reach of distance protection relay of KPCL in Latest by
Kadra – Kodasalli (both ends), Kadra – Karwar I, coordination 21.11.2014
Kadra – Karwar II (Kadra end), Kodasalli – with KPTCL
Nagjheri I, Kodasalli – Nagjheri II (both ends) lines
to be increased so as to operate on high resistance
faults within the permissible limits .
Since the present settings are prone to under reach
and initiating unwanted tripping at the other
locations, PSAG has recommended to suitably
increase the resistive reach of all the lines. PSAG
advised KPCL to revise the settings at the earliest.
5 PSAG recommended to make the carrier aided KPCL in Latest by
protection functional for 220kV Kadra-Kodasalli, coordination December,
220kV Kadra-Kaiga and 220kV Kodasalli-Kaiga with KPTCL 2014
lines.
In addition, since most of the faults are seen as high
resistance fault, PSAG suggested to revise the
existing PUR to POR scheme for all the lines at Kali
complex.
6 The PSAG group noted that most of the faults were By KPTCL Regularly
in the ‘B’ Phase (of RYB) to ground faults. The / As and
group observed that it may be due to thick when
vegetation below Kadra – Kodasalli, Kadra – Kaiga, needed.
Kodasalli - Kaiga line.
Hence the PSAG group members advised to have
regular thorough line patrolling and clearing the
corridor (i.e. Right Of Way).
5
7 PSAG had recommended to have a uniform setting KPCL in Latest by
for the backup earth fault protection (67N) provided coordination 21.11.2014
through distance relay (i.e PZ1000) and separate with KPTCL
back up earth fault relay (CDD21 of English
Electric, electro mechanical) immediately.
8 The PSAG group advised to disable the phase over KPCL in Latest by
current protection in distance relays (i.e PZ1000 of coordination 21.11.2014
CSPC make) immediately. with KPTCL
9 KPCL informed that installation of GPS for time KPCL As
synchronization of all relays and other protection reported
devices is under process. KPCL is requested to earlier.
expedite the same.
10 It is suggested to check timings (opening and KPCL Periodically
closing) on Kadra line CB test at Kodasalli station
periodically and the record of checking to be
maintained in the substation.
11 It was observed that Kodasalli – Nagjheri I & II lines KPTCL / SLDC Latest by
were kept open at Nagjheri end on 26.09.2014, 21.11.2014
5.10.2014 & 14.10.2014 during bus dead conditions
at Kodasalli station. KPTCL (SLDC) is requested to
clarify /review the issue.
12 The DR and EL data of the line/unit tripping shall be KPCL/KPTCL/ As per the
made available for analysis at station level / SLDC NPCIL IEGC (i.e.
/SRLDC/SRPC level. within 24
Hours)
X---------------------------X----------------------------X--------------------------X---------------------X
6
ANNEXURE - I (1/2)
ANNEXURE - I (2/2)
ANNEXURE - II (1/2)
ANNEXURE - II (2/2)
ANNEXURE V (1/7)
ANNEXURE V (2/7)
GEC ALSTHOM
MADRAS
ANNEXURE V (3/7)
1
ANNEXURE V (5/7)
Nuclear Power Corporation of India Limited
Kaiga Generating Station
Electrical Maintenance Unit -1&2
Relay Testing Laboratory
SETTING SHEET FOR 220KV SWYD. RALAYS As on 08/05/2014
NOTE: OUTPUT RELAY NO.2 WILL BE REMAIN IN DROPOUT CONDITION WHEN I.C.T POWER ≥6.4Mwe with
LED.5 GLOWING CONDITION. RL-2 INVERSED TO P/U WHEN THE I.C.T POWER BELOW <6.4Mwe LOAD OR
OTHER I.C.T TRIP CONDITION.
2
ANNEXURE V (6/7)
Nuclear Power Corporation of India Limited
Kaiga Generating Station
Electrical Maintenance Unit -1&2
Relay Testing Laboratory
SETTING SHEET FOR 220KV SWYD. RALAYS As on 08/05/2014
5) 67L1/ 67L2 (MICOM-P127) Relays are provided for forward dir. Phase O/C & E/F protection to
trip L-1, 2 through 86B, 86Bx and through 67XA aux. relay SWYD.C/R WAN provided & addition to
this, provided a Equation-A logic circuit (B/C with under current <150A) alarm in Swyd. C/R WAN for
Lines-1&2 relays.
3
ANNEXURE V (7/7)
Nuclear Power Corporation of India Limited
Kaiga Generating Station
Electrical Maintenance Unit -1&2
Relay Testing Laboratory
SETTING SHEET FOR 220KV SWYD. RALAYS As on 08/05/2014
6) MICOM-P127 Relay (67L1S / 67L2S) Reverse dir. Phase O/C Stage-2 & 3 protection (TOWARDS
SWYD.) and Equation-“A” logic circuit (Broken Conductor and stage-1 Ph. O/C >150A) to trip Line-1
or 2 through 86B, 86BX and through 67Bx relay line trip Swyd. C/R WAN. appears.
Hanumantharayappa.K.R
Ravikumar.S Jagadeesha
Date: 08/05/2014
Date: 08/05/2014 Date: 08/05/2014
4
ANNEXURE VI (1/18)
ANNEXURE VI (2/18)
ANNEXURE VI (3/18)
ANNEXURE VI (4/18)
ANNEXURE VI (15/18)
Main - 1 Distance Protection (SHPM101) is not in service Procurement action is intiated shall be
due to power supply module problem for Karwar - 1 & 2 Completed On or before - 30.12.2014
3 220KV Kadra (Gen) feeders.
Double Earthing of all supporting structures/elements is to Space problem was observed. However, it
be ensured. will be solved.
Neutrals of Generating Transformers and LA's are to be Space problem was observed. However, it
exclusively earthed. will be solved.
220KV Kodsalli S/S Carrier protection is not in service for all feeders (the real Carrier Protection Real Time testing done.
4
(Gen) time testing is pending)
220KV Nagjhari The LBB relay time & current are set at 1.5 sec & 0.2A for Already done & LBB timing set at 0.4sec
5
power house all feeders and generating transformers
220V DC earth fault persisting negative dead ground Will be rectified
Old Electro-magnetic Relays to be replaced. Procurement action is intiated.
6 220KV RTPS
LBB relay RAICA RXKL1 setting for ICT-II is kept at 50mA Will be re-setted at the earliest
The LBB relay timing is Observed to be 0.7 sec which is Complied, all the lines & units LBB timing is
High. Can be reduced to 250 to 300 milli sec in co- set to 0.4 sec
ordination with pole discrepency relay of breaker.
Carrier protection Is provided for all the
Feeders with same Make & Type relay as Main -1 & Main - feeders. SS-1 & SS-2 lines wave trap were
2 should be changed with differrent Make/Type relays for not available during auit. The same has been
Main -1 & Main -2. normalized by KPTCL.
220KV sharavathy SS
7 Feeders having O/C and E/F relays as Main -2 to be NIT issued & will be Complied on or before -
(Gen)
replaced with distance relays for good protection co- 30.12.2014.
ordination on 220 KV Grid.
Carrier protection should be kept in service for the feeders Will be Tested & Put into Service.
having no Carrier protection.
NIT issued for replacement of DC earth fault
DC earth leakage should be arrested on top priority to relay by SE(E)S office. Replacement of MOM
avoid spurious trippings due to DC earth leakage. boxes at ODY will be completed within may
2014.
8 220KV Varahi 220 KV line feeders. Different type of Numerical distance Preparation of tender specification &
(VUGPH Hosangadi) relays should be replaced in place of electromechanical Obtaining administrative approval is under
(gen) relays progress.
Time synchronisation of the distance relays with GPS may Will be carried out
please be reviewed.
1
ANNEXURE VI (16/18)
High setting for the Bus bar differential protection i.e., Will be re-setted at the earliest
325V
A/R Selection switch is kept in non auto mode for all 400KV Will be resolved at the earliest
lines
Dead 220VDC earth fault for both sets i.e., Positive to earth Attended and there is no DC Earth Fault at
9 400KV BTPS
235V Present.
GPS time synchronisation for all the relays & DR not Will be carried out (OEM has already visited
carried. Twice).
Pole discrepancy relay setting kept 0.1 sec for all lines. Will be re-setted at the earliest
220VDC earth fault persisting with leakage current of Will be rectified at the earliest
15mA
PD settings for Munirabad, BTPS & Mehaboobnagar kept at Already resolved
0.1sec.
RTPS-Munirabad line Zone-II setting (26.880 Ohm) is more Already resolved
than Zone-III (26.44Ohm)
10 400KV RTPS No fault locator working for Munirabad & Mehaboobnagar Already resolved
lines.
Disturbance Recorder communication is not working for Will be complied
Munirabad and Mehboobnagar lines.
DG Set is not extended to 400 KV Sub-Station. Will be complied
Old Electro-magnetic relays can be replaced with
Numerical relays. Will be complied
2
ANNEXURE VI (17/18)
220KV Nagjhari Power House 220KV Nagjhari-Ambevadi 1 & 2 lines does not have Procurement action is under progress
CVT's on the line. Carrier tripping was not available for
these lines.
Remaining six 220KV lines have only one R-phase CVT & Procurement action is under progress
Y&B Ph CVT's are not available.
Synchronising of 220KV lines feeders is not being done Synchronization of line feeders is not being
with synchronoscope, only generator transformer units done with synchronoscope, as the same is
are being synchronised. not required. It is true that, only generator
transformer units are being synchronized at
5
NPH.
The Neutrals of generator transformers are not earthed It is true that, neutrals of transformers and
exclusively and all LA's also not found to be earthed LA's at NPH are not exclusively earthed.
exclusively. Further, at this stage, it is not possible to
provide separate earthing as it is already
embeded.
The mulsifier system nozzles are not directed towards Noted and the mulsifire nozzle are directed
Power transformer body in the middle. towards power transformer body in the
middle.
1
ANNEXURE VI (18/18)
6 220KV Sharavathy SS (Gen) 3 Core CT's to be replaced with 5 core CT's to keep the Procurement action is under progress
Bus bar protection in full shape with both Main & Check
Zone.
3 CVT's to be provided on all 220KV feeders so as to keep Procurement action is under progress
the Main-II protections on Bus PT or CVT which increases
the reliability of the protection system.
Bus bar protection panels to be replaced with new Pre-commissioning tests are already
panels of numerical relay type to have the bus bar completed. LC already awailed &
protection in full shape with all features (Check Zone, CT commissioning of new Bus bar protection
fail, iso fail etc. features) as the existing scheme is not panel is under progress.
having check zone facility. Certain CT's with 3 cores
should also be changed to have 5 cores for bus bar
protection.
Feeders having same core for Main-I & Main-II should be Procurement of 245kV 5 core CT's is under
separated to individual core, i.e., Main-I & II should be progress. The matter will be resolved after
on different CT cores. Erection & commissioning of 245kV CT's
having 5 cores.
The battery bank-II to be replaced with VRLA Already solved by replacing with VRLA type
(maintenance free) type batteries to increase the 1000Ah batteries on 06.01.2013 & 500Ah
relaibility of DC system, as the existing both banks are of batteries on 24.06.2013
lead acid type are under complete deterioration
condition.
All generator transformers OTI & WTI shall be brought to The 4-20 mA temperature signals of GT
control room for better monitoring of the transformer 1,3,5 & 8 have been provided to control
performance. room recorder for monitoring.
Procurement of new guages with
temperatures for GT 2, 6 & 7 is in progress.
GT 9 & 10 are being replaced & the
monitoring facility will be extended after
replacement.
New SF6 type circuit breakers may be replaced without Already NIT No. LOT/CEED/SGS/245kV
door type CT's on either side of the breaker in place of Hybrid Bkr./4310 dtd:20.02.2014 issued
existing BOCB as sectionaliser breakers are very vital through e-portal & will be retrofitted at the
while clearing the very high level bus faults. earliest