BOKARO‐ANGUL SECTION II OF JAGDISHPUR‐HALDIA‐BOKARO‐DHAMRA 
 PIPELINE PROJECT (JHBDPL) PH‐II 
 
 

02  17.02.2020  ISSUED FOR APPROVAL  SP  PANKAJ PANCHAL 


01  14.02.2020  ISSUED FOR APPROVAL  SP  PANKAJ PANCHAL 
00  21.08.2019  ISSUED FOR APPROVAL  SP  KP  KP 
Rev.  Date  Description of Revision  Sign Prepared   Sign Checked Sign Approved
Client: 

 
 
 
GAIL (INDIA) LIMITED 
JAGDISHPUR‐HALDIA‐BOKARO‐DHAMRA 
PIPELINE PROJECT – (Bokaro ‐ Angul Pipeline) 
FOA:GAIL/NOIDA/C&P/PROJ/JHBDPL/LAYING/BOKARO‐ANGUL/17‐48/02 Date:12.04.2018 
Consultant :  
 
 
 
MECON LIMITED 
( A Govt. of India Undertaking) 
Delhi, India 
Contractor: 
 

 
 
CORRTECH INTERNATIONAL PRIVATE LIMITED 
Ahmedabad, India. 
Manufacturers’s Document No. CIPL/GAIL/JHBDPL BAPL‐ SEC‐ II/TCP/PRO/M15/02  Date 

Item  Document Index 
Project No.  Serial No.  Rev. No.  17.02.2020 
No. 

GAIL‐JHBDPL BAPL‐SEC II 
 
  T C
 
P P  R 
 
O  M 1
 
5  R  2 
 
 

Document title : 

INSTALLATION PROCEDURE OF COATING INTEGRITY TEST  
PAGE NO. 
 
1 / 7 
 
COMMENTS RESOLUTION SHEET
(Document No. CIPL/GAIL/JHBDPL BAPL‐ SEC‐ II/TCP/PRO/M15/02)
 
 
PROJECT TITLE : BOKARO‐ANGUL SECTION II OF JAGDISHPUR‐HALDIA‐BOKARO‐DHAMRA
PIPELINE PROJECT (JHBDPL) PH‐II
CLIENT : GAIL (INDIA) LIMITED
CONSULTANT : MECON LIMITED
CONTRACTOR : CORRTECH INTERNATIONAL PVT. LTD.
 

Sr. No.  Comments/ Observations by MECON /GAIL  Conform / Compliance by CORRTECH 


Attached a 6A switch in the (‐) line circuit of the P/L 
1  to measure the off potential on both side  Noted and comment is incorporated 
Of HDD section. 
As per Mecon specification average specific 
2  Noted and comment is incorporated 
resistance shall be min 108 Ohm‐m2. 
 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-HALDIA-


BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

 
1 INTRODUCTION 

The coating is premire external corrosion protection method for pipelines . As such the selection 
and  continued  intergrity  of  pipeline  coating  is  paramount  importance.It  is  the  coating  that 
determine  the  cathodic  proection  requirements  and  the  magnitude  of  pipeline    maintance 
expenditures to prevent failures such as metal loss and stress corrosion cracking .The fundamental 
contributions that the coating makes to stopping external corrosion are:  
 
1. Isolating the anode and cathode areas of the corrosion cells from each other. 
2. Isolating the common electrolyte –the moist soil – from both the anode and cathode areas. 
 
2 PURPOSE 

To describe the procedure for conducting coating integrity survey for evaluating electrical strength 
of pipeline coating and provide adequate quality assurance / control of workmanship at site. 
 
3 SCOPE 

This  procedure  covers  the  methodology  of  conducting  coating  integrity  survey  Pipeline  segment 
(Like – HDD) 
 
4 RESPOSIBILITY 

It  is  the  responsibility  of  the  site  engineer  to  ensure  that  the  readings  are  correctly  taken.  The 
responsibility shall also cover the proper supervision to take readings work as required. 
 
5 MATERIAL AND EQUIPMENTS 

Equipment  : Calibrated portable multi meter, Standard Copper‐ Copper Sulphate   
Reference Cell, Battery, Flexible cable, Sacrificial Anode, Earthing Rods / Pipe Pieces and Tool kit 
with all accessories etc.  
 
6 PROCEDURE FOR COATING INTEGRITY TESTING 

 The integrity of Pipeline coating shall be carried out after Pull back operation of HDD pipeline 
section. 

CIPL/GAIL/JHBDPL BAPL‐ SEC‐  DATE : 17.02.2020 
TITLE : COATING INTEGRITY SURVEY 
II/TCP/PRO/M15/02  PAGE : 2 / 7 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-HALDIA-


BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

 The  test  must  be  carried  out  before  the  HDD  pipeline  section  is  tied  in  to  main  pipeline 
section  
 Pipe to cable connection to be done both side of HDD section. 
 Measure the natural potential at  both side of HDD section. 
 Setup the temporary impressed current system with digital multimeter connected to measure 
output current to the GI/Copper strip at minimum distance from HDD Pipeline. 
 DC source ( 12 V DC battery) shall be used to impressed current into the HDD section. 
 Positive terminal of DC source connect to the Ground through GI/Copper strip  and Negative 
Terminal connected to pipeline through potentiometer. 
 Place the reference cell at the remote end (opposite to impressed current system) to monitor 
the PSP of HDD section. 
 Impress  current  into  the  bored  pipe  start  at  zero  amps  and  increase  slowly  until  the  bored 
pipe potential is depressed to 1.5 V ON Potenetial with respect to the Cu‐Cuso4 electrode. 
 Note the Current from digital multimeter. 
 After  that  disconnect  the  termporary  anode  and  measure  OFF  potential  at  entry  side  and 
remote side.  
 Attached a 6A switch in the (‐) line circuit of the P/L to measure the off potential on both side 
of HDD section. 
 
7 CONNECTION SCHEME 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CIPL/GAIL/JHBDPL BAPL‐ SEC‐  DATE : 17.02.2020 
TITLE : COATING INTEGRITY SURVEY 
II/TCP/PRO/M15/02  PAGE : 3 / 7 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-HALDIA-


BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

8 EQUATIONS 
 
Average Potential, ∆Eavg = (∆E1 + ∆E2) / 2  
Where ,  
∆E1 = E1ON – E1OFF 
∆E2 = E2ON – E2OFF 
 
Coating Resistance ,RC = ∆Eavg / Ic 
Where , 
RC ‐ Coating resistance , Ohm 
∆Eavg  ‐ Average Potnential , mV  
Ic – Applied Current , mA 
 
Surface Area,S.A =  π D L 
Where , 
S.A – Surface area , m2 
π – Constant (3.1416) 
D – Diameter of pipeline , m 
L – Length of HDD Section , m 
 
Specific coating resistance ,rc’=Rc x S.A 
 
Where , 
rc’ ‐ Specific Coating resistance , Ohm‐m2 
Rc ‐ Coating resistance , Ohm 
S.A ‐ Surface area , m2 
  
9 PRECAUTIONS 

 DC source (12 V battery) shall be fully charged before carrying the test. 
 Ensure all the cable connection before carrying the test. 

10 RISK ASSESSMENT & CONTROL MEASURES 
 
 Only experienced and trained personnel to be deployed for this activity. 
 All personnel of the crew should be fully aware of the potential risk involved with the work. 
 At least one person in the crew shall be trained and be capable of providing first aid in case of 
any electrical or non‐electrical accidents. 

CIPL/GAIL/JHBDPL BAPL‐ SEC‐  DATE : 17.02.2020 
TITLE : COATING INTEGRITY SURVEY 
II/TCP/PRO/M15/02  PAGE : 4 / 7 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-HALDIA-


BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

 All  Measuring  &  Test  Equipment’s  used  must  be  properly  maintained  and  shall  have  valid 
calibration from NABL authorised labs. 
 Use  PPE  (Personal  Protective  Equipment),  i.e.  Helmets,  Shoes,  Aprons  and  Goggles,  gloves 
during working at site. 
 Workers should be cautious, on slippery grounds. 
 Safety procedures shall be followed during construction activities in line with the Project HSE 
procedure 
 
11 PRECAUTION 

 Check Battery Voltage prior to commencement of survey. 
 Check all connections for proper tightness and polarities. 
 
12 ITP AND INSTALLATION REPORT 

Record and document all inspection and installation results obtained in the standard report format 
approved by M/s. MECON. 
 
13 MITIGATION PLAN CRITERIA 

 
Average Specific Coating Resistance  Average Specific Coating Conductance  
Quality of Coating 
( Ohm‐m2 )  ( Siemans/m2 ) 
Excellent  >108  < 1 x 10‐8 
Good  2 x 104 to 108  1 x 10‐4 to 5 x 10‐8           
Fair  103 to 2 x 104  5 x 10‐4 to 1 x 10‐4 
Poor  <103  >1 x 10‐3 
Bare ( Very Poor )  10 ‐ 100  10‐1 to 10‐2 
*Tabel Ref . As per mecon spefication  
 
If calculated specific coating resistance is observed poor or very poor criteria then, we will provide  
cathodic  protection  according  to  calculation  to  fulfill  adequate  protection  till  the  PCP 
commissioning . 
As per mecon specification average specific resistance shall be min 108 Ohm‐m2. 
 
 
 

CIPL/GAIL/JHBDPL BAPL‐ SEC‐  DATE : 17.02.2020 
TITLE : COATING INTEGRITY SURVEY 
II/TCP/PRO/M15/02  PAGE : 5 / 7 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-HALDIA-


BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

INSPECTION AND TEST PLAN FOR COATING INTEGRITY TEST  
BOKARO‐ANGUL SECTION II OF JAGDISHPUR‐HALDIA‐BOKARO‐DHAMRA 
PROJECT 
PIPELINE PROJECT  (JHBDPL) PH‐II 
CLIENT  M/S. GAIL (INDIA) LIMITED 
CONSULTANT  M/S. MECON LIMITED. 
CONTRACTOR  M/S. CORRTECH INTERNATIONAL PVT. LTD. 
DATE   
ITP NO   
Reference Document     Contract Specifications & Approved Design 
Personnel Responsible  CIPL: Site Engineer / Supervisor /Site Incharge 
SR. NO.  ACTIVITY  CIPL  MECON / GAIL 
1  APPROVAL OF PROCEDURE   S  R &A 
2  SURVEY AT SITE  P  W 
3  MEASURING OF POTENTIAL & CURRENT  P  W 
4   REPORT  P  RW 
LEGEND 
A – APPROVAL / ACCEPTANCE  P – PERFORMED BY              
R – REVIEW OF RECORD  RM – RANDOM CHECK       
RW –  RANDOM  WITNESS  S – SUBMITTED BY 
  CIPL  MECON/GAIL 
NAME     
SIGN     
DATE     

CIPL/GAIL/JHBDPL BAPL‐ SEC‐  DATE : 17.02.2020 
TITLE : COATING INTEGRITY SURVEY 
II/TCP/PRO/M15/02  PAGE : 6 / 7 
GAIL ( INDIA ) LIMITED

BOKARO-ANGUL SECTION II OF JAGDISHPUR-


HALDIA-BOKARO-DHAMRA PIPELINE PROJECT
(JHBDPL) PH-II

INSPECTION AND TEST PLAN FOR COATING INTEGRITY TEST  
PROJECT  BOKARO‐ANGUL SECTION II OF JHBDPLPH‐II
CLIENT  M/S. GAIL (INDIA) LIMITED 
CONSULTANT  M/S. MECON LIMITED. 
CONTRACTOR  M/S. CORRTECH INTERNATIONAL PVT. LTD. 
REPORT NO    DATE    
SR. NO.  ACTIVITY  TEST RESULT  REMARKS 
1  LOCATION /CHAINAGE OF HDD CROSSING     
2  DIAMATER OF HDD DECTION ( Inch )     
3  LENGTH OF HDD SECTION ( Mtr )     
4  APPLIED CURRENT – Ic ( mA )     
5  ENTRY SIDE POTENTIAL ‐ E1 ON POTENTIAL ( mV )     
6  ENTRY SIDE POTENTIAL ‐ E1 OFF POTENTIAL ( mV )     
7  REMOTE SIDE POTENTIAL ‐ E2 ON POTENTIAL ( mV )     
8  REMOTE SIDE POTENTIAL ‐ E2 OFF POTENTIAL ( mV )     
9  ∆E1 POTENTIAL ( mV )     
10  ∆E2 POTENTIAL ( mV )     
11  AVERAGE POTENTIAL ∆Eavg ( mV )     
12  SURFACE AREA S.A ( m2 )     
13  COATING RESISTANCE , Rc     
14  SPECIFIC COATING RESISTANCE , rc ‘     
  CIPL  MECON/GAIL 
NAME     
SIGN     
DATE     
 
Average Specific Coating Resistance   
Quality of Coating  Final Result 
( Ohm‐m2 ) 
 
Excellent  100000000 (108)   
Good  10000 – 100000000 (104 – 108)     
Fair  1000 – 10000 (103 – 104)   
Poor  < 1000 (103)     
Bare ( Very Poor )  10 ‐ 100   