2250-TK-064 2250-AG-064 2250-AG-064A 2250-PP-025 2250-PP-025A 2250-PP-026 2250-PP-026A 2250-PP-206 2250-PP-206A 2250-PP-207 2250-PP-207A
PIPELINE PIPELINE FEED PIPELINE FEED TANK AGITATOR - PIPELINE PIPELINE FEED PUMP - PIPELINE PIPELINE FEED PUMP - PIPELINE PIPELINE FEED PUMP - PIPELINE FEED
PIPELINE FEED PUMP -
FEED TANK TANK AGITATOR ELECTRICAL MOTOR FEED PUMP ELECTRICAL MOTOR FEED PUMP ELECTRICAL MOTOR FEED PUMP ELECTRICAL MOTOR PUMP
ELECTRICAL MOTOR
Working Volume: 350 m3 Impeller D = 3.2 m 37 kW (V) 1 1 0 m3/h, 64.5 m.f.c. TDH 55 kW (V) 1 1 0 m3/h, 64.5 m.f.c. TDH 55 kW (V) 1 1 0 m3/h, 64.5 m.f.c. TDH 55 kW (V) 1 1 0 m3/h, 64.5 m.f.c. TDH
55 kW (V)
8.0 m D x 9.5 m H impeller of steel neoprene coated NOTE 3 Rubber liner Rubber liner Rubber liner Rubber liner
Carbon steel, neoprene liner (TYP.)
A A
PY PDI
051 21 051 21
2250-CT-2"-L3E0HQ-1 6570
PROCESS WATER
2250-PW-6"-C1 E2A-1 651 0
209 2831 -PR-PID-000006
FROM PROCESS WATER 2250-PW-6"-C1 E2A-1 651 0 PI
DISTRIBUTION
2"x1 -1 /2" 051 06
HS-1 005 PI PAL
AF
051 02
I PP-206/207
I NC
C1 E2A FIT IA
05090 05090 1 0879 051 1 3
AF
AG-064 HV 1 0870
LAH YC P3
051 02 2" 2" V-1 6622 2"
V-1 6567
CU CONCENTRATE LAL L3E0HQ
2265-CT-4"-L1 E0VJ-1 9077 051 00 V-1 6560 FE
IA
21 1 2265-PR-PID-000002 E M 2250-PP-026A
*
HV 1 0870 L3E0HQ L3T0HH
PE
FROM PUMP 2265-PP-063 SLO 1 .0 m 2250-PP-025A V-1 6533 SSL 2"
NOTE 8 E
M 051 1 3
1 00.0 m
HV
IA SAL
1 0869
SSL
1 0869
* 2250-PP-025 2"
TO FLOOR
1 0879
2250-CT-6"-L3E0HQ-02809
V-1 6540 TO FLOOR
NOTE 1 0
M
NOTE 1 1
CU CONCENTRATE
21 3 2290-PR-PID-000001
051 00
2250-CT-6"-L3E0HQ-02808 NOTE 1 0
6"x3"
IA
TO SAMPLER 2290-SA-250
FL SP-1 1 01
6"x3" IA 6"x4" 3" P2 OPEN
YC
SLURRY (LINED) FC S/D 2250-CT-6"-L3T0HH-0281 0
6"x4" 3" P2 OPEN 051 1 2
2240-SL-4"-L1 E0VJ-1 5558 IA YC 2250-PP-026 NC PP-025/026
1 454 2240-PR-PID-000002 FL FC
051 05
I S/D
FROM PUMP 2240-PP-020 PE YC P2 3" NC PP-025/026 HV
SLO 1 .0 m NOTE 8 HH-1 366 2250-CT-6"-L3E0HQ-02809
FC 051 1 2
1 00.0 m 051 01 NC HH-1 365 HV
V-1 6535
V-1 6532
+
1 /2"
1 /2"
+
NOTE 7 1 0871
M1
1 0864 1 0874
V-1 6529 V-1 6537
2250-GW-1 -1 /2"-C1 E2A-1 6541 2250-GW-1 -1 /2"-C3E2E-1 6537
D D
NOTE 7
LIT
2250-GW-1 -1 /2"-C1 E2A-1 6544
M 05090
As informed in
Radar
PI
M2
communication
YC
051 36
051 40
from Company
1 2" YC
M2
to Contractor
N-3
2250-AG-064A CLOSE
051 33 2250-CT-2"-L3E0HQ-1 6554 N° CFC-0589,
S/D PIT 2250-PW-2"-C1 E2A-1 6548 dated January
PP-206/207
V-1 6523 051 36
2"x1 -1 /2"
YC
P3 04, 2019,
201 9, this
IA SAL
AF
C1 E2A
8" SUCTION NOZZLE
I P&ID is being
2250-SU-1 2"-C1 E2R-02802
AF
YC
N-1
YC P3
L1 E0VJ
FC
051 32 L3E0HQ 2" V-1 6623
rejected.
NC
E SP-1 099 051 30 V-1 6621 E
M 2250-PP-207A
IA 08-01 -201 9
08-01-2019 Marcial Mendoza E
*
HV 2"
V-1 6528 SSL HV
E
M 2250-PP-206A
*
051 32
2" 051 43
2250-AG-064 IA SAL SSL 1 0889
2250-PP-206 TO FLOOR
2250-CT-6"-L3E0HQ-02807
8" SUCTION NOZZLE 1 0899 1 0899
HV NOTE 1 0
6" 2250-CT-6"-L3E0HQ-02806 6"x3"
IA
N-2 SP-1 1 00 051 30 6"x4" IA FL
2250-CT-6"-L1 E0VJ-1 6536 6"x4" 3" P2
6"x3" YC
FC
V-1 6526
1 0891
+
1 0884
1 /2"
IA IA
1 /2"
NC NOTE 7 (TIP.)
8"
V-1 651 6
V-1 651 7 V-1 6524 1 -1 /2"x1 " V-1 6527
1 -1 /2"x1 " 1 -1 /2"x1 " FISL 2250-GW-1 -1 /2"-C1 E2A-1 651 7 FISL
1 0882 1 -1 /2"x1 " 1 0892
FO V-1 6520 FO
YF-1 027 Vane YF-1 028 Vane HV
+
TO FLOOR 1 0894
2250-GW-1 -1 /2"-C1 E2A-1 6530 2250-GW-1 -1 /2"-C3E2E-1 6533
NOTE 1 0 2250-GW-1 -1 /2"-C3E2E-1 651 8
GLAND SEAL WATER 2250-GW-2"-C1 E2A-1 6544 V-1 651 8 NOTE 7
V-1 6525
1 399 2831 -PR-PID-00001 4
FROM GLAND SEAL WATER 2"x1 -1 /2"
DISTRIBUTION
GLAND SEAL WATER 2"x1 -1 /2"
2250-GW-2"-C3E2E-1 651 6
21 2 2831 -PR-PID-00001 4 SPANISH LANGUAGE GOVERNS
FROM GLAND SEAL WATER
X ENGLISH LANGUAGE GOVERNS
DISTRIBUTION
ENGINEERING
4.- FOR FLUID CODES DETAILS SEE DRAWING N° 4-V2-2000-PR-PID-000004.
DESIGNED DRAWN SYAM 05-1 2-1 8
5.- TO GET UNIFORMLY DISTRIBUTED PUMP POWER, BOTH PUMPS ARE RUNNING AT SAME SPEED. BY: BY:
0 08-03-1 8 ISSUED APPROVED FOR DESIGN FC HA JB 8.- MINIMUM SLOPE REQUIRED. ENGINEERING MGR: JOSHI\LEGGETT 05-1 2-1 8 PROJECT MGR: A. KING 05-1 2-1 8
A 08-08-1 7 ISSUED FOR INTERNAL REVIEW CA HA JB CONCENTRATE THICKENING - PFD 4-V2-2240-PR-PFD-000001 1 1 .- EMERGENCY PONDS PENDING BY DESIGN DEVELOPMENT.
VENDOR DRAWING N°: CONTRACT N°: BHP DRAWING N° : REV.
Rev.
N o.
DATE REVISION DIS. REV. D.L BH P REFEREN CE DOCU MEN TS N ° BHP NOTES 4-V2-2250-PR-PID-000001 85001 35645 4-V2-2250-PR-PID-000001 1
1 2 3 4 5 6 7 8