Академический Документы
Профессиональный Документы
Культура Документы
ENABLING INSTALLATIONS
STEVTENSIONER®
Enabling installations
THE BENEFITS
• Reduces required load by up to 60%
STEVTENSIONER®VA • Makes the need for bollard pull or winch capacity in
1250 at 900T
excess of the installation load obsolete
• Allows moorings to be installed with a smaller
number of vessels, or lower capacity anchor
handlers or crane barges
• For all types of anchor points and
mooring systems
• Subsea tensioning equipment is compact in size,
suitable for even mobilizing by air freight
• Cross-tensioning opposed anchors reduces the
number of tensioning operations required, taking
typically 6 hours from connecting to de-rigging
• An all-in rental package includes engineering,
hardware and supervision of operations
• A typical CALM buoy 6 mooring point system only
requires 3 tensioning operations
Chain locks
S-2
S-3
Tension on anchor
250 Lifting force
Tension force in t
125
0 30 60 90 120
Time in minutes
S-4
STEVTENSIONING
MODES
1 6 Mooring anchor 2
Mooring anchors
2
11
3
Reaction anchor
Mooring anchor
STEVTENSIONER® Triplate
STEVTENSIONER® STEVTENSIONER®
4
5 5
Mooring anchors 6
Mooring anchors
Mooring anchor
4
STEVTENSIONER® Maximum Suitable* for chain Suitable* for chain Size Weight
model horizontal load size with Kenter size without Kenter STEVTENSIONER® STEVTENSIONER®
[t] shackle [mm] shackle [mm] lxhxw [m] [t]
* The suitability only refers to the section of chain passing through the STEVTENSIONER®. Chain or wire not passing through
the STEVTENSIONER® may have any dimension.
RANGE OF PRODUCTS
Please contact Vryhof for more
information on the full anchor range
and its application.
vryhof.com
04-2017
The information contained in this data
sheet is for guidance purposes only and
may be subject to changes.
© Vryhof. All rights reserved.