Вы находитесь на странице: 1из 5

PROCESS CALCULATION FOR LFO DAY TANK

CIVIL
CONTRACTOR DOCUMENT REVIEW R
E MECH
V
LOG DATE : I
ELEC
IN COMM. NO : E I&C
W
A APPROVED PROCESS
B APPROVED AS NOTED CONTRACTOR
D
C NOT APPROVED I RECORD
S
I INFORMATION T PLN PUSMANKON
R PLN UIP NUSRA
APPROVAL DOES NOT RELIEVE CONTRACTOR I
FROM RESPONSIBILITY FOR ERRORS OR B
DEVIATIONS FROM CONTRACT REQUIREMENTS U
T
BY : DATE: I
O
LOG DATE : N
OUT COMM. No. :

0A FA 20 SEP 2017 For Approval WHY RIM GS


REV STATUS DATE PEVISION AND RECORD OF ISSUE PREPARED CHECKED REVIEW APPROVED

PT. PLN (PERSERO)


LOMBOK GECC POWER PLANT (PEAKER) 130 – 150 MW
CONTRACT NO : 1503.PJ/DAN.02.01/DIR/2016

PT. PLN (PERSERO) PUSENLIS


PLN DWG NO.

CONTRACTOR

CONSULTANT

LOMBOK GECC POWER PLANT PROJECT TYPE DOC


REV
(PEAKER) 130 – 150 MW 17-12318 CALCULATION 0A
DOC NUMBER
CODE

GLPP-000200-EGB-P1-CS-006 AREA
JOB NO : 17-12318

PROCESS CALCULATION FOR DOC. NO. : GLPP-000200-EGB-P1-CS-006


LFO DAY TANK
REV : 0A

PAGE : 2 of 5

REVISION HISTORICAL SHEET

Rev. No. Date Description


0A 20-September-2017 For Approval

DISTRIBUTION LIST

PP PLN

Project Manager Project Manager


Project Control Manager Engineering Manager
Procurement Manager
Construction Manager
QC-SHE Manager
Admin & Finance Manager
Engineering Manager
Project Engineer
Mechanical Lead Engineer
Piping Lead Engineer
Process Lead Engineer
Civil Lead Engineer
Electrical Lead Engineer
Instrument Lead Engineer
JOB NO : 17-12318

PROCESS CALCULATION FOR DOC. NO. : GLPP-000200-EGB-P1-CS-006


LFO DAY TANK
REV : 0A

PAGE : 3 of 5

COMMENT HISTORICAL SHEET

Rev. No. Date Description


PROCESS CALCULATION FOR LFO DAY TANK

CLIENT : PT. PLN


PROJECT : LOMBOK GECC POWER PLANT (PEAKER) 130 - 150 MW
LOCATION : LOMBOK, INDONESIA
DOC. NO. : GLPP-00200-EGB-P1-CS-006

Drawing No. Job No. Equipment No. Service


- 17-12318 - LFO
GENERAL
This spread sheet represents tank process calculation for determining the tank dimension and operating level.

BASIC DESIGN
The basic design and general information for calculation are as follow:
- Storage Tank Cap. : 1 day (BID Doc)
3
- LFO consumption : 2 m /engine/hr (Wartsila Data)
- Number of Gas Engine : 13 engine

REFFERENCE
- API Standard 650, "Welded Tank for Oil Storage".
- Bid Document Lombok GECC/GTCC Power Plant (Peaker) 130 - 150 MW

CALCULATION
1. LFO Consumption
3
LFO Consumption : 2 m /engine/hr
3
LFO Consumption : 26 m /h

Peaker duration : 5 hr (assume 17.00 - 22.00)


3
LFO Consumption : 130 m /day
3
LFO Tank required cap : 130 m

2. LFO Tank Dimension


The LFO tank dimension is as follow:
Tank required capacity : 130 m3
Selected ID : 6 m Based on API Standard 650
Selectd Height : 5.4 m
Capacity : 153 m3
Floor Area : 28 m2

3. Operating Level
The operating level of LFO day tank is as folow:
Section Elevation, mm Volume, m3
Bottom to LALL 350 9.9
LALL to LAL 400 1.4
LAL to LAHH 5000 130.1 Net Working Capacity between LAL and LAH
LAH to LAHH 5050 1.4 OK
LAHH to Top angle 5400 9.9

3
Level Setting Elevation, mm Volume, m
LALL 350 9.9
LAL 400 1.4
LAH 5000 130.1
LAHH 5050 1.4
The LFO day tank working volume is sufficient to meet the requirement of LFO daily capacity.
PROCESS CALCULATION FOR LFO DAY TANK

CLIENT : PT. PLN


PROJECT : LOMBOK GECC POWER PLANT (PEAKER) 130 - 150 MW
LOCATION : LOMBOK, INDONESIA
DOC. NO. : GLPP-00200-EGB-P1-CS-006

Drawing No. Job No. Equipment No. Service


- 17-12318 - LFO