Вы находитесь на странице: 1из 6

STEVTENSIONER®

ENABLING INSTALLATIONS
STEVTENSIONER®
Enabling installations

The proof loading of a permanent mooring system


for CALM buoys and FPSOs is critical for a system’s
certification. The proof loads are typically 80-100% of the
design load so that substantial crane/winch capacity or
bollard pull is required. The use of the STEVTENSIONER®
for subsea tensioning offers significant cost benefits as
it reduces the required load by typically 60%. As a result
mooring installations can be performed from anchor
handlers or modest crane barges.

Double pull power Cross tensioning savings


The STEVTENSIONER® is basically a chain shortening clutch By cross tensioning of two opposite anchor legs in the
with the mooring chain connected on one side and a reaction mooring spread, an even larger time efficiency is created.
chain running through it. A vertical pull can induce more than It reduces the number of tensioning operations required
double that pull in the horizontal leg. Repeatedly heaving up by 50% and may save as much as 35 to 40% on the total
and slacking the STEVTENSIONER® in a yo-yo action builds installation cost originally required for the operation.
up the load in the mooring chain until the required tension is
achieved. Typically 5-7 cycles are sufficient. An all-in package
The tensioning services are available on a rental
Reduce cost on installation time and cost basis. Dedicated engineering can be performed and
The STEVTENSIONER® has been successfully used for over depending on the complexity of the project may include
25 years for the installation of mooring systems of Floating a feasibility or suitability assessment and the preparation
Production Units and Offshore Loading Buoys. It suits all of suitable procedures. The rental package includes the
types of anchors, be it drag, suction or driven pile and it also STEVTENSIONER® and the load measurement pin and data
serves to install a complete pre-laid mooring before the unit transmission via acoustic and umbilical cable to a read out
arrives on location. STEVTENSIONER®’s handle loads up unit. The package would typically also include the supervisor
to 1,250 tons and accommodate chain size of 76-152 mm during the tensioning operation.
for the work chain. Given sufficient heave height there is no
limitation on mooring line length and can thus also be used
for tensioning of systems that include wire rope.

THE BENEFITS
• Reduces required load by up to 60%
STEVTENSIONER®VA • Makes the need for bollard pull or winch capacity in
1250 at 900T
excess of the installation load obsolete
• Allows moorings to be installed with a smaller
number of vessels, or lower capacity anchor
handlers or crane barges
• For all types of anchor points and
mooring systems
• Subsea tensioning equipment is compact in size,
suitable for even mobilizing by air freight
• Cross-tensioning opposed anchors reduces the
number of tensioning operations required, taking
typically 6 hours from connecting to de-rigging
• An all-in rental package includes engineering,
hardware and supervision of operations
• A typical CALM buoy 6 mooring point system only
requires 3 tensioning operations
Chain locks

S-2

Passive chain Active chain

S-3

Tension on anchor
250 Lifting force
Tension force in t

125

0 30 60 90 120
Time in minutes
S-4

How it works Computer calculations


The STEVTENSIONER® is based on the principle that a Computer software can calculate the tension in the chain.
vertical load applied to a horizontal string causes high Parameters such as submerged chain weight, length of
horizontal loads. To achieve the required horizontal mooring line as well as height of the STEVTENSIONER®
pretension load at the anchor points, the vertical pulling above seabed and the vertical pull load are incorporated in
force only needs to be 40% of this pretension. The anchor the calculation. By using this method the tension in the chain
line tension is measured by a measuring pin inside the can be calculated at any height of the STEVTENSIONER®
STEVTENSIONER® (fig. S-1) that is connected to a read above seabed, independently of the waterdepth. Fig S-4
out unit on the installation vessel by an umbilical or shows the 5 movements in which tension is build up during
acoustic system for deep water. One anchor line (passive tensioning of chains on piles.
line) is attached to the tension measuring pin, while the
opposite anchor line (active line) passes through the 2
STEVTENSIONER®. 7
5
When the STEVTENSIONER® is lifted it locks the chain and
lifts the full arrangement off the seabed (fig. S-2), building load 1
4
at the anchor points or causing drag anchors to penetrate
8
the seabed. The STEVTENSIONER® is then lowered over the 3
gained chain length, so that the same action can be repeated.
6
Tensioning is applied by repeating the yo-yo movement
(fig. S-3). The pretension is maintained for a certain time for
S-1
certification (DNV 15 minutes, Lloyd’s 20, ABS 30). The active chain (2) passes through the
STEVTENSIONER® (1) on deck of the
installation vessel. The passive chain
(3) is connected to the measuring
pin shackle (8). The dislock wire (5) is
connected on shackle 4. The umbilical
cable (7) is connected between the
measuring pin (6) and the read-out
system on deck.
TECHNICAL
FEATURES

• Available for loads of up to 1,250 tons


• Accommodates work chain range 76-152 mm
• No limit to mooring chain size
• Operates on mooring chain without impairing chain performance,
life expectancy or damaging links
• On average needs only 5-7 tension movements
per mooring chain
• Integral load pin in tensioner records tension in
the anchor line, recorded in real time on deck
• Designed to smoothly guide at least 5 links and
therefore prevent chain getting stuck inside
• The integrated shape allows for smooth passage
over stern roller
• Load measuring pin is equipped with two independent sets of
strain gauges. These connections may
be used for acoustic transfer of the signals

STEVTENSIONING
MODES
1 6 Mooring anchor 2
Mooring anchors
2
11
3
Reaction anchor
Mooring anchor

STEVTENSIONER® Triplate
STEVTENSIONER® STEVTENSIONER®

4
5 5
Mooring anchors 6
Mooring anchors
Mooring anchor
4

Cross tensioning Tensioning against a 3-way tensioning


In the cross tensinonig mode, two reaction anchor When the mooring spread is composed
opposing anchors in the mooring spread In this mode, a reaction anchor is placed of mooring lines that are equally spaced,
are simultaneously tensioned. to tension an anchor in the opposite identical in length and require identical
mooring line or a mooring line cluster as tensioning loads, this mode serves to
shown in the illustration. Change over reduce spread installation time, such as
the STEVTENSIONER® between the for an SPM buoy, to a minimum.
various mooring lines will significantly
reduce the required tensioning time.
STEVTENSIONER®

STEVTENSIONER® Maximum Suitable* for chain Suitable* for chain Size Weight
model horizontal load size with Kenter size without Kenter STEVTENSIONER® STEVTENSIONER®
[t] shackle [mm] shackle [mm] lxhxw [m] [t]

VA84   600 76 - 84 76 - 89 2.2 x 1.3 x 0.6 5.8


VA600   450 64 - 84 64 - 87 2.2 x 0.9 x 0.6 3.8
VA1000 1000 90 - 117 90 - 135 3.1 x 1.2 x 0.8 7
VA1250 1250 114 - 132 114 - 152 5.3 x 1.8 x 1.0 17

* The suitability only refers to the section of chain passing through the STEVTENSIONER®. Chain or wire not passing through
the STEVTENSIONER® may have any dimension.

RANGE OF PRODUCTS
Please contact Vryhof for more
information on the full anchor range
and its application.

STEVIN® STEVSHARK®REX STEVPRIS®Mk6 STEVMANTA® STEVDART®


STEVTENSIONER®
ENABLING
INSTALLATIONS

Vryhof is a trusted partner to many of the offshore


industry’s leading companies, delivering innovative
and customer-focused anchoring and mooring
solutions. We are committed to the highest standards
of safety and integrity and are proud of our legacy and
impeccable track record, delivering value in everything
we do. Our 50-year history of setting standards and
leading the way in the offshore sector makes us unique
in terms of our expertise and breadth of services.

In recent years, Vryhof and its installation partners


have taken full scope permanent mooring projects
for offshore oil & gas and renewables applications
by offering innovative and cost effective solutions
including design, procurement, installation, life
extension and decommissioning.

Vryhof consists of: Deep Sea Mooring,


MoorLink and Vryhof Anchors.

vryhof.com
04-2017
The information contained in this data
sheet is for guidance purposes only and
may be subject to changes.
© Vryhof. All rights reserved.

Вам также может понравиться