Академический Документы
Профессиональный Документы
Культура Документы
7 C6 9 7 96 E A 6B 2 64 4
74 4C6 A94 473 396F FE1 1A3 36B 322 2640 048 8902
A 3
4C C6A 947 739 96FE E1A A36 6B3 226 6404 489 9028 81C
6 9 3 6 1 3 B 2
C6 A9 473 96 FE A3 6B 32 264 4048 890 0281 1C7 74C
A 47 9 FE 1A 6 3 26 04 9 28 C 4C 6A
A9 947 396 6FE 1A 36B B32 2264 404 890 028 1C7 74C 6A 947
3 F 1 3 2 8 2 1 6 9
94 4739 96F E1A A36 6B3 3226 640 0489 902 81C C74 4C6 A94 473 396F
7 E 4 8 C A
47 396 6FE 1A 36B B32 2264 404 890 028 1C7 74C 6A 947 739 96FE E1A
3 F 1 3 3 2 0 8 2 1C 4 6 9 3 6 1 3
4h
39 96FE E1A A36 6B3 226 6404 489 9028 81C 74C C6A A94 4739 96F FE1 A36 6B3
2 A
4.
3.
2.
1.
6 F 1 3 B 2 4 8 0 2 1 7 6 9 7
96 E A3 6B 32 64 048 90 81 C7 4C A 47 396 FE 1A 36B B32 226 6 E
F 1A 6 3 26 0 9 2 C 4 6A 94 3 F 1 3 3 2 40
FE E1A 36B B32 226 404 4890 028 81C 74C C6A 94 739 96F E1A A36 6B3 226 640 489
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36 B3 226 40 489 02
UH(m3/sec)
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36 B3 22 40 489 02 81C
Q.No.1
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B 322 64 048 90 81 C7 4C
Ordinates of 0
Time(hours) 0
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
04 90 28 C7 4C 6A 47 39 FE 1A 36 3 26 04 89 28 1C 4C 6A 94
89 28 1C 4C 6A 94 39 6F 1 36 B3 22 40 89 02 1C 74 6 9 73
02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7 C6 A9 47 96
81 7 C6 A9 47 96 E A 6B 32 64 04 90 81 C7 4C A 47 39 FE
Rice
4
Crop
Cotton
20
4C 6A 947 39 6FE 1A 36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36
Vegetable
Sugarcane
6A 94 39 6F 1A 36 B3 226 40 89 02 1C 74 6A 94 73 6F E1 A3 B3
8
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A 6B 32 26 04
60
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A 36 3 26 40 89
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36 B3 226 40 489 02
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36 B3 22 40 489 02 81C
Attempt any four:-
0
0
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7
All questions carry equal marks.
12
Assume Suitable data if necessary
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
04 90 28 C7 4C 6A 47 39 FE 1A 36 3 26 04 89 28 1C 4C 6A 94
89 28 1C 4C 6A 94 39 6F 1 36 B3 22 40 89 02 1C 74 6 9 73
02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7 C6 A9 47 96
81 7 C6 A9 47 96 E A 6B 32 64 04 90 81 C7 4C A 47 39 FE
C7 4C A 47 39 FE 1A 36 32 26 04 89 28 C 4C 6A 94 39 6F 1A
16
4C 6A 947 39 6FE 1A 36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36
120
120
180
360
120
6A 94 39 6F 1A 36 B3 226 40 89 02 1C 74 6A 94 73 6F E1 A3 B3
(3 HOURS)
4
[a] Define Irrigation & discuss its benefits.
73 6F E1 3 B 22 40 48 02 81 74 C6 A9 73 96 E A3 6B 32 64
[c] Explain different forms of precipitation.
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A 6B 32 26 04
150 120 90
20
5.0
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A 36 3 26 40 89
hectors, canal losses are 25% and reservoir losses are 15%.
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B 322 64 048 90 81 C7 4C
70
24
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
04 90 28 C7 4C 6A 47 39 FE 1A 36 3 26 04 89 28 1C 4C 6A 94
89 28 1C 4C 6A 94 39 6F 1 36 B3 22 40 89 02 1C 74 6 9 73
Attempt any Three questions out of remaining five questions,
02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7 C6 A9 47 96
8
81 7 C6 A9 47 96 E A 6B 32 64 04 90 81 C7 4C A 47 39 FE
0281C74C6A947396FE1A36B322640489
50
28
5.8
700
800
C7 4C A 47 39 FE 1A 36 32 26 04 89 28 C 4C 6A 94 39 6F 1A
1400
1700
1800
4C 6A 947 39 6FE 1A 36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36
[b] What do you understand by canal lining & water logging?
6A 94 39 6F 1A 36 B3 226 40 89 02 1C 74 6A 94 73 6F E1 A3 B3
(ha/cumec)
Duty at field
94 739 6F E1A 36 B3 226 40 489 02 81C 74 C6 94 73 96F E1 A3 6B 22
73 6F E1 3 B 22 40 48 02 81 74 C6 A9 73 96 E A3 6B 32 64
30
32
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A 6B 32 26 04
[e] Discuss the physical factors governing selection of type of dam
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A 36 3 26 40 89
Derive the flood hydrograph in the catchment due to the storm given below:
Paper / Subject Code: 42003 / Irrigation Engineering
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7
20
36
12
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B 322 64 048 90 81 C7 4C
8.8
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
[10]
10
40
81 7 C6 A9 47 96 E A 6B 32 64 04 90 81 C7 4C A 47 39
15%
15%
10%
20%
20%
C7 4C A 47 39 FE 1A 36 32 26 04 89 28 C 4C 6A 94 39 6
irrigation
6A 94 39 6F 1A 36 B3 226 40 89 02 1C 74 6A 94 73 6F
[10]
94 739 6F E1A 36 B3 226 40 489 02 81C 74 C6 94 73 96F E1
[5]
[5]
[5]
[5]
[5]
44
73 6F E1 3 B 22 40 48 02 81 74 C6 A9 73 96 E
[b] The base period, intensity of irrigation and duty of water for various crops under the
[10]
The ɸ-index for the catchment can be assumed to be 0.25 cm/ hour and constant base flow of 20
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A
Q.No.3 [a] Explain various methods use for estimation of missing rainfall data & computation
TOTAL MARKS: 80
canal system are given. Determine the reservoir capacity if the culturable commands area is 4000
Q.No.2 [a] what do you mean by duty, delta & base period? Explain briefly various
Q.P.Code: 40813
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36
TURN OVER
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B
64 48 90 81 C7 C A9 47 96 FE A 6B 3
04 90 28 C7 4C 6A 47 39 FE 1A 36 3
89 28 1C 4C 6A 94 39 6F 1 36 B3 22
02 1C 74 6 9 73 6F E1 A3 B 22
81 7 C6 A9 47 96 E A 6B 32 6
C7 4C A 47 39 FE 1A 36 32 26
4C 6A 947 39 6FE 1A 36 B3 26 40
6 2
1C C74 C6A A94 473 96F FE1 A3 6B3 322 640
7 C6 9 7 96 E A 6B 2 64 4
74 4C6 A94 473 396F FE1 1A3 36B 322 2640 048 8902
A 3
4C C6A 947 739 96FE E1A A36 6B3 226 6404 489 9028 81C
6 9 3 6 1 3 B 2
C6 A9 473 96 FE A3 6B 32 264 4048 890 0281 1C7 74C
A 47 9 FE 1A 6 3 26 04 9 28 C 4C 6A
A9 947 396 6FE 1A 36B B32 2264 404 890 028 1C7 74C 6A 947
3 F 1 3 2 8 2 1 6 9
94 4739 96F E1A A36 6B3 3226 640 0489 902 81C C74 4C6 A94 473 396F
7 E 4 8 C A
47 396 6FE 1A 36B B32 2264 404 890 028 1C7 74C 6A 947 739 96FE E1A
3 F 1 3 3 2 0 8 2 1C 4 6 9 3 6 1 3
39 96FE E1A A36 6B3 226 6404 489 9028 81C 74C C6A A94 4739 96F FE1 A36 6B3
6 F 1 3 B 2 2 4 8 0 2 1 7 6 9 7 6 E A
96 E A3 6B 32 64 048 90 81 C7 4C A 47 396 FE 1A 36B B32 226
F 1A 6 3 26 0 9 2 C 4 6A 94 3 F 1 3 3 2 40
FE E1A 36B B32 226 404 4890 028 81C 74C C6A 94 739 96F E1A A36 6B3 226 640 489
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36 B3 226 40 489 02
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36 B3 22 40 489 02 81C
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7
aquifer.
(a)Ogee spillway
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A 6B 32 26 04
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A 36 3 26 40 89
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36 B3 226 40 489 02
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36 B3 22 40 489 02 81C
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B 322 64 048 90 81 C7 4C
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
04 90 28 C7 4C 6A 47 39 FE 1A 36 3 26 04 89 28 1C 4C 6A 94
___________________
64 48 90 81 C7 C A9 47 96 FE A 6B 32 64 04 90 28 C7 4C 6A
04 90 28 C7 4C 6A 47 39 FE 1A 36 3 26 04 89 28 1C 4C 6A 94
89 28 1C 4C 6A 94 39 6F 1 36 B3 22 40 89 02 1C 74 6 9 73
02 1C 74 6 9 73 6F E1 A3 B 22 64 48 02 81 7 C6 A9 47 96
81 7 C6 A9 47 96 E A 6B 32 64 04 90 81 C7 4C A 47 39 FE
0281C74C6A947396FE1A36B322640489
C7 4C A 47 39 FE 1A 36 32 26 04 89 28 C 4C 6A 94 39 6F 1A
aquifer? (b) Also determine the draw down in the main well.
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A 6B 32 26 04
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A 36 3 26 40 89
Paper / Subject Code: 42003 / Irrigation Engineering
6A 94 39 6F 1A 36 B3 226 40 89 02 1C 74 6A 94 73 6F
94 739 6F E1A 36 B3 226 40 489 02 81C 74 C6 94 73 96F E1
[05]
[04]
[06]
[10]
[10]
[05]
[05]
[05]
water, and (iii) c=1.What will be corresponding values of H if uplift is neglected? [10]
73 6F E1 3 B 22 40 48 02 81 74 C6 A9 73 96 E
[b] A 30 cm diameter well penetrates 25m below the static water table. After 24 hours of
96 E A3 6B 32 64 48 90 81 C7 C A 47 96 FE 1A
pumping @5400liters/minute, the water level in a test well at 90 m is lowered by 0.53 m,
Q.No.4 [a] Derive an expression for discharge from a well fully penetrating a unconfined
permissible height H (a) when no tension is permissible, and (b) when the factor of safety
against sliding is 1.5. Given the following: (i) µ=0.5, (ii) density of masonry=24 times the
Q.P.Code: 40813
FE 1A 6B 32 26 04 90 28 C 4C 6A 94 39 F 1A
1A 36 32 26 404 89 28 1C 74C 6A 94 739 6F E1A 36
36 B3 26 404 89 028 1C 74C 6A 94 739 6F E1 36
B3 22 40 89 02 1C 74 6 9 73 6F E1 A3 B
22 640 48 02 81 74 C6 A9 473 96 E1 A3 6B
64 48 90 81 C7 C A9 47 96 FE A 6B 3
04 90 28 C7 4C 6A 47 39 FE 1A 36 3
89 28 1C 4C 6A 94 39 6F 1 36 B3 22
02 1C 74 6 9 73 6F E1 A3 B 22
81 7 C6 A9 47 96 E A 6B 32 6
C7 4C A 47 39 FE 1A 36 32 26
4C 6A 947 39 6FE 1A 36 B3 26 40
6 2