Вы находитесь на странице: 1из 61

STV EXTENSION – STV SOUTH WEST PROJECT

EPCI FOR WHP-SVSW, PIPELINES


AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 2 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

REVISION RECORD SHEET

NO. REV. NO. CONTENT OF REVISION DATE OF REVISION

1 A Issued for Review and Comment 04 April 2014


STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 3 of 13


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

TABLE OF CONTENTS
1.0  INTRODUCTION : ......................................................................................................... 4 
2.0  PURPOSE : ...................................................................................................................... 4 
3.0  DEFINITION: .................................................................................................................. 4 
4.0  SCOP OF WORK: ........................................................................................................... 4 
5.0  CODES & STANDARDS : ............................................................................................. 4 
6.0  UNITS: ............................................................................................................................. 4 
7.0  ANALYSIS AND DESIGN SOFTWARE : .................................................................... 4 
8.0  ANALYSIS CASE : ........................................................................................................ 4 
9.0  DYNAMIC LOAD FACTOR : ....................................................................................... 5 
10.0  DESIGN PILE PARAMETERS: ..................................................................................... 5 
11.0  ANALYSIS RESULT:..................................................................................................... 6 
12.0  CONCLUSION : .............................................................................................................. 6 
13.0  PILE HANDLING SEQUENCES : ................................................................................. 6 
14.0  REFERENCES DRAWING : .......................................................................................... 9 

LIST OF EXHIBITS AND APPENDICES :


Appendix 1 : Refences Drawing.
Appendix 2 : Pile upending Calculation.
Appendix 3 : Stopper Strength Check.
Appendix 4 : Padeye Strength Check.
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 4 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

1.0 INTRODUCTION :
The WHP-SVSW Jacket is a tripod jacket and will be installed in average water depth of 48.990
m with one pile at each leg. The total number of piles to be driven is therefore three (3). Each pile
comprises five (5) segments with out-diameter of 1219.0 mm with non-uniform wall thickness.
All piles will be driven through the jacket legs, with batter of 1:12 at leg A2,A4 and 1: 6.928 at
legs B3. Appendix A shows the pile make-up. The target pile penetration is 99.8 m below mud
line, which is equivalent to 100.146 m of inclined penetration (note: inclined penetration was used
for analysis).
2.0 PURPOSE :
The purpose of this document is to address the engineering issues of the SVNE Pile structural
integrity check during upending stage. The structural integrity check for pile during transportation
is presented in report “SVSW piles transportation stability analysis and Sea fastening Design
Report”. Document No: “2013-1489-6R-3008”.
3.0 DEFINITION:
CLJOC : Cuu Long Joint Operating Company .
VSP : Vietsovpetro Joint Venture.
SVSW : Su Tu Vang South West
WHP : Well Head Platform.
4.0 SCOP OF WORK:
The aim of this analysis is to determine the structural integrity of the piles during handling stages.
The analysis covers two critical upending and lifting on VSP-05 Transportation Barge by Truong
Sa Barge Crane.
5.0 CODES & STANDARDS :
-API API RP2A(WSD) 21st Edition-American Petroleum Institute.
-AISC Manual of Steel Construction (ASD) 9th Edition-American Institute of Steel Construction.
6.0 UNITS:
This report use metric units of measure based upon the International System of Units in all
documentation and drawings, in accordance with Metric System of Units:[m],[kg],[s],[N].
Tones are used for weight reporting purposes (1MT=1.000kg).
7.0 ANALYSIS AND DESIGN SOFTWARE :
- The analysis have been carried out by spreadsheet hand calculation in accordance with code and
standard requirement.
8.0 ANALYSIS CASE :
-Lifting pile : the structural integrity of piles was investigated based on spreadsheet/hand
calculation with dynamic amplification factor of 1.2 and a consequence factor of 1.3 in
accordance with DNV Fixed Offshore Installations-Lifting Operation (June-1996).The strength of
pile during lifting is found tope satisfactory. Detail calculations are present in Appendix B.
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 5 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

-Upending pile: Upending operation is to be performed by using lifting gear attach to the top of
the pile and stopper. The integrity of the pile was checked considering the case starting from pile
at initial upending phase to pile at 85 degree.
9.0 DYNAMIC LOAD FACTOR :
- Overall Factor =DAF * Consequence Factor * Weight Contingency Factor
=> Overall Factor =1.2*1.3*1.05=1.638
10.0 DESIGN PILE PARAMETERS:
-All pile are made up of various thickness and grade to withstand the different loading stages as
required. The following table presents information of pile section make-up, grade and wall
thickness for SVNE Jacket.
The Piles were modelled as follows:
Pile diameters =1219 (50 inch)
Wall thickness and Pile length shown in Table 3.1.
Elastic modulus=2.08x10^5 N/mm2
Specific minimum yield strength of steel=345 N/mm for Type 2 steel.
Specific minimum yield strength of steel=415 N/mm for Type 2A steel
Total  Total 
Row  OD  Length  Weight  Material 
Thk  Remarks  Length  Weight 
A2‐A4  [mm]  [mm]  (Mt)  Type 
[mm]  (mm)  (Mt) 
1219  50  5365 Pile Cut‐off  7.73  2 
Segment 
1219  50  15635    23780 22.54  32.77  2 
 P5 
1097  25  3780 Stabbing guide  2.50  2 
1219  50  600 Pile Cut‐off  0.86  2A 
Segment  40.36 
1219  50  27400    30780 39.50  2A 
 P4 
1097  25  3780 Stabbing guide  2.50  2A 
1219  60  600 Pile Cut‐off  1.03  2A 
Segment  1219  60  3000    5.14  58.16  2A 
33780
P3  1219  60  27400    46.99  2A 
1097  25  3780 Stabbing guide  2.50  2 
1219  60  600 Pile Cut‐off  1.03  2A 
Segment  1219  60  6000    10.29  2A 
36780 53.31 
P2  1219  50  27400    39.50  2 
1097  25  3780 Stabbing guide  2.50  2 
Segment  1219  50  49000   70.63  2 
51000 74.06 
P1  1219  60  2000   3.43  2 
Table 1.1 : Pile Weight Row A2-A4.
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 6 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

Total  Total 
Row  OD  Length  Weight  Material 
Thk  Remarks  Length  Weight 
A2‐A4  [mm]  [mm]  (Mt)  Type 
[mm]  (mm)  (Mt) 
1219  50  5365 Pile Cut‐off  7.73  2 
Segment 
1219  50  15635    23780 22.54  32.77  2 
 P5 
1097  25  3780 Stabbing guide  2.50  2 
1219  50  600 Pile Cut‐off  0.86  2A 
Segment  40.36 
1219  50  27400    30780 39.50  2A 
 P4 
1097  25  3780 Stabbing guide  2.50  2A 
1219  60  600 Pile Cut‐off  1.03  2A 
Segment  1219  60  3000    5.14  58.16  2A 
33780
P3  1219  60  27400    46.99  2A 
1097  25  3780 Stabbing guide  2.50  2 
1219  60  600 Pile Cut‐off  1.03  2A 
Segment  1219  60  6000    10.29  2A 
36780 53.31 
P2  1219  50  27400    39.50  2 
1097  25  3780 Stabbing guide  2.50  2 
Segment  1219  50  49000   70.63  2 
51000 74.06 
P1  1219  60  2000   3.43  2 
Table 1.1 : Pile Weight Row B3
11.0 ANALYSIS RESULT:
- The maximum combined stress ratio for the pile 1219x60mm length 51m during upending
under Self-weight with Dynamic Amplification Factor ,Consequences Factor and Weight
Contingency Factor is 0.44 with α is 15 degree .
-The maximum horizontal reaction at upending stopper is 60.6MT with α is 45 degree.
12.0 CONCLUSION :
The structural intergrity of the pile was analysed during offshore installation lift and upend
operation.Members were check allowable values in accordance with API RP 2A and AISC code
check requirement.Result of the analysis show that all stress ratio are less than unity.It can be
concluded that the Piles is structurallay adequated during offshore lift.
13.0 PILE HANDLING SEQUENCES :
- Slings will be installed to the pad-eye of the pile and connected to Truong Sa’ hook. The pile
was lifted up from transportation barge deck where the pile will be upended into correct position
to be stabbed into the jacket leg.
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 9 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

14.0 REFERENCES DRAWING :


No: Documents Reference Document Title
1. 2013-1489-66-3021 - SVSW Jacket pile make-up.
2. 2013-1489-66-3004 - Layout Jacket Piles,Drilling deck and Boat-landing on barge.
3. 2013-1489-66-3025 -Truong Sa mooring anchor pattern for pile driving.
4. 2013-1489-66-3022 - Piles lifting rigging configuration and pad-eye detail
5. 2013-1489-66-3005 - Jacket,Piles,Drilling deck and Boat landing sea fastening detail.
6. 2013-1489-66-3027 - Pile Installation sequences.
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 10 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

APPENDIX 1
REFERENCES DRAWING
CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


STEP-7

CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


STEP-8 PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


CUU LONG JOINT OPERATING COMPANY

STV EXTENSION PLAN - STV SOUTH WEST


PROJECT (SVSW) - EPCI FOR WHP-SVSW,
PIPELINES AND CPP MODIFICATIONS

WELL HEAD PLATFORM SUTUVANG SOUTH WEST


STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 11 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

APPENDIX 2
PILE UPENDING CALCULATION
SVSW PILE HANDING ANALYSIS
Uppending stage
This analysis present the piles structural intergrity check during upending.

Description P1 P2 P3 P4 P5 .(1)
Material Yeld Strength Fy(N/mm2) 345 345 345 345 415 345 415 415 345 415 415 345 345 .(2)
Pile OD,D(m) 1.219 1.219 1.097 1.219 1.219 1.097 1.219 1.219 1.097 1.219 1.219 1.097 1.219
Wall thickness,t(m) 0.06 0.05 0.025 0.05 0.06 0.025 0.06 0.06 0.025 0.06 0.05 0.025 0.05
Pile length,L(m) 2 49 3.78 27.4 6.6 3.78 27.4 3.6 3.78 2 26 3.78 21
Crosssection Area,A(m2) 0.218 0.184 0.084 0.184 0.218 0.084 0.218 0.218 0.084 0.218 0.184 0.084 0.184
Inetial Moment,I(m4) 0.037 0.031 0.012 0.031 0.037 0.012 0.037 0.037 0.012 0.037 0.031 0.012 0.031
Radius of gyration,R(m) 0.410 0.414 0.379 0.414 0.410 0.379 0.410 0.410 0.379 0.410 0.414 0.379 0.414
Section Modulus,S(m3) 0.060 0.052 0.022 0.052 0.060 0.022 0.060 0.060 0.022 0.060 0.052 0.022 0.052
Material density,ro(MT/m3) 7.85 7.85 7.85 7.85 7.85 7.85 7.85 8.85 7.85 7.85 7.85 7.85 7.85
3.430 70.632 2.498 39.496 11.319 2.498 46.990 6.960 2.498 3.430 37.478 2.498 30.271
Pile Weight,(MT)
74.06 53.31 56.45 43.41 32.77
Overall factor 1.64 1.64 1.64 1.64 1.64 .(3)
Pile factor weight,W(MT) 121.31 87.33 92.46 71.10 53.68
Unbreaced Length,Lu(m) 51 36.78 33.78 30.78 23.78 .(4)
Effective length factor,K 1.00 1.00 1.00 1.00 1.00
K.Lu/R 124.29 123.28 97.02 88.91 89.64 89.10 82.33 82.33 89.10 75.02 74.41 62.73 57.48
Module of Elasticity,E(N/mm2) 208000 208000 208000 208000 208000 208000 208000 208000 208000 208000 208000 208000 208000
Cc 109.09 109.09 109.09109.09 99.47 109.09 99.47 99.47 109.09 99.47 99.47 109.09 109.09
Allowable Comp.Stress,ft(N/mm2) 63.42 65.28 109.07120.98 128.84 120.70 143.14 143.14 120.70 156.64 157.74 154.95 160.95 (*)
Note:
.(1) P1,P2,P3,P4,P5 are pile name.Refer to pile make up drawing in appendix A
.(2) Overall Factor=DAFxConsequence FactorxWeight Contingency Factor=1.2*1.3*1.05 = 1.638
.(3) See Sketch in the next page.
(*)K.Lu/R<Cc
1.Upending α= 0 α= 0 cos(α)= 1.00
Descriptions P1 P2 P3 P4 P5
a(m) 25.319 19.382 17.723 15.730 12.374
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 61.087 41.308 43.950 34.764 25.747
Vertical reaction at HOOK,R2(MT) 60.226 46.019 48.512 36.336 27.929
Horizotal reaction at STOPPER(MT) 0.000 0.000 0.000 0.000 0.000
Max bending Moment,Mb(KN.m) 7586.767 401.486 390.424 273.555 159.551
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 112.532 59.551 57.910 40.575 23.666
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525
UC1 0.424 0.224 0.218 0.153 0.089
Comp Stress,Fc 0.000 0.000 0.000 0.000 0.000
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.000 0.000 0.000 0.000 0.000
Tension Stress,Ft(N/mm2) 0.000 0.000 0.000 0.000 0.000
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.000 0.000 0.000 0.000 0.000
Max.Combined UC 0.424 0.224 0.218 0.153 0.089
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 6.607 4.756 10.982 3.872 2.923
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.048 0.034 0.080 0.023 0.021
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 15 α= 15 cos(α)= 0.97
Descriptions P1 P2 P3 P4 P5
a(m) 24.456 18.722 17.119 15.194 11.952
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 63.139 42.876 45.603 36.002 26.698
Vertical reaction at HOOK,R2(MT) 58.174 44.451 46.859 35.098 26.978
Horizotal reaction at STOPPER(MT) 30.328 21.832 23.116 17.775 13.419
Max bending Moment,Mb(KN.m) 7328.254 387.806 377.121 264.234 154.115
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 108.697 57.522 55.937 39.193 22.859
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.409 0.217 0.211 0.148 0.086
Comp Stress,Fc 1.710 1.231 2.842 1.002 0.757
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.027 0.010 0.020 0.006 0.005
Tension Stress,Ft(N/mm2) 0.820 0.627 1.440 0.495 0.380
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.004 0.003 0.006 0.002 0.002
Max.Combined UC 0.440 0.229 0.236 0.156 0.093
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 6.381 4.594 10.608 3.740 2.823
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.046 0.033 0.077 0.023 0.020
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 30 α= 30 cos(α)= 0.87
Descriptions P1 P2 P3 P4 P5
a(m) 21.927 16.785 15.349 13.623 10.716
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 69.156 47.473 50.450 39.632 29.488
Vertical reaction at HOOK,R2(MT) 52.157 39.854 42.013 31.468 24.187
Horizotal reaction at STOPPER(MT) 52.530 37.814 40.038 30.787 23.242
Max bending Moment,Mb(KN.m) 6570.333 347.697 338.117 236.906 138.175
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 97.455 51.573 50.152 35.139 20.495
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.367 0.194 0.189 0.132 0.077
Comp Stress,Fc 3.303 2.378 5.491 1.936 1.462
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.052 0.018 0.038 0.012 0.009
Tension Stress,Ft(N/mm2) 1.420 1.085 2.495 0.857 0.659
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.007 0.005 0.010 0.003 0.003
Max.Combined UC 0.426 0.218 0.237 0.148 0.089
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 5.721 4.119 9.511 3.353 2.531
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.041 0.030 0.069 0.020 0.018
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 45 α= 45 cos(α)= 0.71
Descriptions P1 P2 P3 P4 P5
a(m) 17.903 13.705 12.532 11.123 8.749
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 78.727 54.787 58.159 45.406 33.927
Vertical reaction at HOOK,R2(MT) 42.586 32.540 34.303 25.693 19.749
Horizotal reaction at STOPPER(MT) 60.657 43.663 46.231 35.550 26.838
Max bending Moment,Mb(KN.m) 5364.655 283.893 276.071 193.433 112.820
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 79.572 42.109 40.949 28.691 16.734
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.300 0.159 0.154 0.108 0.063
Comp Stress,Fc 4.672 3.363 7.765 2.738 2.067
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.074 0.026 0.054 0.017 0.013
Tension Stress,Ft(N/mm2) 1.640 1.253 2.881 0.989 0.760
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.008 0.006 0.012 0.004 0.004
Max.Combined UC 0.381 0.191 0.220 0.129 0.080
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 4.672 3.363 7.765 2.738 2.067
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.034 0.024 0.056 0.016 0.015
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 60 α= 60 cos(α)= 0.50
Descriptions P1 P2 P3 P4 P5
a(m) 12.660 9.691 8.862 7.865 6.187
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 91.200 64.317 68.207 52.932 39.711
Vertical reaction at HOOK,R2(MT) 30.113 23.010 24.256 18.168 13.965
Horizotal reaction at STOPPER(MT) 52.530 37.814 40.038 30.787 23.242
Max bending Moment,Mb(KN.m) 3793.384 200.743 195.212 136.778 79.776
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 56.266 29.775 28.955 20.288 11.833
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.212 0.112 0.109 0.076 0.045
Comp Stress,Fc 5.721 4.119 9.511 3.353 2.531
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.090 0.032 0.066 0.021 0.016
Tension Stress,Ft(N/mm2) 1.420 1.085 2.495 0.857 0.659
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.007 0.005 0.010 0.003 0.003
Max.Combined UC 0.309 0.149 0.186 0.101 0.063
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 3.303 2.378 5.491 1.936 1.462
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.024 0.017 0.040 0.012 0.011
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 75 α= 75 cos(α)= 0.26
Descriptions P1 P2 P3 P4 P5
a(m) 6.553 5.016 4.587 4.071 3.202
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 105.725 75.416 79.907 61.695 46.447
Vertical reaction at HOOK,R2(MT) 15.588 11.911 12.556 9.404 7.229
Horizotal reaction at STOPPER(MT) 30.328 21.832 23.116 17.775 13.419
Max bending Moment,Mb(KN.m) 1963.600 103.912 101.049 70.801 41.295
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 29.125 15.413 14.988 10.502 6.125
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.110 0.058 0.056 0.040 0.023
Comp Stress,Fc 6.381 4.594 10.608 3.740 2.823
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.101 0.036 0.074 0.024 0.018
Tension Stress,Ft(N/mm2) 0.820 0.627 1.440 0.495 0.380
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.004 0.003 0.006 0.002 0.002
Max.Combined UC 0.214 0.097 0.136 0.065 0.042
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 1.710 1.231 2.842 1.002 0.757
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.012 0.009 0.021 0.006 0.005
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
1.Upending @ α= 85 α= 85 cos(α)= 0.09
Descriptions P1 P2 P3 P4 P5
a(m) 2.207 1.689 1.545 1.371 1.078
Fy(N/mm2) 345.0 345.0 345.0 345.0 345.0
Vertical reaction at STOPPER,R1(MT) 116.064 83.316 88.235 67.933 51.242
Vertical reaction at HOOK,R2(MT) 5.249 4.011 4.228 3.167 2.434
Horizotal reaction at STOPPER(MT) 10.533 7.582 8.028 6.173 4.660
Max bending Moment,Mb(KN.m) 661.230 34.992 34.028 23.842 13.906
Section modul about strong axis 67418955.667 67418955.667 67418955.667 67418955.667 67418955.667
Max bending Stress,fb(N/mm2) 9.808 5.190 5.047 3.536 2.063
Allowable Bending stress,Fb(N/mm2) 265.525 265.525 265.525 265.525 265.525 (**)
UC1 0.037 0.020 0.019 0.013 0.008
Comp Stress,Fc 6.581 4.738 10.940 3.857 2.912
Allowable Comp. stress,ft(N/mm2) 63.418 128.835 143.139 157.736 160.946
UC2 0.104 0.037 0.076 0.024 0.018
Tension Stress,Ft(N/mm2) 0.285 0.218 0.500 0.172 0.132
Allowable Tens.Stress,ft(N/mm2) 207.000 207.000 249.000 249.000 207.000
UC3 0.001 0.001 0.002 0.001 0.001
Max.Combined UC 0.142 0.057 0.097 0.038 0.026
Conclusion----> PASS PASS PASS PASS PASS
Max Shear Stress,Fs(N/mm2) 0.576 0.414 0.957 0.337 0.255
Allowable Shear stress,fs(N/mm2) 138.000 138.000 138.000 166.000 138.000
UC4 0.004 0.003 0.007 0.002 0.002
Conclusion----> PASS PASS PASS PASS PASS
(**) 10340/Fy<=D/t<=20680/Fy
The allowable beam shear stress,Fv should be determine from: Fy=0.4*Fy
The allowable Tension stress,Ft for cylindrical member subjected to axial tensile loads shoud be determine from:Ft=0.6*Fy
The allowable bending stress Fb should be determine from:Fb=0.75*Fy
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 12 of 12


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

APPENDIX 3
STOPPER STRENTH CHECK
Transverse stopper strength check at Pile segment 1 :
a b Fy= 345 (N/mm2)
Plate 1: 300 40 (mm)
Plate 2: 300 30 (mm)
Force at 2 stopper: 127.37 (Base weight of segment P1+P2)
Factor force = 208.64 = 2086.40 (KN)
Force at one each stopper = 1043.20 (KN)
Shear Check:
Shear area: 21000 (mm2)
Shear stress 49.68
Allowable stress: 0.4*Fy 138 (N/mm2)
Stress ratio: 0.36 OK
Compress Check: E= 208 (KN/mm2)
Compress area: 21000 mm2

Length l = 330 (mm)


Radius of gyration: r = 57.36 (mm)
Effective length fact K = 1.00
Cc = 109.09
Kl/r = 5.75
.=> Kl/r < Cc
.=>The allowable axial compress stress:
Fa = 204.29 (N/mm2)
Compress stress fc=F/A = 49.68 (N/mm2)
Stress ratio: = 0.24 OK
Bending Check:
Inetial Moment Ix-x = Σ bh^3/12 +ΣA(y-Y)^2
Ix-x = 230689285.7 (mm4)
Pile Leg = 1392
Pile Thickness = 50
Moment arm: a(max) = 98 (mm)
y x A x-X x-Y A(x-X)^2 A(y-Y)^2
PL1 180 0 12000 0 70.714 0 60006122
PL2 15 0 9000 0 -94.29 0 80008163
109.29 0 21000 0 140014286
Ix-x = Σ bh^3/12 +ΣA(y-Y)^2 (mm4) Cx1= 20
Ix-x = 230689285.7 (mm4) Cx2= 150
Iy-y = Σ b^3h/12 +ΣAd2 (mm4) Cy1= 220.71
Iy-y = 69100000 (mm4) Cy2= 109.29
Sx-x = 1537928.57 (mm3)
Sy-y = 313074.43 (mm3)
Mx-x = 102233.6293 (KNmm)
fb = 66.47488786 (KN/mm2)

Moment bending: Mx-x = 102233.6293 (KNmm)


Section modul: Sx-x = 1537928.571 (mm3)
Bending stress: fby = 66.47488786 (N/mm2)
Allowable bending stress 0.75 = 258.75 (N/mm2)
Stress ratio: = 0.26 OK
STV EXTENSION – STV SOUTH WEST PROJECT
EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS SuTuVangSouthWest

Document No.: Page: 13 of 13


2013-1489-6R-3010 PILE HANDLING ANALYSIS
REPORT
Revision No: A Date:04 April 2014

APPENDIX 4
PADEYE STRENTH CHECK
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR SEGMENT PILE 1 V.D.H PCK N.D.T 8-Apr-14
A) Geometry Design

Pin Hole Height, Hh = 175 mm


mm
Main Plate Thickness, Tm = 40 mm
Main Plate Radius, Rm = 175 mm
Main Pate Height, H = 600 mm
Welding Type at Main Plate = W3
Double fillet welding W1
Fillet welding W2
Double bevel welding W3

1st Cheek Plate Thickness, Tc1 = 30 mm


1st Cheek Plate Radius, Rc1 = 140 mm
Welding Size at 1st Cheek Plate, a1 = 20 mm

Pin Diameter, Do = 114 mm


Pin Hole Radius, Ro = 57 mm
Pin Hole Height, Ho = 175 mm

Plate Yield Stress, Fy = 345 Mpa

B) Reinforcement with Stiffeners

Flange #1
Width, W1 = 500 mm
Thickness, T1 = 30 mm
Length = 229 mm
Depth, D1 = 615 mm

Flange #2
Width, W2 = 230 mm
Thickness, T2 = 30 mm
Length = 319 mm
Depth, D2 = 216 mm

Flange #3
Width, W3 = 500 mm
Thickness, T3 = 30 mm
Length = 229 mm
Depth, D3 = -15 mm

Flange #4
Width, W4 = 0 mm
Thickness, T4 = 0 mm
Length = 0 mm
Depth, D4 = 0 mm
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR SEGMENT PILE 1 V.D.H PCK N.D.T 8-Apr-14
2. DESIGNED SLING FORCE
Weight of Segment P1 Ø1219x60 length=51m = 74.06 MT
Sling Force, P1 = 726.5 kN
Designed Sling Force, P = 2x P1 = 1453.1 kN (F.O.S=2)
Sling Angle to the Horizontal, α = 0 Deg
Sling Angle to Padeye, φ = 90 Deg (See figure previous page)
Sling Angle to the Padeye In-plane Axis, θ = 0 Deg (See sketch above)

Designed Padeye In-plane Forces, Pin = Pcosθ = 1453.1 kN


Out-of-Plane Forces, Pop = P*Sinθ*Sinφ = 0 kN
5% Addition Out-of-Plane, 5% x P = 72.7 kN (API Requirement)
Designed Out-of-plane Force, Pout = Pop + 5%Pin = 72.7 kN
2. SUMMARY OF RESULTS

A) Geometry Check
Shackle Information
Shackle Type = # 151 Green-Pin P-6036 (150 M.T.) Heavy Duty Anchor Shackle
Shackle Size = - mm
Max. Working Load = 150 tonnes = 1471.5 kN
Dimension A = 275 mm
Dimension B = 702 mm
Dimension C = 126 mm
Dimension D = 400 mm
Pin Diameter, Dp = 108.0 mm
Jaw Width, W = 165 mm
Packing Plate Thickness, Tpp = 0 mm
Sling to Pin Hole Eccentricity, E = 404 mm
Weight M = 160.0 Kg

Sling Information
Sling Diameter, Ds = 100 mm
Min. Breaking Load = 775 ton = 7602.75 kN
Max. Working Load = 193.75 tonnes = 1900.6875 kN

Geometry Check of Main Plate and Cheek Plate


Minimum Y = Tc = 30 mm
Dimension Y = Rm-Rc = 35 mm
So: Rm-Rc >= Tc O.K.

Minimum Z = Tm = 40 mm
Dimension Z = Hh-Rc = 50 mm
So: Hh-Rc >= Tm O.K.

Geometry Check of Shackle


Minimum Hole Size = Dp + 3 mm = 111.00 mm
Maximum Hole Size = Dp + 9 mm = 117.00 mm
Hole Size, Do = 2Ro = 114 mm
So: Dp+3mm ≤ 2Ro ≤ Dp+9 O.K.

Minimum Sling Clearance = 0.5 Ds = 50 mm


Sling Clearance, Cs = D+0.5Dp-Ds-Rm = 179.00 mm
So: 0.5Ds ≤ D +0.5Dp - Ds -Rm O.K.
3. PADEYE CHECK

A) Bearing Stress
Allowable Bearing Stress, FB = 0.9 Fy = 310.5 (N/mm2)
Max Bearing Force, PB = Designed Padeye In-plane Force = 1453.1 kN
2
Area Required, AB = P/FB = 4679.7 mm
Thickness Required, TB = AB/(ΠDp/4) = 52.3 mm
Total Thickness Provided, TT = Tm+2Tc = 100.0 mm
Inside width, a = 230 mm > Thickness of Plate Provided = 100.0 mm

So: Thickness of plate provided ≥ Required Thickness O.K.

B) Pull Out Shear Stress


Allowable Shear Stress, Fv = 0.4 Fy = 138 MPa
Shear Force, Pv = Designed Padeye In-plane Force = 1453.1 kN
Area Required, Av = P/ Fv = 10529.4 mm2
Radius of Main Plate, Rm = 175 mm
Radius of Cheek Plate 1, Rc1 = 140 mm
Radius of hole, Ro = = 57 mm
Shear Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 29360 mm2

So: Shear Area Provided ≥ Required Thickness O.K.


C) Tension (Through Pinhole Diameter)

Allowable Tensile Stress, FT = 0.45 Fy = 155.25 MPa


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR SEGMENT PILE 1 V.D.H PCK N.D.T 8-Apr-14
Area Required, AT = P/FT = 9359.5 mm2
Tension Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 29360 mm2
So: Tension Area Provided ≥ Area Required O.K.

D) Combined Stress
D.1) Neutral Axis

` Section Area Di(C.O.G.x) Area*Di Dy(C.O.G.y)


mm2 mm mm3 mm
Stiff1 15000 615 9.23E+06 0 Neutral Axis (Dxx) => Σ(Area*Di)/Σ(Area)
Stiff2 13800 216 2.98E+06 0 In-plane X= 282.90 mm
Stiff3 15000 -15 -2.25E+05 0
Stiff4 0 0 0.00E+00 0
Main Plate 24000 300 7.20E+06 0
Combined 67800 282.90 1.92E+07 0

3
D.2) First Moment of Area above & below Neutral Axis QN.A. = 13231896 mm
D.2) Moment of Inertia

Section Area Di Di-Dxx Ixx=Ix+A*d2 Iyy=Iy


mm2 mm mm mm4 mm4
Stiff1 15000 615 332.10 1.97E+09 1.1E+06
Stiff2 13800 216 -66.90 1.23E+08 1.0E+06
Stiff3 15000 -15 -297.90 1.64E+09 1.1E+06
Stiff4 0 0 -282.90 0.00E+00 0.0E+00
Main Plate 24000 300 17.10 1.02E+07 7.2E+08
Combined 67800 3.74E+09 7.2E+08

D.3) Design Force

In-plane
MHxx (About N.A) = (PCosθCosα)(Hh) = 254.29 kN-m
(Horizontal Component)
MVxx (About N.A) = -(Psinα)(Dxx - Ho) = -156.79 kN-m
(Vertical Component)
Resultant Moment, MRes = MHxx + MVxx = 97.50 kN-m
Shear Force, Px = PinCosα = 1453.06 kN
Axial Force, Py = PinSinα = 0.00 kN
Out-of-plane
Out-of-plane Mom., Mout = Pout*Hh = 12.71 kN-m

D.4) Stress in Main Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Av. Shear Stress, fv = Px / (HTm) = 60.54 MPa
Shear Stress at N.A., fv' = (PxQN.A.)/(IxxTm) = 128.41 < 0.4Fy=138MPa
O.K.
In-plane Bending Stress,
fbx(Top) = -[Mres(Dxx)]/Ixx = -7.37 MPa
fbx(Bot) = +[Mres(H-Dxx)]/Ixx = 8.26 MPa
Out-plane Bending Stress, fby = (+/-)[Mout(Tm/2)]Iyy = 0.35 MPa

Combined Stresses (AISC Formula)


Allow. Axial Stress, Fa = 0.60 Fy = 207 MPa
Allow. Major Bending Stress, Fbx = 0.66 Fy = 227.7 MPa
Allow. Minor Bending Stress, Fby = 0.75 Fy = 258.75 MPa

Interaction Ratio, I.R. at N.A. = [fa/Fa]+[fby/Fby] = 0.00 O.K.


Interaction Ratio, I.R. at Top = [fa/Fa]+[fbx(Top)/Fbx]+[fby/Fby] = 0.03 O.K.
Interaction Ratio, I.R. at Bottom = [fa/Fa]+[fbx(Bot)/Fbx]+[fby/Fby] = 0.04 O.K.
So: Max Interaction Ratio 0.04 < 1 OK

Combined Stresses (Huber-Mises Formula)


Allow. Combined Stresses, Fall = 0.9 Fy = 310.50 MPa

2 2 2 0.5
σN.A = {σx2 0.5
+ 3τ xy} = {[fa+fby] + 3fv' } = 222.41 MPa
Interaction Ration, I.R. = σ N.A / Fall = 0.72 O.K.

σTop = {σx2 + 3τ2xy}0.5 = {[fa+fbx(Top)+fby]2 + 3fv'2}0.5 = 222.52 MPa


Interaction Ration, I.R. = σ Top / Fall = 0.72 O.K.

σBot = {σx2 + 3τ2xy}0.5


2 2 0.5
= {[fa+fbx(Bot)+fby] + 3fv' } = 222.57
Interaction Ration, I.R. = σ Bot / Fall = 0.72 O.K.

D.5) Stress in Top Stiff Plate (- = Comp., + = Tens.)


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR SEGMENT PILE 1 V.D.H PCK N.D.T 8-Apr-14

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 2.52 Mpa < 0.4Fy O.K.

In-plane Bending Stress, fbx = -(MRes(Dxx-D1)/Ixx = 8.65 MPa


Out-plane Bending Stress, fby = (+/-)[Mout(W1/2)]/Iyy = 4.39 MPa

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = 0.05 O.K.

D.6 Stress in Bottom Stiff Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 2.52 O.K.

In-plane Bending Stress, fbx = (MRes(H-Dxx)/Ixx = 8.26


Out-plane Bending Stress, fby = (+/-)[Mout(W3/2)]/Iyy = 2.0

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = -0.03 O.K.
So: [fa/Fa]+[fbx/Fbx]+[fby/Fby] <1

Combined Stresses (Huber-Mises Formula)

σBot = {σx2 + 3τ2xy}0.5 = {[fa+fbx+fby]2 + 3fv'2}0.5 = 11.17


Interaction Ration, I.R. = σ Bot / Fall = 0.04

E) Check Circumferential Weld Between Main Plate & Flange

Welding Type at Main Plate: W1 Check welding at Main Plate


Welding size at Main Plate: a = 30 mm
Selected Type of Electrode E07xx 70 ksi
Ultimate Tensile Strength, Fexx = 460 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 138 MPa

Force in each welding of Main Plate, P1 = P


= 1453.06 kN
Lengh of Weld, Lw = 0.5*2*H = 600 mm
Welding Shear Stress, fw = P/(0.707aLw) = 114.18 MPa
Interaction Stress, I.R = fw / Fw = 0.83 < 1 O.K.
F) Check Circumferential Weld Between Cheek Plate & Main Plate

Selected Type of Electrode E07xx 70 ksi


Ultimate Tensile Strength, Fexx = 460 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 138 MPa

Force in each welding of Cheek Plate 1, Pc1 = P*(Tc1)/(Tm+2Tc1)


= 435.92 kN
Lengh of Weld, Lw = 0.5(2πRc1) = 439.82 mm
Weld Size, a1 = 20 mm
Welding Shear Stress, fw = Pc1/(0.707aLw) = 70.09 MPa
Interaction Stress, I.R = fw / Fw = 0.51 < 1 O.K.
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 2 V.D.H PCK N.D.T 8-Apr-14
A) Geometry Design

Pin Hole Height, Hh = 220 mm


mm
Main Plate Thickness, Tm = 40 mm
Main Plate Radius, Rm = 220 mm
Main Pate Height, H = 700 mm
Welding Type at Main Plate = W3
Double fillet welding W1
Fillet welding W2
Double bevel welding W3

1st Cheek Plate Thickness, Tc1 = 30 mm


1st Cheek Plate Radius, Rc1 = 160 mm
Welding Size at 1st Cheek Plate, a1 = 20 mm

Pin Diameter, Do = 114 mm


Pin Hole Radius, Ro = 57 mm
Pin Hole Height, Ho = 220 mm

Plate Yield Stress, Fy = 345 Mpa

B) Reinforcement with Stiffeners

Flange #1
Width, W1 = 250 mm
Thickness, T1 = 30 mm
Length = 506 mm
Depth, D1 = 235 mm

Flange #2
Width, W2 = 550 mm
Thickness, T2 = 30 mm
Length = 506 mm
Depth, D2 = -15 mm

Flange #3
Width, W3 = 500 mm
Thickness, T3 = 30 mm
Length = 229 mm
Depth, D3 = 715 mm

Flange #4
Width, W4 = 0 mm
Thickness, T4 = 0 mm
Length = 0 mm
Depth, D4 = 0 mm
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 2 V.D.H PCK N.D.T 8-Apr-14
2. DESIGNED SLING FORCE
Pile Weight of segment P1+P2 = 127.37 MT
Sling Force, P1 = 624.7 KN
Designed Sling Force, P = 2x P1 = 1249.5 kN (F.O.S=2)
Sling Angle to the Horizontal, α = 0 Deg
Sling Angle to Padeye, φ = 90 Deg (See figure previous page)
Sling Angle to the Padeye In-plane Axis, θ = 0 Deg (See sketch above)

Designed Padeye In-plane Forces, Pin = Pcosθ = 1249.5 kN


Out-of-Plane Forces, Pop = P*Sinθ*Sinφ = 0 kN
5% Addition Out-of-Plane, 5% x P = 62.5 kN (API Requirement)
Designed Out-of-plane Force, Pout = Pop + 5%Pin = 62.5 kN
2. SUMMARY OF RESULTS

A) Geometry Check
Shackle Information
Shackle Type = # 151 Green-Pin P-6036 (150 M.T.) Heavy Duty Anchor Shackle
Shackle Size = - mm
Max. Working Load = 150 tonnes = 1471.5 kN
Dimension A = 275 mm
Dimension B = 702 mm
Dimension C = 126 mm
Dimension D = 400 mm
Pin Diameter, Dp = 108.0 mm
Jaw Width, W = 165 mm
Packing Plate Thickness, Tpp = 0 mm
Sling to Pin Hole Eccentricity, E = 416 mm
Weight M = 160.0 Kg

Sling Information
Sling Diameter, Ds = 76 mm
Min. Breaking Load = 425 Mt = 4169.25 kN
Max. Working Load = 106.25 tonnes = 1042.3125 kN

Geometry Check of Main Plate and Cheek Plate


Minimum Y = Tc = 30 mm
Dimension Y = Rm-Rc = 60 mm
So: Rm-Rc >= Tc O.K.

Minimum Z = Tm = 40 mm
Dimension Z = Hh-Rc = 60 mm
So: Hh-Rc >= Tm O.K.

Geometry Check of Shackle


Minimum Hole Size = Dp + 3 mm = 111.00 mm
Maximum Hole Size = Dp + 9 mm = 117.00 mm
Hole Size, Do = 2Ro = 114 mm
So: Dp+3mm ≤ 2Ro ≤ Dp+9 O.K.

Minimum Sling Clearance = 0.5 Ds = 38 mm


Sling Clearance, Cs = D+0.5Dp-Ds-Rm = 158.00 mm
So: 0.5Ds ≤ D +0.5Dp - Ds -Rm O.K.

3. PADEYE CHECK

A) Bearing Stress
Allowable Bearing Stress, FB = 0.9 Fy = 310.5 (N/mm2)
Max Bearing Force, PB = Designed Padeye In-plane Force = 1249.5 kN
Area Required, AB = P/FB = 4024.2 mm2
Thickness Required, TB = AB/(ΠDp/4) = 44.9 mm
Total Thickness Provided, TT = Tm+2Tc = 100.0 mm

So: Thickness of plate provided ≥ Required Thickness O.K.

B) Pull Out Shear Stress


Allowable Shear Stress, Fv = 0.4 Fy = 138 MPa
Shear Force, Pv = Designed Padeye In-plane Force = 1249.5 kN
Area Required, Av = P/ Fv = 9054.3 mm2
Radius of Main Plate, Rm = 220 mm
Radius of Cheek Plate 1, Rc1 = 160 mm
Radius of hole, Ro = = 57 mm
Shear Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 37760 mm2

So: Shear Area Provided ≥ Required Thickness O.K.


C) Tension (Through Pinhole Diameter)

Allowable Tensile Stress, FT = 0.45 Fy = 155.25 MPa


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 2 V.D.H PCK N.D.T 8-Apr-14
Area Required, AT = P/FT = 8048.3 mm2
Tension Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 37760 mm2
So: Tension Area Provided ≥ Area Required O.K.

D) Combined Stress
D.1) Neutral Axis

` Section Area Di(C.O.G.x) Area*Di Dy(C.O.G.y)


mm2 mm mm3 mm
Stiff1 15000 235 3.53E+06 0 Neutral Axis (Dxx) => Σ(Area*Di)/Σ(Area)
Stiff2 16500 -15 -2.48E+05 0 In-plane X= 319.50 mm
Stiff3 15000 715 1.07E+07 0
Stiff4 0 0 0.00E+00 0
Main Plate 28000 350 9.80E+06 0
Combined 74500 319.50 2.38E+07 0

3
D.2) First Moment of Area above & below Neutral Axis QN.A. = 16075097 mm
D.2) Moment of Inertia

Section Area Di Di-Dxx Ixx=Ix+A*d2 Iyy=Iy


mm2 mm mm mm4 mm4
Stiff1 15000 235 -84.50 1.85E+08 1.1E+06
Stiff2 16500 -15 -334.50 2.26E+09 1.2E+06
Stiff3 15000 715 395.50 2.66E+09 1.1E+06
Stiff4 0 0 -319.50 0.00E+00 0.0E+00
Main Plate 28000 350 30.50 2.98E+07 1.1E+09
Combined 74500 5.14E+09 1.1E+09

D.3) Design Force

In-plane
MHxx (About N.A) = (PCosθCosα)(Hh) = 274.89 kN-m
(Horizontal Component)
MVxx (About N.A) = -(Psinα)(Dxx - Ho) = -124.32 kN-m
(Vertical Component)
Resultant Moment, MRes = MHxx + MVxx = 150.57 kN-m
Shear Force, Px = PinCosα = 1249.50 kN
Axial Force, Py = PinSinα = 0.00 kN
Out-of-plane
Out-of-plane Mom., Mout = Pout*Hh = 13.74 kN-m

D.4) Stress in Main Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Av. Shear Stress, fv = Px / (HTm) = 44.62 MPa
Shear Stress at N.A., fv' = (PxQN.A.)/(IxxTm) = 97.77 < 0.4Fy=138MPa
O.K.
In-plane Bending Stress,
fbx(Top) = -[Mres(Dxx)]/Ixx = -9.37 MPa
fbx(Bot) = +[Mres(H-Dxx)]/Ixx = 11.16 MPa
Out-plane Bending Stress, fby = (+/-)[Mout(Tm/2)]Iyy = 0.24 MPa

Combined Stresses (AISC Formula)


Allow. Axial Stress, Fa = 0.60 Fy = 207 MPa
Allow. Major Bending Stress, Fbx = 0.66 Fy = 227.7 MPa
Allow. Minor Bending Stress, Fby = 0.75 Fy = 258.75 MPa

Interaction Ratio, I.R. at N.A. = [fa/Fa]+[fby/Fby] = 0.00 O.K.


Interaction Ratio, I.R. at Top = [fa/Fa]+[fbx(Top)/Fbx]+[fby/Fby] = 0.04 O.K.
Interaction Ratio, I.R. at Bottom = [fa/Fa]+[fbx(Bot)/Fbx]+[fby/Fby] = 0.05 O.K.
So: Max Interaction Ratio 0.05 < 1 OK

Combined Stresses (Huber-Mises Formula)


Allow. Combined Stresses, Fall = 0.9 Fy = 310.50 MPa

σN.A = {σx2 + 3τ2xy}0.5


2 2 0.5
= {[fa+fby] + 3fv' } = 169.34 MPa
Interaction Ration, I.R. = σ N.A / Fall = 0.55 O.K.

2
σTop = {σx2 + 3τ xy}
0.5
= {[fa+fbx(Top)+fby]2 + 3fv'2}0.5 = 169.59 MPa
Interaction Ration, I.R. = σ Top / Fall = 0.55 O.K.

σBot = {σx + 3τ2xy}0.5 {[fa+fbx(Bot)+fby]2 + 3fv'2}0.5


2
= = 169.73
Interaction Ration, I.R. = σ Bot / Fall = 0.55 O.K.

D.5) Stress in Top Stiff Plate (- = Comp., + = Tens.)


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 2 V.D.H PCK N.D.T 8-Apr-14

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 1.98 Mpa < 0.4Fy O.K.

In-plane Bending Stress, fbx = -(MRes(Dxx-D1)/Ixx = -2.48 MPa


Out-plane Bending Stress, fby = (+/-)[Mout(W1/2)]/Iyy = 1.50 MPa

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = 0.02 O.K.

D.6 Stress in Bottom Stiff Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 1.98 O.K.

In-plane Bending Stress, fbx = (MRes(H-Dxx)/Ixx = 11.16


Out-plane Bending Stress, fby = (+/-)[Mout(W3/2)]/Iyy = 3.3

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = -0.04 O.K.
So: [fa/Fa]+[fbx/Fbx]+[fby/Fby] <1

Combined Stresses (Huber-Mises Formula)

σBot = {σx2 + 3τ2xy}0.5 = {[fa+fbx+fby]2 + 3fv'2}0.5 = 14.85


Interaction Ration, I.R. = σ Bot / Fall = 0.05

E) Check Circumferential Weld Between Main Plate & Flange

Welding Type at Main Plate: W1 Check welding at Main Plate


Welding size at Main Plate: a = 30 mm
Selected Type of Electrode E07xx 70 ksi
Ultimate Tensile Strength, Fexx = 460 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 138 MPa

Force in each welding of Main Plate, P1 = P


= 1249.50 kN
Lengh of Weld, Lw = 0.5*2*H = 700 mm
Welding Shear Stress, fw = P/(0.707aLw) = 84.16 MPa
Interaction Stress, I.R = fw / Fw = 0.61 < 1 O.K.
F) Check Circumferential Weld Between Cheek Plate & Main Plate

Selected Type of Electrode E07xx 70 ksi


Ultimate Tensile Strength, Fexx = 483 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 144.9 MPa

Force in each welding of Cheek Plate 1, Pc1 = P*(Tc1)/(Tm+2Tc1)


= 374.85 kN
Lengh of Weld, Lw = 0.5(2πRc1) = 502.65 mm
Weld Size, a1 = 20 mm
Welding Shear Stress, fw = Pc1/(0.707aLw) = 52.74 MPa
Interaction Stress, I.R = fw / Fw = 0.36 < 1 O.K.
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 3 V.D.H PNV/PCK N.D.T 8-Apr-14
A) Geometry Design

Pin Hole Height, Hh = 150 mm


mm
Main Plate Thickness, Tm = 40 mm
Main Plate Radius, Rm = 150 mm
Main Pate Height, H = 500 mm
Welding Type at Main Plate = W3
Double fillet welding W1
Fillet welding W2
Double bevel welding W3

1st Cheek Plate Thickness, Tc1 = 25 mm


1st Cheek Plate Radius, Rc1 = 100 mm
Welding Size at 1st Cheek Plate, a1 = 20 mm

Pin Diameter, Do = 74 mm
Pin Hole Radius, Ro = 37 mm
Pin Hole Height, Ho = 150 mm

Plate Yield Stress, Fy = 345 Mpa

B) Reinforcement with Stiffeners

Flange #1
Width, W1 = 200 mm
Thickness, T1 = 25 mm
Length = 341 mm
Depth, D1 = -162 mm

Flange #2
Width, W2 = 440 mm
Thickness, T2 = 25 mm
Length = 341 mm
Depth, D2 = -12.5 mm

Flange #3
Width, W3 = 0 mm
Thickness, T3 = 0 mm
Length = 0 mm
Depth, D3 = 0 mm

Flange #4
Width, W4 = 0 mm
Thickness, T4 = 0 mm
Length = 0 mm
Depth, D4 = 0 mm
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 3 V.D.H PNV/PCK N.D.T 8-Apr-14
2. DESIGNED SLING FORCE
Pile Weight of segment 3 = 56.45 MT
Sling Force, P1 = 276.9 kN
Designed Sling Force, P = 2x P1 = 553.8 kN (F.O.S=2)
Sling Angle to the Horizontal, α = 0 Deg
Sling Angle to Padeye, φ = 90 Deg (See figure previous page)
Sling Angle to the Padeye In-plane Axis, θ = 0 Deg (See sketch above)

Designed Padeye In-plane Forces, Pin = Pcosθ = 553.8 kN


Out-of-Plane Forces, Pop = P*Sinθ*Sinφ = 0 kN
5% Addition Out-of-Plane, 5% x P = 27.7 kN (API Requirement)
Designed Out-of-plane Force, Pout = Pop + 5%Pin = 27.7 kN
2. SUMMARY OF RESULTS

A) Geometry Check
Shackle Information
Shackle Type = # 129 Green-Pin G4163 (55.0 M.T.) Chain/Safety Chain Shackle
Shackle Size = - mm
Max. Working Load = 55 tonnes = 539.6 kN
Dimension A = 180 mm
Dimension B = 436 mm
Dimension C = 74 mm
Dimension D = 260 mm
Pin Diameter, Dp = 70.0 mm
Jaw Width, W = 105 mm
Packing Plate Thickness, Tpp = 0 mm
Sling to Pin Hole Eccentricity, E = 263 mm
Weight M = 42.0 Kg

Sling Information
Sling Diameter, Ds = 64 mm
Min. Breaking Load = 301 Mt = 2952.81 kN
Max. Working Load = 75.25 tonnes = 738.2025 kN

Geometry Check of Main Plate and Cheek Plate


Minimum Y = Tc = 25 mm
Dimension Y = Rm-Rc = 50 mm
So: Rm-Rc >= Tc O.K.

Minimum Z = Tm = 40 mm
Dimension Z = Hh-Rc = 50 mm
So: Hh-Rc >= Tm O.K.

Geometry Check of Shackle


Minimum Hole Size = Dp + 3 mm = 73.00 mm
Maximum Hole Size = Dp + 9 mm = 79.00 mm
Hole Size, Do = 2Ro = 74 mm
So: Dp+3mm ≤ 2Ro ≤ Dp+9 O.K.

Minimum Sling Clearance = 0.5 Ds = 32 mm


Sling Clearance, Cs = D+0.5Dp-Ds-Rm = 81.00 mm
So: 0.5Ds ≤ D +0.5Dp - Ds -Rm O.K.

3. PADEYE CHECK

A) Bearing Stress
Allowable Bearing Stress, FB = 0.9 Fy = 310.5 (N/mm2)
Max Bearing Force, PB = Designed Padeye In-plane Force = 553.8 kN
Area Required, AB = P/FB = 1783.5 mm2
Thickness Required, TB = AB/(ΠDp/4) = 30.7 mm
Total Thickness Provided, TT = Tm+2Tc = 90.0 mm
Inside width, a = 200 mm > Thickness of Plate Provided = 90.0 mm

So: Thickness of plate provided ≥ Required Thickness O.K.

B) Pull Out Shear Stress


Allowable Shear Stress, Fv = 0.4 Fy = 138 MPa
Shear Force, Pv = Designed Padeye In-plane Force = 553.8 kN
Area Required, Av = P/ Fv = 4012.9 mm2
Radius of Main Plate, Rm = 150 mm
Radius of Cheek Plate 1, Rc1 = 100 mm
Radius of hole, Ro = = 37 mm
Shear Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 21640 mm2

So: Shear Area Provided ≥ Required Thickness O.K.


C) Tension (Through Pinhole Diameter)

Allowable Tensile Stress, FT = 0.45 Fy = 155.25 MPa


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 3 V.D.H PNV/PCK N.D.T 8-Apr-14
Area Required, AT = P/FT = 3567.0 mm2
Tension Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 21640 mm2
So: Tension Area Provided ≥ Area Required O.K.

D) Combined Stress
D.1) Neutral Axis

` Section Area Di(C.O.G.x) Area*Di Dy(C.O.G.y)


mm2 mm mm3 mm
Stiff1 5000 -162 -8.10E+05 0 Neutral Axis (Dxx) => Σ(Area*Di)/Σ(Area)
Stiff2 11000 -12.5 -1.38E+05 0 In-plane X= 112.57 mm
Stiff3 0 0 0.00E+00 0
Stiff4 0 0 0.00E+00 0
Main Plate 20000 250 5.00E+06 0
Combined 36000 112.57 4.05E+06 0

3
D.2) First Moment of Area above & below Neutral Axis QN.A. = 9980960 mm
D.2) Moment of Inertia

Section Area Di Di-Dxx Ixx=Ix+A*d2 Iyy=Iy


mm2 mm mm mm4 mm4
Stiff1 5000 -162 -274.57 3.94E+08 2.6E+05
Stiff2 11000 -12.5 -125.07 3.50E+08 5.7E+05
Stiff3 0 0 -112.57 0.00E+00 0.0E+00
Stiff4 0 0 -112.57 0.00E+00 0.0E+00
Main Plate 20000 250 137.43 3.80E+08 4.2E+08
Combined 36000 1.12E+09 4.2E+08

D.3) Design Force

In-plane
MHxx (About N.A) = (PCosθCosα)(Hh) = 83.07 kN-m
(Horizontal Component)
MVxx (About N.A) = -(Psinα)(Dxx - Ho) = 20.73 kN-m
(Vertical Component)
Resultant Moment, MRes = MHxx + MVxx = 103.79 kN-m
Shear Force, Px = PinCosα = 553.77 kN
Axial Force, Py = PinSinα = 0.00 kN
Out-of-plane
Out-of-plane Mom., Mout = Pout*Hh = 4.15 kN-m

D.4) Stress in Main Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Av. Shear Stress, fv = Px / (HTm) = 27.69 MPa
Shear Stress at N.A., fv' = (PxQN.A.)/(IxxTm) = 122.99 < 0.4Fy=138MPa
O.K.
In-plane Bending Stress,
fbx(Top) = -[Mres(Dxx)]/Ixx = -10.40 MPa
fbx(Bot) = +[Mres(H-Dxx)]/Ixx = 35.79 MPa
Out-plane Bending Stress, fby = (+/-)[Mout(Tm/2)]Iyy = 0.20 MPa

Combined Stresses (AISC Formula)


Allow. Axial Stress, Fa = 0.60 Fy = 207 MPa
Allow. Major Bending Stress, Fbx = 0.66 Fy = 227.7 MPa
Allow. Minor Bending Stress, Fby = 0.75 Fy = 258.75 MPa

Interaction Ratio, I.R. at N.A. = [fa/Fa]+[fby/Fby] = 0.00 O.K.


Interaction Ratio, I.R. at Top = [fa/Fa]+[fbx(Top)/Fbx]+[fby/Fby] = 0.05 O.K.
Interaction Ratio, I.R. at Bottom = [fa/Fa]+[fbx(Bot)/Fbx]+[fby/Fby] = 0.16 O.K.
So: Max Interaction Ratio 0.16 < 1 OK

Combined Stresses (Huber-Mises Formula)


Allow. Combined Stresses, Fall = 0.9 Fy = 310.50 MPa

σN.A = {σx2 + 3τ2xy}0.5


2 2 0.5
= {[fa+fby] + 3fv' } = 213.02 MPa
Interaction Ration, I.R. = σ N.A / Fall = 0.69 O.K.

2
σTop = {σx2 + 3τ xy}
0.5
= {[fa+fbx(Top)+fby]2 + 3fv'2}0.5 = 213.26 MPa
Interaction Ration, I.R. = σ Top / Fall = 0.69 O.K.

σBot = {σx + 3τ2xy}0.5 {[fa+fbx(Bot)+fby]2 + 3fv'2}0.5


2
= = 216.04
Interaction Ration, I.R. = σ Bot / Fall = 0.70 O.K.

D.5) Stress in Top Stiff Plate (- = Comp., + = Tens.)


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT 3 V.D.H PNV/PCK N.D.T 8-Apr-14

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 1.73 Mpa < 0.4Fy O.K.

In-plane Bending Stress, fbx = -(MRes(Dxx-D1)/Ixx = -25.36 MPa


Out-plane Bending Stress, fby = (+/-)[Mout(W1/2)]/Iyy = 0.99 MPa

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = 0.12 O.K.

D.6 Stress in Bottom Stiff Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 1.73 O.K.

In-plane Bending Stress, fbx = (MRes(H-Dxx)/Ixx = 35.79


Out-plane Bending Stress, fby = (+/-)[Mout(W3/2)]/Iyy = 2.2

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = -0.15 O.K.
So: [fa/Fa]+[fbx/Fbx]+[fby/Fby] <1

Combined Stresses (Huber-Mises Formula)

σBot = {σx2 + 3τ2xy}0.5 = {[fa+fbx+fby]2 + 3fv'2}0.5 = 38.10


Interaction Ration, I.R. = σ Bot / Fall = 0.12

E) Check Circumferential Weld Between Main Plate & Flange

Welding Type at Main Plate: W1 Check welding at Main Plate


Welding size at Main Plate: a = 20 mm
Selected Type of Electrode E07xx 70 ksi
Ultimate Tensile Strength, Fexx = 460 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 138 MPa

Force in each welding of Main Plate, P1 = P


= 553.77 kN
Lengh of Weld, Lw = 0.5*2*H = 500 mm
Welding Shear Stress, fw = P/(0.707aLw) = 78.33 MPa
Interaction Stress, I.R = fw / Fw = 0.57 < 1 O.K.
F) Check Circumferential Weld Between Cheek Plate & Main Plate

Selected Type of Electrode E07xx 70 ksi


Ultimate Tensile Strength, Fexx = 483 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 144.9 MPa

Force in each welding of Cheek Plate 1, Pc1 = P*(Tc1)/(Tm+2Tc1)


= 153.83 kN
Lengh of Weld, Lw = 0.5(2πRc1) = 314.16 mm
Weld Size, a1 = 20 mm
Welding Shear Stress, fw = Pc1/(0.707aLw) = 34.63 MPa
Interaction Stress, I.R = fw / Fw = 0.24 < 1 O.K.
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT4, 5 V.D.H PCK/PNV N.D.T 8-Apr-14
A) Geometry Design

Pin Hole Height, Hh = 150 mm


mm
Main Plate Thickness, Tm = 40 mm
Main Plate Radius, Rm = 130 mm
Main Pate Height, H = 400 mm
Welding Type at Main Plate = W3
Double fillet welding W1
Fillet welding W2
Double bevel welding W3

1st Cheek Plate Thickness, Tc1 = 25 mm


1st Cheek Plate Radius, Rc1 = 100 mm
Welding Size at 1st Cheek Plate, a1 = 20 mm

Pin Diameter, Do = 74 mm
Pin Hole Radius, Ro = 37 mm
Pin Hole Height, Ho = 150 mm

Plate Yield Stress, Fy = 345 Mpa

B) Reinforcement with Stiffeners

Flange #1
Width, W1 = 200 mm
Thickness, T1 = 25 mm
Length = 321 mm
Depth, D1 = 103 mm

Flange #2
Width, W2 = 0 mm
Thickness, T2 = 0 mm
Length = 0 mm
Depth, D2 = 0 mm

Flange #3
Width, W3 = 0 mm
Thickness, T3 = 0 mm
Length = 0 mm
Depth, D3 = 0 mm

Flange #4
Width, W4 = 0 mm
Thickness, T4 = 0 mm
Length = 0 mm
Depth, D4 = 0 mm
VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT4, 5 V.D.H PCK/PNV N.D.T 8-Apr-14
2. DESIGNED SLING FORCE
Pile Weight of segment 5 = 43.41 Mt
Sling Force, P1 = 212.9 kN
Designed Sling Force, P = 2x P1 = 425.9 kN (F.O.S=2)
Sling Angle to the Horizontal, α = 0 Deg
Sling Angle to Padeye, φ = 90 Deg (See figure previous page)
Sling Angle to the Padeye In-plane Axis, θ = 0 Deg (See sketch above)

Designed Padeye In-plane Forces, Pin = Pcosθ = 425.9 kN


Out-of-Plane Forces, Pop = P*Sinθ*Sinφ = 0 kN
5% Addition Out-of-Plane, 5% x P = 21.3 kN (API Requirement)
Designed Out-of-plane Force, Pout = Pop + 5%Pin = 21.3 kN
2. SUMMARY OF RESULTS

A) Geometry Check
Shackle Information
Shackle Type = # 129 Green-Pin G4163 (55.0 M.T.) Chain/Safety Chain Shackle
Shackle Size = - mm
Max. Working Load = 55 tonnes = 539.6 kN
Dimension A = 180 mm
Dimension B = 436 mm
Dimension C = 74 mm
Dimension D = 260 mm
Pin Diameter, Dp = 70.0 mm
Jaw Width, W = 105 mm
Packing Plate Thickness, Tpp = 0 mm
Sling to Pin Hole Eccentricity, E = 270 mm
Weight M = 42.0 Kg

Sling Information
Sling Diameter, Ds = 50 mm
Min. Breaking Load = 162 Mt = 1589.22 kN
Max. Working Load = 40.5 tonnes = 397.305 kN

Geometry Check of Main Plate and Cheek Plate


Minimum Y = Tc = 25 mm
Dimension Y = Rm-Rc = 30 mm
So: Rm-Rc >= Tc O.K.

Minimum Z = Tm = 40 mm
Dimension Z = Hh-Rc = 50 mm
So: Hh-Rc >= Tm O.K.

Geometry Check of Shackle


Minimum Hole Size = Dp + 3 mm = 73.00 mm
Maximum Hole Size = Dp + 9 mm = 79.00 mm
Hole Size, Do = 2Ro = 74 mm
So: Dp+3mm ≤ 2Ro ≤ Dp+9 O.K.

Minimum Sling Clearance = 0.5 Ds = 25 mm


Sling Clearance, Cs = D+0.5Dp-Ds-Rm = 115.00 mm
So: 0.5Ds ≤ D +0.5Dp - Ds -Rm O.K.

3. PADEYE CHECK

A) Bearing Stress
Allowable Bearing Stress, FB = 0.9 Fy = 310.5 (N/mm2)
Max Bearing Force, PB = Designed Padeye In-plane Force = 425.9 kN
Area Required, AB = P/FB = 1371.5 mm2
Thickness Required, TB = AB/(ΠDp/4) = 23.6 mm
Total Thickness Provided, TT = Tm+2Tc = 90.0 mm
Inside width, a = 0 mm False Thickness of Plate Provided = 90.0 mm

So: Thickness of plate provided ≥ Required Thickness O.K.

B) Pull Out Shear Stress


Allowable Shear Stress, Fv = 0.4 Fy = 138 MPa
Shear Force, Pv = Designed Padeye In-plane Force = 425.9 kN
Area Required, Av = P/ Fv = 3085.9 mm2
Radius of Main Plate, Rm = 130 mm
Radius of Cheek Plate 1, Rc1 = 100 mm
Radius of hole, Ro = = 37 mm
Shear Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 20040 mm2

So: Shear Area Provided ≥ Required Thickness O.K.


C) Tension (Through Pinhole Diameter)

Allowable Tensile Stress, FT = 0.45 Fy = 155.25 MPa


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT4, 5 V.D.H PCK/PNV N.D.T 8-Apr-14
Area Required, AT = P/FT = 2743.0 mm2
Tension Area Provided = 2(Rm - Ro) * Tm + 4(Rc1 - Ro) * Tc1+4(Rc2-Ro)*Tc2 = 20040 mm2
So: Tension Area Provided ≥ Area Required O.K.

D) Combined Stress
D.1) Neutral Axis

` Section Area Di(C.O.G.x) Area*Di Dy(C.O.G.y)


mm2 mm mm3 mm
Stiff1 10000 103 1.03E+06 0 Neutral Axis (Dxx) => Σ(Area*Di)/Σ(Area)
Stiff2 0 0 0.00E+00 0 In-plane X= 162.69 mm
Stiff3 0 0 0.00E+00 0
Stiff4 0 0 0.00E+00 0
Main Plate 16000 200 3.20E+06 0
Combined 26000 162.69 4.23E+06 0

3
D.2) First Moment of Area above & below Neutral Axis QN.A. = 573894 mm
D.2) Moment of Inertia

Section Area Di Di-Dxx Ixx=Ix+A*d2 Iyy=Iy


mm2 mm mm mm4 mm4
Stiff1 10000 103 -59.69 6.90E+07 5.2E+05
Stiff2 0 0 -162.69 0.00E+00 0.0E+00
Stiff3 0 0 -162.69 0.00E+00 0.0E+00
Stiff4 0 0 -162.69 0.00E+00 0.0E+00
Main Plate 16000 200 37.31 2.44E+07 2.1E+08
Combined 26000 9.34E+07 2.1E+08

D.3) Design Force

In-plane
MHxx (About N.A) = (PCosθCosα)(Hh) = 63.88 kN-m
(Horizontal Component)
MVxx (About N.A) = -(Psinα)(Dxx - Ho) = -5.41 kN-m
(Vertical Component)
Resultant Moment, MRes = MHxx + MVxx = 58.47 kN-m
Shear Force, Px = PinCosα = 425.85 kN
Axial Force, Py = PinSinα = 0.00 kN
Out-of-plane
Out-of-plane Mom., Mout = Pout*Hh = 3.19 kN-m

D.4) Stress in Main Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Av. Shear Stress, fv = Px / (HTm) = 26.62 MPa
Shear Stress at N.A., fv' = (PxQN.A.)/(IxxTm) = 65.44 < 0.4Fy=138MPa
O.K.
In-plane Bending Stress,
fbx(Top) = -[Mres(Dxx)]/Ixx = -101.89 MPa
fbx(Bot) = +[Mres(H-Dxx)]/Ixx = 148.62 MPa
Out-plane Bending Stress, fby = (+/-)[Mout(Tm/2)]Iyy = 0.30 MPa

Combined Stresses (AISC Formula)


Allow. Axial Stress, Fa = 0.60 Fy = 207 MPa
Allow. Major Bending Stress, Fbx = 0.66 Fy = 227.7 MPa
Allow. Minor Bending Stress, Fby = 0.75 Fy = 258.75 MPa

Interaction Ratio, I.R. at N.A. = [fa/Fa]+[fby/Fby] = 0.00 O.K.


Interaction Ratio, I.R. at Top = [fa/Fa]+[fbx(Top)/Fbx]+[fby/Fby] = 0.45 O.K.
Interaction Ratio, I.R. at Bottom = [fa/Fa]+[fbx(Bot)/Fbx]+[fby/Fby] = 0.65 O.K.
So: Max Interaction Ratio 0.65 < 1 OK

Combined Stresses (Huber-Mises Formula)


Allow. Combined Stresses, Fall = 0.9 Fy = 310.50 MPa

σN.A = {σx2 + 3τ2xy}0.5


2 2 0.5
= {[fa+fby] + 3fv' } = 113.34 MPa
Interaction Ration, I.R. = σ N.A / Fall = 0.37 O.K.

2
σTop = {σx2 + 3τ xy}
0.5
= {[fa+fbx(Top)+fby]2 + 3fv'2}0.5 = 152.21 MPa
Interaction Ration, I.R. = σ Top / Fall = 0.49 O.K.

σBot = {σx + 3τ2xy}0.5 {[fa+fbx(Bot)+fby]2 + 3fv'2}0.5


2
= = 187.14
Interaction Ration, I.R. = σ Bot / Fall = 0.60 O.K.

D.5) Stress in Top Stiff Plate (- = Comp., + = Tens.)


VIETSOVPETRO JOINT VENTURE Project Title Rev.
STV EXTENSION PLAN – STV SOUTH WEST I1
Serial No. Sheet No.
CALCULATION SHEET -------------------------------------------- 1
Calculation Title: Design Check Approved Date
PADEYE CALCULATION FOR PILE SEGMENT4, 5 V.D.H PCK/PNV N.D.T 8-Apr-14

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00 MPa
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 2.13 Mpa < 0.4Fy O.K.

In-plane Bending Stress, fbx = -(MRes(Dxx-D1)/Ixx = -37.38 MPa


Out-plane Bending Stress, fby = (+/-)[Mout(W1/2)]/Iyy = 1.49 MPa

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = 0.17 O.K.

D.6 Stress in Bottom Stiff Plate (- = Comp., + = Tens.)

Individual Stress
Axial Stress, fa = Py / (Total Area) = 0.00
Horizontal Shear Stress, fv = Pout / (Stiffener Area) = 2.13 O.K.

In-plane Bending Stress, fbx = (MRes(H-Dxx)/Ixx = 148.62


Out-plane Bending Stress, fby = (+/-)[Mout(W3/2)]/Iyy = 0.0

Combined Stresses (AISC Formula)


Interaction Ration, I.R. = [fa/Fa]+[fbx/Fbx]+[fby/Fby] = -0.65 O.K.
So: [fa/Fa]+[fbx/Fbx]+[fby/Fby] <1

Combined Stresses (Huber-Mises Formula)

σBot = {σx2 + 3τ2xy}0.5 = {[fa+fbx+fby]2 + 3fv'2}0.5 = 148.66


Interaction Ration, I.R. = σ Bot / Fall = 0.48

E) Check Circumferential Weld Between Main Plate & Flange

Welding Type at Main Plate: W1 Check welding at Main Plate


Welding size at Main Plate: a = 20 mm
Selected Type of Electrode E07xx 70 ksi
Ultimate Tensile Strength, Fexx = 460 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 138 MPa

Force in each welding of Main Plate, P1 = P


= 425.85 kN
Lengh of Weld, Lw = 0.5*2*H = 400 mm
Welding Shear Stress, fw = P/(0.707aLw) = 75.29 MPa
Interaction Stress, I.R = fw / Fw = 0.55 < 1 O.K.
F) Check Circumferential Weld Between Cheek Plate & Main Plate

Selected Type of Electrode E07xx 70 ksi


Ultimate Tensile Strength, Fexx = 483 MPa

Interaction Ratio Check of Welding Strength


Allowable Tensile Strength, Fw = 0.3 Fexx = 144.9 MPa

Force in each welding of Cheek Plate 1, Pc1 = P*(Tc1)/(Tm+2Tc1)


= 118.29 kN
Lengh of Weld, Lw = 0.5(2πRc1) = 314.16 mm
Weld Size, a1 = 20 mm
Welding Shear Stress, fw = Pc1/(0.707aLw) = 26.63 MPa
Interaction Stress, I.R = fw / Fw = 0.18 < 1 O.K.