with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Analysis And Design of Super Structure
I. Introduction:
The analysis of superstructure for evaluating Bending Moment, Shear Force and Deflection is carried out using single
line analysis.
State of Art Midas, Analysis package has been used for analysis of the structure.
The Structure has been idealized as space frame, an assemblage of line elements with loading in vertical and
horizontal directions.
The longitudinal girders subjected to maximum bending moment and shear force have been slelected for design and
proven to be safe for all the loads envisaged.
The design has been carried out by Limit Stress Method as per IRC codes.
IRC SP : 64-2005
V. Material Properties:
i) Dead Load
ii) Superimposed Dead Load
iii) IRC Class 70R Wheeled Vehicle.
iv) IRC Class 70R Trackeded Vehicle.
v) IRC Class A Train of wheeled Vehicles ( 2 Lane)
vi) IRC Special Vehicle
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge
with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Configuration of the Idealised Structure:
12) Depth of the RCC Voided Slab at center 1.35 + 0.25 = 1.600 m
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
Temperature
Coefficent of thermal expansion = 0.000012 /oC
Creep
Cross-sectional Area Ac = 5.485 m2
(Composite Outer Girder at mid span considered)
Perimeter in contact with atmosphere u = 16.799 m
Notational size ho 2Ac/u = 652.999 mm
Age of concrete at the time of loading to = 90 days
t∞ considered = 25550 days
Φ (∞,90) = 1.663 (Refer Appendix B)
@ 1.496 *(Reduced by 10% on the conservative side)
Ecm' = 12818.57 N/mm2
For Composite Cast-in Situ Deck Slab with Girder
Shrinkage
Cross-sectional Area Ac = 5.485 m2
(Precast Beam considered)
Perimeter in contact with atmosphere u = 16.799 m
Notational size ho 2Ac/u = 652.999 mm
7.5 8.50
0.5
CRASH BARRIER 0.00
20.00
20.00
PLAN
C/L of Symettry
8.50
0.250
1.600
C/L brg Nos of Girder = 1.350
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
C/L Jack 1 Nos.
0.7
1.775 0.00 2.65
Super-Structure Cross-Section
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town
including approaches site development and Beautification of proposed lake.
8.50 8.50
0.20 0.20
0.05 0.05
2.20
1.139 1.600 1.600
0.00
0.21
Web Thickening
1.600
C/L of E.J.
0
C/L of Brg.
0.00 4.800
2.200
1.03 1.80
2.83 1.00 5.66
9.49
Web thickness variation along span
Web Thickening
Section At C/L brg. deff L/8 TS 2L/8 3L/8 4L/8
Dist. From C/L brg. 0 1.36 2.37 3.83 4.74 7.11 9.49
bw 4.8 4.8 4.8 2.2 2.2 2.2 2.2
A) Mid Section :-
8.500
1 0.200
2 0.050
4 0.001
5 0.210
4.800
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town
including approaches site development and Beautification of proposed lake.
Ixx
El. B D Area,A Yt A.Yt A.Yt^2 Ixo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 8.500 0.200 1 1.700 0.100 0.170 0.017 5.67E-03
2 0.5 3.150 0.050 2 0.158 0.217 0.034 0.007 2.19E-05
3 1 2.200 1.190 1 2.618 0.795 2.081 1.655 3.09E-01
4 0.5 1.300 0.001 2 0.001 1.390 0.002 0.003 7.22E-11
5 1 4.800 0.210 1 1.008 1.495 1.507 2.253 3.70E-03
TOTAL 5.485 3.794 3.934 3.18E-01
Iyy
El. B D Area,A X A.X A.X^2 Iyo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 0.200 8.500 1 1.700 2.675 4.548 12.165 1.02E+01
2 0.5 0.050 3.150 1 0.079 2.150 0.169 0.364 4.34E-02
0.5 0.050 3.150 1 0.079 6.350 0.500 3.175 4.34E-02
3 1 1.190 2.200 1 2.618 1.100 2.880 3.168 1.06E+00
4 0.5 0.001 1.300 1 0.001 1.533 0.001 0.002 6.10E-05
0.5 0.001 1.300 1 0.001 6.967 0.005 0.032 6.10E-05
5 1 0.210 4.800 1 1.008 1.750 1.764 3.087 1.94E+00
TOTAL 5.485 9.866 21.992 1.33E+01
1
2
3
Torsional Inertia
C = k1 x b3 x bmax
4/ 4
k1 = 1/3{ 1 - 0.63 x b/bmax x ( 1 - b ( 12 x b max )} 4
Section B D bmax b k1 c
1 8.500 0.200 8.500 0.200 0.328 0.022
2 3.150 0.050 3.150 0.050 0.333 0.000
3 2.200 1.190 2.200 1.190 0.221 0.819
4 1.300 0.001 1.300 0.001 0.333 0.000
5 4.800 0.210 4.800 0.210 0.333 0.015
Total : 0.857
B) Support Section :-
8.500
1 0.200
2 0.050
1.350 1.600
3
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town
including approaches site development and Beautification of proposed lake.
4.800
Section at Support
Ixx
El. B D Area,A Yt A.Yt A.Yt^2 Ixo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 8.500 0.200 1 1.700 0.100 0.170 0.017 5.67E-03
2 0.5 1.850 0.050 2 0.093 0.217 0.020 0.004 1.28E-05
3 1 4.800 1.400 1 6.720 0.800 5.376 4.301 1.10E+00
TOTAL 8.513 5.566 4.322 1.10E+00
Iyy
El. B D Area,A X A.X A.X^2 Iyo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 0.200 8.500 1 1.700 3.325 5.653 18.795 1.02E+01
2 0.5 0.050 1.850 1 0.046 3.017 0.140 0.421 8.79E-03
0.5 0.050 1.850 1 0.046 5.483 0.254 1.391 8.79E-03
3 1 1.400 4.800 1 6.720 2.400 16.128 38.707 1.29E+01
TOTAL 8.513 22.174 59.313 2.32E+01
1
2
3
Torsional Inertia
C = k1 x b3 x bmax
4/ 4
k1 = 1/3{ 1 - 0.63 x b/bmax x ( 1 - b ( 12 x b max )}
Section B D bmax b k1 c
1 8.500 0.200 8.500 0.200 0.328 0.022331
2 1.850 0.050 1.850 0.050 0.333 0.000077
3 4.800 1.400 4.800 1.400 0.272 3.582566
Total : 3.604974
8.50 8.50
0.20 0.20
0.05 0.05
2.20
1.139 1.600 1.600
0.00
0.21
Web Thickening
1.600
C/L of E.J.
0
C/L of Brg.
0.00 4.800
2.200
1.03 1.80
2.83 1.00 6.17
10.00
Web thickness variation along span
Web Thickening
Section At C/L brg. deff L/8 TS 2L/8 3L/8 4L/8
Dist. From C/L brg. 0 1.360 2.5 3.83 5.000 7.5 10.00
bw 4.8 4.8 4.8 2.2 2.2 2.2 2.2
A) Mid Section :-
8.500
1 0.200
2 0.050
4 0.001
5 0.210
4.800
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town
including approaches site development and Beautification of proposed lake.
Ixx
El. B D Area,A Yt A.Yt A.Yt^2 Ixo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 8.500 0.200 1 1.700 0.100 0.170 0.017 5.67E-03
2 0.5 3.150 0.050 2 0.158 0.217 0.034 0.007 2.19E-05
3 1 2.200 1.190 1 2.618 0.795 2.081 1.655 3.09E-01
4 0.5 1.300 0.001 2 0.001 1.390 0.002 0.003 7.22E-11
5 1 4.800 0.210 1 1.008 1.495 1.507 2.253 3.70E-03
TOTAL 5.485 3.794 3.934 3.18E-01
Iyy
El. B D Area,A X A.X A.X^2 Iyo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 0.200 8.500 1 1.700 2.675 4.548 12.165 1.02E+01
2 0.5 0.050 3.150 1 0.079 2.150 0.169 0.364 4.34E-02
0.5 0.050 3.150 1 0.079 6.350 0.500 3.175 4.34E-02
3 1 1.190 2.200 1 2.618 1.100 2.880 3.168 1.06E+00
4 0.5 0.001 1.300 1 0.001 1.533 0.001 0.002 6.10E-05
0.5 0.001 1.300 1 0.001 6.967 0.005 0.032 6.10E-05
5 1 0.210 4.800 1 1.008 1.750 1.764 3.087 1.94E+00
TOTAL 5.485 9.866 21.992 1.33E+01
1
2
3
Torsional Inertia
C = k1 x b3 x bmax
4/ 4
k1 = 1/3{ 1 - 0.63 x b/bmax x ( 1 - b ( 12 x b max )} 4
Section B D bmax b k1 c
1 8.500 0.200 8.500 0.200 0.328 0.022
2 3.150 0.050 3.150 0.050 0.333 0.000
3 2.200 1.190 2.200 1.190 0.221 0.819
4 1.300 0.001 1.300 0.001 0.333 0.000
5 4.800 0.210 4.800 0.210 0.333 0.015
Total : 0.857
B) Support Section :-
8.500
1 0.200
2 0.050
1.350 1.600
3
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town
including approaches site development and Beautification of proposed lake.
4.800
Section at Support
Ixx
El. B D Area,A Yt A.Yt A.Yt^2 Ixo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 8.500 0.200 1 1.700 0.100 0.170 0.017 5.67E-03
2 0.5 1.850 0.050 2 0.093 0.217 0.020 0.004 1.28E-05
3 1 4.800 1.400 1 6.720 0.800 5.376 4.301 1.10E+00
TOTAL 8.513 5.566 4.322 1.10E+00
Iyy
El. B D Area,A X A.X A.X^2 Iyo
Factor Nos.
No. (m) (m) (m2) (m) (m3) (m4) (m4)
1 1 0.200 8.500 1 1.700 3.325 5.653 18.795 1.02E+01
2 0.5 0.050 1.850 1 0.046 3.017 0.140 0.421 8.79E-03
0.5 0.050 1.850 1 0.046 5.483 0.254 1.391 8.79E-03
3 1 1.400 4.800 1 6.720 2.400 16.128 38.707 1.29E+01
TOTAL 8.513 22.174 59.313 2.32E+01
1
2
3
Torsional Inertia
C = k1 x b3 x bmax
4/ 4
k1 = 1/3{ 1 - 0.63 x b/bmax x ( 1 - b ( 12 x b max )}
Section B D bmax b k1 c
1 8.500 0.200 8.500 0.200 0.328 0.022331
2 1.850 0.050 1.850 0.050 0.333 0.000077
3 4.800 1.400 4.800 1.400 0.272 3.582566
Total : 3.604974
3.02 SIDL
Load intensity due to wearing course = 1.43 kN/m2
Considering 50 mm of overlay load intensity will be 0.050 X 22 = 1.10 kN/m2
MORTH standard clause no. 2702.5
Total Load intensity due to wearing course = 2.50 kN/m2
Self weight of crash barrier = 10.00 kN/m
Self weight of railing = 0.00 kN/m
Transverse eccentricity of wearing course = 0.00 m
Transverse eccentricity of crash barrier = 4.00 m
Transverse eccentricity of railing = 0.00 m
Transverse eccentricity of footpath = 0.00 m
3.03 FPLL
Maximum intensity of footpath live load = 0.00 kg/m2
b) Differential Temperature
Temperature Rise
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at
Motihari town including approaches site development and Beautification of proposed lake.
17.8
h1 = 0.3 x h < 0.15 m
h1 h2 = 0.3 x h > 0.1 m
4.0 < 0.25 m
h3 = 0.3 x h < 0.15 m
h2 Hence,
h1 = 0.15 m
h2 = 0.25 m
h3 = 0.15 m
0
h3
2.1
Temperature Fall
10.6
h1 = h4 = 0.2 x h < 0.25 m
h1 h2 = h3 = 0.25 x h < 0.25 m
0.7
Hence,
h2 h1 = 0.25 m
h2 = 0.25 m
h3 = 0.25 m
0 h4 = 0.25 m
h3
0.8
h4
6.6
Span 1
Span 2
Span 3
Span 4
Span 1
Span 2
Span 3
Span 4
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
ULS 1(all) kNm -5708 -2116 2498 4265 8509 10802 11070
ULS 2(all) kNm -5708 -2116 2498 4265 8509 10802 11070
ULS 3(all) kNm -3504 894 1304 2504 5252 6612 6584
ULS 4(all) kNm 0 0 0 0 0 0 0
Max Moment (Midas) 5708 2116 2498 4265 8509 10802 11070
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.60 m
C/C distance between Main Bars = 164 mm
Reinforcement at Different Sections
L =0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2L/8 =4.74 3L/8 =7.11 4L/8 =9.49
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 12 35 0.046 12 35 16 32 16 32 16 32 16 32 16 32 0.048
Layer-2 12 35 0.222 12 35 0 0 16 32 16 32 16 32 16 32 0.228
Layer-3 0 0 0.248 0 0 0 0 0 0 0 0 0 0 0 0 0.256
Layer-4 0 0 0.268 0 0 0 0 0 0 0 0 0 0 0 0 0.276
Layer-5 0 0 0.288 0 0 0 0 0 0 0 0 0 0 0 0 0.296
Layer-6 0 0 0.308 0 0 0 0 0 0 0 0 0 0 0 0 0.316
Layer-7 0 0 0.328 0 0 0 0 0 0 0 0 0 0 0 0 0.336
Bar 1 0 0 0 0 12 35 12 35 12 35 12 35 12 35
Bar 2 16 32 16 32 12 35 12 35 12 35 12 35 12 35
Total Ast = 0.014 m2 0.014 m2 0.014 m2 0.021 m2 0.021 m2 0.021 m2 0.021 m2
deff = 1.526 m 1.526 m 1.579 m 1.517 m 1.517 m 1.517 m 1.515 m
dast_o = 1.554 m 1.554 m 1.552 m 1.544 m 1.544 m 1.544 m 1.544 m
hcef1 = (h-d)*2.5 = 0.185 m 0.185 m 0.052 m 0.207 m 0.207 m 0.207 m 0.214 m
Reinforcement provided
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
Dia of bars mm 12 12 16 16 16 16 16
Nos. Nos. 70 70 32 64 64 64 64
Ast m2 0.014 0.014 0.014 0.021 0.021 0.021 0.021
deff m 1.526 1.526 1.579 1.517 1.517 1.517 1.515
dast_o w.r.t Composite section m 1.554 1.554 1.552 1.544 1.544 1.544 1.544
deff m 1.526 1.526 1.579 1.517 1.517 1.517 1.515
w.r.t Precast section
dast_o m 1.554 1.554 1.552 1.544 1.544 1.544 1.544
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
d m 1.526 1.526 1.579 1.517 1.517 1.517 1.515
bt m 1.554 1.554 1.552 1.544 1.544 1.544 1.544
As, min m2 0.0035 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
As, provided m2 0.014 0.014 0.014 0.021 0.021 0.021 0.021
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
Ast m2 0.014 0.014 0.014 0.021 0.021 0.021 0.021
deff m 1.526 1.526 1.579 1.517 1.517 1.517 1.515
λxu m 0.047 0.047 0.047 0.068 0.068 0.068 0.068
CArea m2 0.399 0.399 0.399 0.578 0.578 0.578 0.578
x1 m 0.023 0.023 0.023 0.034 0.034 0.034 0.034
Cu kN 6239 6239 6239 9037 9037 9037 9037
Tu kN 6239 6239 6239 9037 9037 9037 9037
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.06 0.06 0.06 0.09 0.09 0.09 0.09
xu/d 0.04 0.04 0.04 0.06 0.06 0.06 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.50 1.50 1.56 1.48 1.48 1.48 1.48
MRD = Tu*z kNm 9375.44 9375.44 9708.00 13402.00 13402.00 13402.00 13379.62
MED kNm 5707.86 2115.89 2498.01 4264.76 8508.56 10802.12 11070.22
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 4682.77 2142.73 2332.53 3867.11 6591.35 7753.59 7935.92
MRD/z 6239.48 6239.48 6239.48 9036.86 9036.86 9036.86 9036.86
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
Dia of bar mm 12 12 16 16 16 16 16
Basic anchorage length mm 434.78 434.78 579.71 579.71 579.71 579.71 579.71
lb,min mm 130.43 130.43 173.91 173.91 173.91 173.91 173.91
lbd mm 304.35 304.35 405.80 405.80 405.80 405.80 405.80
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations 5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 0
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.60 m
C/C distance between Main Bars = 154 mm
Reinforcement at Different Sections
5*L/8 =11.86 6*L/8 =14.23 7*L/8 =16.60 L-d =17.37 L-0.5*d =18.17 L =18.97 0
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 16 32 0.048 16 32 20 35 20 35 20 35 20 35 25 38 0.053
Layer-2 16 32 0.084 16 32 0 0 0 0 20 35 20 35 0 0 0.085
Layer-3 0 0 0.112 0 0 0 0 0 0 0 0 0 0 0 0 0.105
Layer-4 0 0 0.132 0 0 0 0 0 0 0 0 0 0 0 0 0.125
Layer-5 0 0 0.152 0 0 0 0 0 0 0 0 0 0 0 0 0.145
Layer-6 0 0 0.172 0 0 0 0 0 0 0 0 0 0 0 0 0.165
Layer-7 0 0 0.192 0 0 0 0 0 0 0 0 0 0 0 0 0.185
Bar 1 12 35 12 35 0 0 0 0 0 0 0 0 0 0
Bar 2 12 35 12 35 12 32 12 32 12 32 12 32 10 32
Total Ast = 0.021 m2 0.021 m2 0.015 m2 0.015 m2 0.026 m2 0.026 m2 0.021 m2
deff = 1.559 m 1.559 m 1.564 m 1.564 m 1.543 m 1.543 m 1.554 m
dast_o = 1.552 m 1.552 m 1.550 m 1.550 m 1.550 m 1.550 m 1.548 m
hcef1 = (h-d)*2.5 = 0.102 m 0.102 m 0.090 m 0.090 m 0.142 m 0.142 m 0.116 m
Reinforcement provided
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 0
Dist. From c/L brg. m
Dia of bars mm 16 16 20 20 20 20 25
Nos. Nos. 64 64 35 35 70 70 38
Ast m2 0.021 0.021 0.015 0.015 0.026 0.026 0.021
deff m 1.559 1.559 1.564 1.564 1.543 1.543 1.554
dast_o w.r.t Composite section m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
deff m 1.559 1.559 1.564 1.564 1.543 1.543 1.554
w.r.t Precast section
dast_o m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =0.00
Dist. From c/L brg. m
d m 1.559 1.559 1.564 1.564 1.543 1.543 1.554
bt m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
As, min m2 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.021 0.021 0.015 0.015 0.026 0.026 0.021
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =0.00
Dist. From c/L brg. m
Ast m2 0.021 0.021 0.015 0.015 0.026 0.026 0.021
deff m 1.559 1.559 1.564 1.564 1.543 1.543 1.554
λxu m 0.068 0.068 0.048 0.048 0.084 0.084 0.069
CArea m2 0.578 0.578 0.406 0.406 0.712 0.712 0.589
x1 m 0.034 0.034 0.024 0.024 0.042 0.042 0.035
Cu kN 9036.86 9036.86 6354.21 6354.21 11134.90 11134.90 9202.82
Tu kN 9036.86 9036.86 6354.21 6354.21 11134.90 11134.90 9202.82
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.09 0.09 0.06 0.06 0.10 0.10 0.09
xu/d 0.05 0.05 0.04 0.04 0.07 0.07 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.53 1.53 1.54 1.54 1.50 1.50 1.52
MRD = Tu*z kNm 13782.44 13782.44 9785.34 9785.34 16718.26 16718.26 13980.06
MED kNm 9227.72 5615.72 5381.47 7225.00 7837.25 12734.70 0.00
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 6934.54 4416.69 4221.54 5683.04 6073.96 8951.52 458.87
MRD/z 9036.86 9036.86 6354.21 6354.21 11134.90 11134.90 9202.82
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =0.00
Dist. From c/L brg. m
Dia of bar mm 16 16 20 20 20 20 25
Basic anchorage length mm 579.71 579.71 724.64 724.64 724.64 724.64 905.80
lb,min mm 173.91 173.91 217.39 217.39 217.39 217.39 271.74
lbd mm 405.80 405.80 507.25 507.25 507.25 507.25 634.06
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
ULS 1(all) kNm -12271 -7922 -6900 -5403 5384 8718 9895
ULS 2(all) kNm -12271 -7922 -6900 -5403 5384 8718 9895
ULS 3(all) kNm -9395 -6002 -5042 -3642 2091 4477 5319
ULS 4(all) kNm 0 0 0 0 0 0 0
Max Moment (Midas) 12271 7922 6900 5403 5384 8718 9895
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.6 m
C/C distance between Main Bars = 150 mm
Reinforcement at Different Sections
L/2 =0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2L/8 =5.00 3L/8 =7.50 L/2 =10.00
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 20 35 0.050 20 35 20 35 20 35 16 32 16 32 16 32 0.048
Layer-2 20 35 0.220 20 35 0 0 0 0 12 32 12 32 12 32 0.212
Layer-3 0 0 0.250 0 0 0 0 0 0 0 0 0 0 0 0 0.238
Layer-4 0 0 0.270 0 0 0 0 0 0 0 0 0 0 0 0 0.258
Layer-5 0 0 0.290 0 0 0 0 0 0 0 0 0 0 0 0 0.278
Layer-6 0 0 0.310 0 0 0 0 0 0 0 0 0 0 0 0 0.298
Layer-7 0 0 0.330 0 0 0 0 0 0 0 0 0 0 0 0 0.318
Bar 1 0 0 0 0 0 0 0 0 12 35 12 35 12 35
Bar 2 12 32 12 32 12 32 12 32 12 35 12 35 12 35
Total Ast = 0.026 m2 0.026 m2 0.015 m2 0.015 m2 0.018 m2 0.018 m2 0.018 m2
deff = 1.484 m 1.484 m 1.562 m 1.562 m 1.538 m 1.538 m 1.540 m
dast_o = 1.550 m 1.550 m 1.550 m 1.550 m 1.552 m 1.552 m 1.552 m
hcef1 = (h-d)*2.5 = 0.290 m 0.290 m 0.094 m 0.094 m 0.156 m 0.156 m 0.150 m
Reinforcement provided
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Dia of bars mm 20 20 20 20 16 16 16
Nos. Nos. 70 70 35 35 64 64 64
Ast m2 0.026 0.026 0.015 0.015 0.018 0.018 0.018
deff m 1.484 1.484 1.562 1.562 1.538 1.538 1.540
dast_o w.r.t Composite section m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
deff m 1.484 1.484 1.562 1.562 1.538 1.538 1.540
w.r.t Precast section
dast_o m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
d m 1.484 1.484 1.562 1.562 1.538 1.538 1.540
bt m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
As, min m2 0.0033 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.026 0.026 0.015 0.015 0.018 0.018 0.018
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Ast m2 0.026 0.026 0.015 0.015 0.018 0.018 0.018
deff m 1.484 1.484 1.562 1.562 1.538 1.538 1.540
λxu m 0.084 0.084 0.048 0.048 0.059 0.059 0.059
CArea m2 0.712 0.712 0.406 0.406 0.500 0.500 0.500
x1 m 0.042 0.042 0.024 0.024 0.029 0.029 0.029
Cu kN 11134.90 11134.90 6354.21 6354.21 7813.00 7813.00 7813.00
Tu kN 11134.90 11134.90 6354.21 6354.21 7813.00 7813.00 7813.00
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.10 0.10 0.06 0.06 0.07 0.07 0.07
xu/d 0.07 0.07 0.04 0.04 0.05 0.05 0.05
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.44 1.44 1.54 1.54 1.51 1.51 1.51
MRD = Tu*z kNm 16058.53 16058.53 9775.78 9775.78 11785.08 11785.08 11803.26
MED kNm 12271.02 7921.81 6900.15 5402.92 5384.43 8717.65 9895.26
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 9392.78 6227.52 5212.09 4503.29 4423.75 6249.24 7008.90
MRD/z 11134.90 11134.90 6354.21 6354.21 7813.00 7813.00 7813.00
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10
Dist. From c/L brg. m
Dia of bar mm 20 20 20 20 16 16 16
Basic anchorage length mm 724.64 724.64 724.64 724.64 579.71 579.71 579.71
lb,min mm 217.39 217.39 217.39 217.39 173.91 173.91 173.91
lbd mm 507.25 507.25 507.25 507.25 405.80 405.80 405.80
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations 5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.60 m
C/C distance between Main Bars = 156 mm
Reinforcement at Different Sections
5*L/8 =12.50 6*L/8 =15.00 7*L/8 =17.50 L-d =18.40 L-0.5*d =19.20 L =20.00 0
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 16 32 0.048 16 32 20 35 20 35 20 35 20 35 25 38 0.053
Layer-2 12 32 0.218 12 32 0 0 0 0 16 35 16 35 0 0 0.221
Layer-3 0 0 0.244 0 0 0 0 0 0 0 0 0 0 0 0 0.241
Layer-4 0 0 0.264 0 0 0 0 0 0 0 0 0 0 0 0 0.261
Layer-5 0 0 0.284 0 0 0 0 0 0 0 0 0 0 0 0 0.281
Layer-6 0 0 0.304 0 0 0 0 0 0 0 0 0 0 0 0 0.301
Layer-7 0 0 0.324 0 0 0 0 0 0 0 0 0 0 0 0 0.321
Bar 1 12 35 12 35 0 0 0 0 0 0 0 0 0 0
Bar 2 12 35 12 35 12 32 12 32 12 32 12 32 10 32
Total Ast = 0.018 m2 0.018 m2 0.015 m2 0.015 m2 0.022 m2 0.022 m2 0.021 m2
deff = 1.539 m 1.539 m 1.564 m 1.564 m 1.505 m 1.505 m 1.554 m
dast_o = 1.552 m 1.552 m 1.550 m 1.550 m 1.550 m 1.550 m 1.548 m
hcef1 = (h-d)*2.5 = 0.153 m 0.153 m 0.090 m 0.090 m 0.238 m 0.238 m 0.116 m
Reinforcement provided
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Dist. From c/L brg. m
Dia of bars mm 16 16 20 20 20 20 25
Nos. Nos. 64 64 35 35 70 70 38
Ast m2 0.018 0.018 0.015 0.015 0.022 0.022 0.021
deff m 1.539 1.539 1.564 1.564 1.505 1.505 1.554
dast_o w.r.t Composite section m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
deff m 1.539 1.539 1.564 1.564 1.505 1.505 1.554
w.r.t Precast section
dast_o m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
d m 1.539 1.539 1.564 1.564 1.505 1.505 1.554
bt m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
As, min m2 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.018 0.018 0.015 0.015 0.022 0.022 0.021
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Ast m2 0.018 0.018 0.015 0.015 0.022 0.022 0.021
deff m 1.539 1.539 1.564 1.564 1.505 1.505 1.554
λxu m 0.059 0.059 0.048 0.048 0.071 0.071 0.069
CArea m2 0.500 0.500 0.406 0.406 0.602 0.602 0.589
x1 m 0.029 0.029 0.024 0.024 0.035 0.035 0.035
Cu kN 7813.00 7813.00 6354.21 6354.21 9413.85 9413.85 9202.82
Tu kN 7813.00 7813.00 6354.21 6354.21 9413.85 9413.85 9202.82
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.07 0.07 0.06 0.06 0.09 0.09 0.09
xu/d 0.05 0.05 0.04 0.04 0.06 0.06 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.51 1.51 1.54 1.54 1.47 1.47 1.52
MRD = Tu*z kNm 11793.82 11793.82 9785.34 9785.34 13832.23 13832.23 13980.06
MED kNm 8814.82 5718.65 4519.64 5930.53 6897.24 11128.60 0.00
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 6723.64 4522.99 3661.90 4842.47 5548.18 8043.63 458.87
MRD/z 7813.00 7813.00 6354.21 6354.21 9413.85 9413.85 9202.82
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Dia of bar mm 16 16 20 20 20 20 25
Basic anchorage length mm 579.71 579.71 724.64 724.64 724.64 724.64 905.80
lb,min mm 173.91 173.91 217.39 217.39 217.39 217.39 271.74
lbd mm 405.80 405.80 507.25 507.25 507.25 507.25 634.06
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
ULS 1(all) kNm -11084 -6881 -5924 -4527 5719 8815 9895
ULS 2(all) kNm -11084 -6881 -5924 -4527 5719 8815 9895
ULS 3(all) kNm -8402 -5167 -4255 -2928 2373 4618 5319
ULS 4(all) kNm 0 0 0 0 0 0 0
Max Moment (Midas) 11084 6881 5924 4527 5719 8815 9895
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.6 m
C/C distance between Main Bars = 152 mm
Reinforcement at Different Sections
L/2 =0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2L/8 =5.00 3L/8 =7.50 L/2 =10.00
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 20 35 0.050 20 35 20 35 20 35 16 32 16 32 16 32 0.048
Layer-2 16 35 0.220 16 35 0 0 0 0 12 32 12 32 12 32 0.214
Layer-3 0 0 0.248 0 0 0 0 0 0 0 0 0 0 0 0 0.240
Layer-4 0 0 0.268 0 0 0 0 0 0 0 0 0 0 0 0 0.260
Layer-5 0 0 0.288 0 0 0 0 0 0 0 0 0 0 0 0 0.280
Layer-6 0 0 0.308 0 0 0 0 0 0 0 0 0 0 0 0 0.300
Layer-7 0 0 0.328 0 0 0 0 0 0 0 0 0 0 0 0 0.320
Bar 1 0 0 0 0 0 0 0 0 12 35 12 35 12 35
Bar 2 12 32 12 32 12 32 12 32 12 35 12 35 12 35
Total Ast = 0.022 m2 0.022 m2 0.015 m2 0.015 m2 0.018 m2 0.018 m2 0.018 m2
deff = 1.503 m 1.503 m 1.562 m 1.562 m 1.538 m 1.538 m 1.540 m
dast_o = 1.550 m 1.550 m 1.550 m 1.550 m 1.552 m 1.552 m 1.552 m
hcef1 = (h-d)*2.5 = 0.242 m 0.242 m 0.094 m 0.094 m 0.156 m 0.156 m 0.151 m
Reinforcement provided
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Dia of bars mm 20 20 20 20 16 16 16
Nos. Nos. 70 70 35 35 64 64 64
Ast m2 0.022 0.022 0.015 0.015 0.018 0.018 0.018
deff m 1.503 1.503 1.562 1.562 1.538 1.538 1.540
dast_o w.r.t Composite section m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
deff m 1.503 1.503 1.562 1.562 1.538 1.538 1.540
w.r.t Precast section
dast_o m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
d m 1.503 1.503 1.562 1.562 1.538 1.538 1.540
bt m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
As, min m2 0.0034 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.022 0.022 0.015 0.015 0.018 0.018 0.018
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Ast m2 0.022 0.022 0.015 0.015 0.018 0.018 0.018
deff m 1.503 1.503 1.562 1.562 1.538 1.538 1.540
λxu m 0.071 0.071 0.048 0.048 0.059 0.059 0.059
CArea m2 0.602 0.602 0.406 0.406 0.500 0.500 0.500
x1 m 0.035 0.035 0.024 0.024 0.029 0.029 0.029
Cu kN 9413.85 9413.85 6354.21 6354.21 7813.00 7813.00 7813.00
Tu kN 9413.85 9413.85 6354.21 6354.21 7813.00 7813.00 7813.00
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.09 0.09 0.06 0.06 0.07 0.07 0.07
xu/d 0.06 0.06 0.04 0.04 0.05 0.05 0.05
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.47 1.47 1.54 1.54 1.51 1.51 1.51
MRD = Tu*z kNm 13816.55 13816.55 9775.78 9775.78 11785.08 11785.08 11800.11
MED kNm 11083.77 6880.99 5924.38 4527.25 5718.71 8814.91 9895.37
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 8436.00 5422.91 4577.84 3934.11 4645.36 6313.72 7010.72
MRD/z 9413.85 9413.85 6354.21 6354.21 7813.00 7813.00 7813.00
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10
Dist. From c/L brg. m
Dia of bar mm 20 20 20 20 16 16 16
Basic anchorage length mm 724.64 724.64 724.64 724.64 579.71 579.71 579.71
lb,min mm 217.39 217.39 217.39 217.39 173.91 173.91 173.91
lbd mm 507.25 507.25 507.25 507.25 405.80 405.80 405.80
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations 5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.60 m
C/C distance between Main Bars = 156 mm
Reinforcement at Different Sections
5*L/8 =12.50 6*L/8 =15.00 7*L/8 =17.50 L-d =18.40 L-0.5*d =19.20 L =20.00 0
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 16 32 0.048 16 32 20 35 20 35 20 35 20 35 25 38 0.053
Layer-2 12 32 0.218 12 32 0 0 0 0 20 35 20 35 0 0 0.221
Layer-3 0 0 0.244 0 0 0 0 0 0 0 0 0 0 0 0 0.241
Layer-4 0 0 0.264 0 0 0 0 0 0 0 0 0 0 0 0 0.261
Layer-5 0 0 0.284 0 0 0 0 0 0 0 0 0 0 0 0 0.281
Layer-6 0 0 0.304 0 0 0 0 0 0 0 0 0 0 0 0 0.301
Layer-7 0 0 0.324 0 0 0 0 0 0 0 0 0 0 0 0 0.321
Bar 1 12 35 12 35 0 0 0 0 0 0 0 0 0 0
Bar 2 12 35 12 35 12 32 12 32 12 32 12 32 10 32
Total Ast = 0.018 m2 0.018 m2 0.015 m2 0.015 m2 0.026 m2 0.026 m2 0.021 m2
deff = 1.539 m 1.539 m 1.564 m 1.564 m 1.486 m 1.486 m 1.554 m
dast_o = 1.552 m 1.552 m 1.550 m 1.550 m 1.550 m 1.550 m 1.548 m
hcef1 = (h-d)*2.5 = 0.153 m 0.153 m 0.090 m 0.090 m 0.286 m 0.286 m 0.116 m
Reinforcement provided
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Dist. From c/L brg. m
Dia of bars mm 16 16 20 20 20 20 25
Nos. Nos. 64 64 35 35 70 70 38
Ast m2 0.018 0.018 0.015 0.015 0.026 0.026 0.021
deff m 1.539 1.539 1.564 1.564 1.486 1.486 1.554
dast_o w.r.t Composite section m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
deff m 1.539 1.539 1.564 1.564 1.486 1.486 1.554
w.r.t Precast section
dast_o m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
d m 1.539 1.539 1.564 1.564 1.486 1.486 1.554
bt m 1.552 1.552 1.550 1.550 1.550 1.550 1.548
As, min m2 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.018 0.018 0.015 0.015 0.026 0.026 0.021
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Ast m2 0.018 0.018 0.015 0.015 0.026 0.026 0.021
deff m 1.539 1.539 1.564 1.564 1.486 1.486 1.554
λxu m 0.059 0.059 0.048 0.048 0.084 0.084 0.069
CArea m2 0.500 0.500 0.406 0.406 0.712 0.712 0.589
x1 m 0.029 0.029 0.024 0.024 0.042 0.042 0.035
Cu kN 7813.00 7813.00 6354.21 6354.21 11134.90 11134.90 9202.82
Tu kN 7813.00 7813.00 6354.21 6354.21 11134.90 11134.90 9202.82
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.07 0.07 0.06 0.06 0.10 0.10 0.09
xu/d 0.05 0.05 0.04 0.04 0.07 0.07 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.51 1.51 1.54 1.54 1.44 1.44 1.52
MRD = Tu*z kNm 11793.82 11793.82 9785.34 9785.34 16077.65 16077.65 13980.06
MED kNm 8717.79 5384.59 5635.90 7141.37 8168.11 12507.69 0.00
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 6659.36 4301.69 4386.75 5628.74 6511.09 9132.25 458.87
MRD/z 7813.00 7813.00 6354.21 6354.21 11134.90 11134.90 9202.82
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Dia of bar mm 16 16 20 20 20 20 25
Basic anchorage length mm 579.71 579.71 724.64 724.64 724.64 724.64 905.80
lb,min mm 173.91 173.91 217.39 217.39 217.39 217.39 271.74
lbd mm 405.80 405.80 507.25 507.25 507.25 507.25 634.06
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
ULS 1(all) kNm -13258 -8326 -7710 -5845 5618 9231 11074
ULS 2(all) kNm -13258 -8326 -7710 -5845 5618 9231 11074
ULS 3(all) kNm -10003 -6305 -5718 -3951 2364 5170 6588
ULS 4(all) kNm 0 0 0 0 0 0 0
Max Moment (Midas) 13258 8326 7710 5845 5618 9231 11074
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.6 m
C/C distance between Main Bars = 160 mm
Reinforcement at Different Sections
L/2 =0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2L/8 =5.00 3L/8 =7.50 L/2 =10.00
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 20 35 0.050 20 35 20 35 20 35 16 32 16 32 16 32 0.048
Layer-2 20 35 0.230 20 35 0 0 0 0 16 32 16 32 16 32 0.224
Layer-3 0 0 0.260 0 0 0 0 0 0 0 0 0 0 0 0 0.252
Layer-4 0 0 0.280 0 0 0 0 0 0 0 0 0 0 0 0 0.272
Layer-5 0 0 0.300 0 0 0 0 0 0 0 0 0 0 0 0 0.292
Layer-6 0 0 0.320 0 0 0 0 0 0 0 0 0 0 0 0 0.312
Layer-7 0 0 0.340 0 0 0 0 0 0 0 0 0 0 0 0 0.332
Bar 1 0 0 0 0 0 0 0 0 12 35 12 35 12 35
Bar 2 12 32 12 32 12 32 12 32 32 12 32 32 12 32
Total Ast = 0.026 m2 0.026 m2 0.015 m2 0.015 m2 0.026 m2 0.043 m2 0.020 m2
deff = 1.480 m 1.480 m 1.562 m 1.562 m 1.532 m 1.558 m 1.514 m
dast_o = 1.550 m 1.550 m 1.550 m 1.550 m 1.552 m 1.552 m 1.552 m
hcef1 = (h-d)*2.5 = 0.301 m 0.301 m 0.094 m 0.094 m 0.170 m 0.106 m 0.214 m
Reinforcement provided
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Dia of bars mm 20 20 20 20 16 16 16
Nos. Nos. 70 70 35 35 64 64 64
Ast m2 0.026 0.026 0.015 0.015 0.026 0.043 0.020
deff m 1.480 1.480 1.562 1.562 1.532 1.558 1.514
dast_o w.r.t Composite section m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
deff m 1.480 1.480 1.562 1.562 1.532 1.558 1.514
w.r.t Precast section
dast_o m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
d m 1.480 1.480 1.562 1.562 1.532 1.558 1.514
bt m 1.550 1.550 1.550 1.550 1.552 1.552 1.552
As, min m2 0.0033 0.0034 0.0034 0.0034 0.0034 0.0034 0.0034
As, provided m2 0.026 0.026 0.015 0.015 0.026 0.043 0.020
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10.0
Dist. From c/L brg. m
Ast m2 0.026 0.026 0.015 0.015 0.026 0.043 0.020
deff m 1.480 1.480 1.562 1.562 1.532 1.558 1.514
λxu m 0.084 0.084 0.048 0.048 0.087 0.139 0.067
CArea m2 0.712 0.712 0.406 0.406 0.736 1.184 0.569
x1 m 0.042 0.042 0.024 0.024 0.043 0.070 0.033
Cu kN 11134.90 11134.90 6354.21 6354.21 11511.89 18505.35 8889.34
Tu kN 11134.90 11134.90 6354.21 6354.21 11511.89 18505.35 8889.34
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.10 0.10 0.06 0.06 0.11 0.17 0.08
xu/d 0.07 0.07 0.04 0.04 0.07 0.11 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.44 1.44 1.54 1.54 1.49 1.49 1.48
MRD = Tu*z kNm 16010.72 16010.72 9775.78 9775.78 17137.11 27536.76 13164.73
MED kNm 13258.05 8326.42 7709.56 5845.41 5617.87 9230.73 11074.09
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 10104.63 6525.31 5738.20 4790.91 4627.92 6673.07 7936.53
MRD/z 11134.90 11134.90 6354.21 6354.21 11511.89 18505.35 8889.34
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.50 2*L/8 =5.00 3*L/8 =7.50 4*L/8 =10
Dist. From c/L brg. m
Dia of bar mm 20 20 20 20 16 16 16
Basic anchorage length mm 724.64 724.64 724.64 724.64 579.71 579.71 579.71
lb,min mm 217.39 217.39 217.39 217.39 173.91 173.91 173.91
lbd mm 507.25 507.25 507.25 507.25 405.80 405.80 405.80
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
fcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (Es / Ecm) = 6.25
A) Summary of Loads
Bending Moment
Load Combinations 5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Ast
0.00 Tu
0.21
4.8
Clear Cover = 40 mm
Dia of spacer Bar = 20 mm
Total Depth = 1.60 m
C/C distance between Main Bars = 154 mm
Reinforcement at Different Sections
5*L/8 =12.50 6*L/8 =15.00 7*L/8 =17.50 L-d =18.40 L-0.5*d =19.20 L =20.00 0
Layer Dia. y from Dia. Dia. Dia. Dia. Dia. Dia. y from
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(mm) bottom (m) (mm) (mm) (mm) (mm) (mm) (mm) bottom (m)
Layer-1 16 32 0.048 16 32 16 32 16 32 12 35 12 35 25 38 0.053
Layer-2 16 32 0.218 16 32 16 32 0 0 12 35 12 35 0 0 0.219
Layer-3 0 0 0.246 0 0 0 0 0 0 0 0 0 0 0 0 0.239
Layer-4 0 0 0.266 0 0 0 0 0 0 0 0 0 0 0 0 0.259
Layer-5 0 0 0.286 0 0 0 0 0 0 0 0 0 0 0 0 0.279
Layer-6 0 0 0.306 0 0 0 0 0 0 0 0 0 0 0 0 0.299
Layer-7 0 0 0.326 0 0 0 0 0 0 0 0 0 0 0 0 0.319
Bar 1 12 35 12 35 12 35 12 35 0 0 0 0 0 0
Bar 2 12 35 12 35 12 35 12 35 16 32 16 32 10 32
Total Ast = 0.021 m2 0.021 m2 0.021 m2 0.014 m2 0.014 m2 0.014 m2 0.021 m2
deff = 1.518 m 1.518 m 1.518 m 1.578 m 1.527 m 1.527 m 1.554 m
dast_o = 1.552 m 1.552 m 1.552 m 1.552 m 1.554 m 1.554 m 1.548 m
hcef1 = (h-d)*2.5 = 0.206 m 0.206 m 0.206 m 0.054 m 0.183 m 0.183 m 0.116 m
Reinforcement provided
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 0
Dist. From c/L brg. m
Dia of bars mm 16 16 16 16 12 12 25
Nos. Nos. 64 64 64 32 70 70 38
Ast m2 0.021 0.021 0.021 0.014 0.014 0.014 0.021
deff m 1.518 1.518 1.518 1.578 1.527 1.527 1.554
dast_o w.r.t Composite section m 1.552 1.552 1.552 1.552 1.554 1.554 1.548
deff m 1.518 1.518 1.518 1.578 1.527 1.527 1.554
w.r.t Precast section
dast_o m 1.552 1.552 1.552 1.552 1.554 1.554 1.548
Check for Minimum & Maximum reinforcement percentage at Support (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site development and Beautification of
proposed lake.
Check for Minimum & Maximum reinforcement percentage at Mid (IRC 112/Clause 16.5.1.1)
As,max = 0.025Ac
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
d m 1.518 1.518 1.518 1.578 1.527 1.527 1.554
bt m 1.552 1.552 1.552 1.552 1.554 1.554 1.548
As, min m2 0.0034 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
As, provided m2 0.021 0.021 0.021 0.014 0.014 0.014 0.021
Check Asmin < Asprovided OK OK OK OK OK OK OK
Ac m2 8.513 8.513 8.513 5.485 5.485 5.485 5.485
As,max m2 0.213 0.213 0.213 0.137 0.137 0.137 0.137
check Asmax > Asprovided OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Ast m2 0.021 0.021 0.021 0.014 0.014 0.014 0.021
deff m 1.518 1.518 1.518 1.578 1.527 1.527 1.554
λxu m 0.068 0.068 0.068 0.047 0.047 0.047 0.069
CArea m2 0.578 0.578 0.578 0.399 0.399 0.399 0.589
x1 m 0.034 0.034 0.034 0.023 0.023 0.023 0.035
Cu kN 9036.86 9036.86 9036.86 6239.48 6239.48 6239.48 9202.82
Tu kN 9036.86 9036.86 9036.86 6239.48 6239.48 6239.48 9202.82
Check (C-T =Zero) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xu m 0.09 0.09 0.09 0.06 0.06 0.06 0.09
xu/d 0.06 0.06 0.06 0.04 0.04 0.04 0.06
xu,max/d 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Check ( xu/d < xu,max/d ) UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK UR ,OK
z =(d-x1) m 1.48 1.48 1.48 1.56 1.50 1.50 1.52
MRD = Tu*z kNm 13407.59 13407.59 13407.59 9702.40 9378.88 9378.88 13980.06
MED kNm 10806.86 8514.17 4271.24 2506.91 0.00 5700.53 0.00
Check MED < MRD OK OK OK OK OK OK OK
Additional Tensile force due to shear
DFd kN 884.12 734.58 727.02 991.42 854.10 469.81 458.87
MED/z +DFD kN 8168.06 6473.22 3605.89 2603.57 854.10 4262.19 458.87
MRD/z 9036.86 9036.86 9036.86 6239.48 6239.48 6239.48 9202.82
Check MRD > MED/z +DFD OK OK OK OK OK OK OK
Section At unit
5*L/8 =13 6*L/8 =15 7*L/8 =18 L-d =18 L-0.5*d =19 L =20 4*L/8 =0.00
Dist. From c/L brg. m
Dia of bar mm 16 16 16 16 12 12 25
Basic anchorage length mm 579.71 579.71 579.71 579.71 434.78 434.78 905.80
lb,min mm 173.91 173.91 173.91 173.91 130.43 130.43 271.74
lbd mm 405.80 405.80 405.80 405.80 304.35 304.35 634.06
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at Motihari town including approaches site
development and Beautification of proposed lake.
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 1768.24 1469.16 1454.05 1982.83 1708.20 939.61 917.74
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 30919.54 30919.54 31999.43 22411.99 14087.54 14087.54 14064.54
Check (OK/Revise) OK OK OK OK OK OK OK
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 1768.24 1469.16 1454.05 1982.83 1708.20 939.61 917.74
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 3701.34 3075.30 2940.96 4175.27 3596.97 1978.55 1935.65
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 1768.24 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations 5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 1687.00 2462.82 2582.28 1917.13 2129.94 1817.73 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 14171.46 14171.46 23332.92 30736.44 30736.44 30736.44 14064.54
Check (OK/Revise) OK OK OK OK OK OK #REF!
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 1687.00 2462.82 2582.28 1917.13 2129.94 1817.73 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 3531.29 5155.27 5222.91 4036.93 4485.02 3827.61 #REF!
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 1687.00 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 3.052 m
0.75av = 2.289 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 2026.85 1711.22 1703.30 2287.27 2152.37 1292.92 508.27
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 30919.54 30919.54 31999.43 22411.99 14087.54 14087.54 14064.54
Check (OK/Revise) OK OK OK OK OK OK OK
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 2026.85 1711.22 1703.30 2287.27 2152.37 1292.92 508.27
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 4242.68 3581.98 3445.09 4816.32 4532.26 2722.51 1072.02
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 2026.85 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations 5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 595.36 2017.07 2253.89 1640.77 1671.85 1947.27 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 14171.46 14171.46 23332.92 30736.44 30736.44 30736.44 14064.54
Check (OK/Revise) OK OK OK OK OK OK #REF!
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 595.36 2017.07 2253.89 1640.77 1671.85 1947.27 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 1246.23 4222.21 4558.72 3454.98 3520.42 4100.38 #REF!
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 595.36 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 1947.28 1671.85 1627.21 2262.76 2031.45 1190.73 508.26
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 30919.54 30919.54 31999.43 22411.99 14087.54 14087.54 14064.54
Check (OK/Revise) OK OK OK OK OK OK OK
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 1947.28 1671.85 1627.21 2262.76 2031.45 1190.73 508.26
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 4076.11 3499.58 3291.19 4764.71 4277.64 2507.33 1072.00
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 1947.28 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations 5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 630.43 2152.36 2293.28 1726.95 1711.21 2026.85 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 14171.46 14171.46 23332.92 30736.44 30736.44 30736.44 14064.54
Check (OK/Revise) OK OK OK OK OK OK #REF!
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 630.43 2152.36 2293.28 1726.95 1711.21 2026.85 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 1319.63 4505.40 4638.38 3636.45 3603.31 4267.95 #REF!
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 630.43 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 2142.50 1871.57 1873.06 2612.41 2520.33 1712.12 956.87
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 30919.54 30919.54 31999.43 22411.99 14087.54 14087.54 14064.54
Check (OK/Revise) OK OK OK OK OK OK OK
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
L = 0.00 0.5*d =0.80 d =1.60 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 2142.50 1871.57 1873.06 2612.41 2520.33 1712.12 956.87
bw m 4.800 4.800 4.800 3.500 2.200 2.200 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 4484.77 3917.64 3788.45 5500.97 5307.08 3605.23 2018.18
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 2142.50 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Design Parameters
Design Yield strength of steel fyd = 434.78 Mpa
fywd = 347.83 Mpa
Concrete Characteristic Strength fck = 35 Mpa
fcd = 0.447*fck = 15.63 Mpa
Using Rectangular stress block
Effective height factor λ = 0.8
Compression zone factor η = 1.0
hfcd = 15.63 Mpa
Limiting value of xu,max/d = 0.464
Modular ratio (EcmP / EcmD) = 6.25
(Precast Beam / Cast insitu deck)
Reduction factor for section b/w 0.5d≤ av≤ 2d β = av/2d ( Refer IRC 112 Cl 10.3.3.3(7))
A) Summary of Loads
Shear Force
Load Combinations 5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
ρ1 = Min Ast/ bw d
0.02
Vccd = 0 kN
Vtd = 0 kN
Variation of θ 45 ˚ ≥ θ ≥ 21.8 ˚
Considering θ = 45 ˚ For maximum capacity of the section
VRdmax = αcw x bw x z x v1 x fcd / ( cotθ + tan θ) ( IRC 112 / clause 10.3.2 Eq 10.1 )
v1 = 0.6
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From c/L brg. m
VNS kN 461.95 1680.54 1982.53 1473.15 0.00 1768.05 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
VRdmax kN 14171.46 14171.46 23332.92 30736.44 30736.44 30736.44 14064.54
Check (OK/Revise) OK OK OK OK OK OK #REF!
VRdmax = VNS
θ = 0.5 Sin-1{2 x VNS/(αcw x bw x z x v1 x fcd)}
Shear Reinforcement
Section At unit
5*L/8 =12 6*L/8 =14 7*L/8 =17 L-d =17 L-0.5*d =18 L =19 4*L/8 =9.49
Dist. From C/L brg. m
VNS kN 461.95 1680.54 1982.53 1473.15 0.00 1768.05 #REF!
bw m 2.200 2.200 3.500 4.800 4.800 4.800 2.200
z m 1.373 1.373 1.421 1.365 1.365 1.365 1.363
θdesign deg 45 45 45 45 45 45 45
Asw/s mm2/m 966.97 3517.77 4009.86 3102.03 0.00 3723.00 #REF!
Check for Shear Reinforcement within 0.75av support region ( IRC 112 / clause 10.3.3.3 (7)& (8))
Check required if β factor is considered for calculation of shear reinforcement
VED = 461.95 kN
Asw provided within central 0.75 av zone.
β = av/2d
av = β*2d
av = 1.526 m
0.75av = 1.145 m
VED ≤ Asw*fywd
Span1
SLS3(max) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
SLS1(min) 0.00 -0.01 0.00 0.00 0.00 0.00 0.00 -0.01 0.00
SLS2(min) -0.04 -0.07 -0.06 -0.06 -0.06 -0.06 -0.06 -0.06 -0.04
SLS3(min) -0.03 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.03
SLS1(max) 0.30 -0.77 -1.28 -1.39 -1.13 -0.49 0.52 1.85 2.46
Stress at Slab
Top (N/mm )
2
SLS2(max) 1.64 0.49 -0.03 -0.13 0.15 0.82 1.85 3.23 3.95
SLS3(max) 1.20 0.21 -0.36 -0.50 -0.27 0.33 1.31 2.63 3.30
SLS1(min) 0.05 -1.20 -2.10 -2.45 -2.27 -1.54 -0.35 1.22 1.95
SLS2(min) -2.16 -3.40 -4.35 -4.80 -4.71 -4.08 -2.98 -1.53 -0.93
SLS3(min) -1.76 -2.67 -3.26 -3.50 -3.37 -2.87 -1.99 -0.82 -0.34
SLS1(max) -0.05 1.51 2.71 3.16 2.93 1.98 0.44 -1.58 -2.31
Stress at Slab
SLS2(max) 0.89 2.28 3.39 3.82 3.55 2.58 1.00 -0.98 -1.55
(N/mm )
Bottom
2
SLS3(max) 0.69 1.71 2.39 2.57 2.27 1.49 0.24 -1.36 -1.82
SLS1(min) -0.37 0.98 1.67 1.82 1.48 0.65 -0.66 -2.34 -2.90
SLS2(min) -1.19 0.24 1.07 1.40 1.25 0.60 -0.61 -2.23 -2.80
SLS3(min) -0.77 0.45 1.32 1.68 1.56 0.96 -0.20 -1.77 -2.36
Span2
SLS3(max) 0.03 0.04 0.05 0.05 0.05 0.05 0.05 0.04 0.03
SLS1(min) 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.02 0.02
SLS2(min) -0.05 -0.07 -0.07 -0.07 -0.07 -0.07 -0.07 -0.07 -0.05
SLS3(min) -0.03 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.03
SLS1(max) 3.26 1.66 0.59 -0.08 -0.31 -0.13 0.49 1.48 3.06
Stress at Slab
Top (N/mm )
2
SLS2(max) 4.71 3.02 1.91 1.24 1.00 1.19 1.80 2.83 4.50
SLS3(max) 3.84 2.38 1.34 0.70 0.47 0.65 1.24 2.24 3.65
SLS1(min) 2.53 1.00 -0.29 -1.18 -1.49 -1.22 -0.42 0.83 2.29
SLS2(min) -0.32 -1.76 -2.99 -3.87 -4.17 -3.88 -3.06 -1.84 -0.44
SLS3(min) 0.26 -1.05 -2.01 -2.64 -2.86 -2.66 -2.05 -1.10 0.18
SLS1(max) -2.97 -1.23 0.42 1.57 1.98 1.63 0.60 -0.99 -2.65
Stress at Slab
SLS2(max) -2.16 -0.56 1.01 2.16 2.58 2.23 1.20 -0.31 -1.83
(N/mm )
Bottom
2
SLS3(max) -2.42 -0.95 0.27 1.10 1.40 1.17 0.40 -0.77 -2.19
SLS1(min) -3.86 -2.00 -0.67 0.19 0.50 0.26 -0.54 -1.81 -3.64
SLS2(min) -4.03 -2.19 -0.85 0.03 0.37 0.15 -0.62 -1.85 -3.72
SLS3(min) -3.24 -1.66 -0.38 0.48 0.80 0.58 -0.17 -1.37 -2.95
Span3
SLS3(max) 0.03 0.04 0.05 0.05 0.00 0.05 0.05 0.04 0.03
SLS1(min) 0.02 0.02 0.03 0.03 0.00 0.03 0.03 0.02 0.02
SLS2(min) -0.05 -0.07 -0.07 -0.07 0.00 -0.07 -0.07 -0.07 -0.05
SLS3(min) -0.03 -0.04 -0.04 -0.04 0.00 -0.04 -0.04 -0.04 -0.03
SLS1(max) 3.07 1.48 0.48 -0.14 0.00 -0.11 0.55 1.61 3.21
Stress at Slab
Top (N/mm )
2
SLS2(max) 4.49 2.83 1.80 1.20 0.00 1.26 1.94 3.05 4.75
SLS3(max) 3.65 2.24 1.25 0.65 0.00 0.71 1.36 2.41 3.87
SLS1(min) 2.29 0.82 -0.43 -1.24 0.00 -1.21 -0.33 0.96 2.48
SLS2(min) -0.44 -1.84 -3.07 -3.90 0.00 -3.90 -3.03 -1.80 -0.37
SLS3(min) 0.19 -1.11 -2.06 -2.68 0.00 -2.67 -2.05 -1.09 0.21
SLS1(max) -2.66 -0.99 0.61 1.65 0.00 1.61 0.47 -1.17 -2.91
Stress at Slab
SLS2(max) -1.82 -0.31 1.20 2.22 0.00 2.13 0.98 -0.60 -2.21
(N/mm )
Bottom
2
SLS3(max) -2.19 -0.77 0.40 1.16 0.00 1.09 0.25 -0.97 -2.44
SLS1(min) -3.64 -1.81 -0.53 0.28 0.00 0.23 -0.62 -1.94 -3.80
SLS2(min) -3.72 -1.85 -0.60 0.18 0.00 0.08 -0.80 -2.13 -3.97
SLS3(min) -2.95 -1.37 -0.16 0.60 0.00 0.52 -0.32 -1.60 -3.17
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with footpath across lake at
Motihari town including approaches site development and Beautification of proposed lake.
Span4
SLS3(max) 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01
SLS1(min) 0.00 -0.01 0.00 0.00 0.00 0.00 0.00 -0.01 0.00
SLS2(min) -0.04 -0.07 -0.06 -0.06 -0.06 -0.06 -0.06 -0.06 -0.04
SLS3(min) -0.03 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.03
SLS1(max) 3.64 1.78 0.46 -0.54 -1.17 -1.42 -1.30 -0.78 0.30
Stress at Slab
Top (N/mm )
2
SLS2(max) 5.26 3.28 0.39 0.85 0.19 -0.10 -0.02 0.50 1.64
SLS3(max) 4.33 2.66 0.08 0.36 -0.25 -0.48 -0.35 0.22 1.20
SLS1(min) 2.91 1.16 -0.41 -1.59 -2.32 -2.49 -2.13 -1.22 0.05
SLS2(min) -0.02 -1.60 -3.04 -4.13 -4.75 -4.83 -4.37 -3.41 -2.17
SLS3(min) 0.54 -0.89 -2.05 -2.92 -3.41 -3.54 -3.29 -2.68 -1.76
SLS1(max) -3.47 -1.50 0.51 2.05 2.98 3.21 2.74 1.54 -0.04
Stress at Slab
SLS2(max) -2.88 -1.04 0.94 2.53 3.51 3.78 3.37 2.26 0.88
(N/mm )
Bottom
2
SLS3(max) -3.06 -1.40 0.19 1.47 2.25 2.55 2.37 1.70 0.69
SLS1(min) -4.34 -2.26 -0.59 0.72 1.54 1.86 1.70 1.00 -0.36
SLS2(min) -4.18 -2.15 -0.54 0.67 1.30 1.44 1.10 0.26 -1.18
SLS3(min) -3.42 -1.69 -0.12 1.02 1.61 1.72 1.35 0.47 -0.76
Span1,2,3&4
Max Comp
Stress Type
Stress Check
2
(N/mm )
Axial Stress -0.1 OK
Slab Top -4.8 OK
Slab Bottom -4.3 OK
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
fct,eff = fctm
= 2.80 Mpa
Act = Area of concrete within tensile zone just before the formation of first crack.Hence section
will behave elastically untill the tensile the tensile fibre stress reaches fctm. Hence
Spacing = 75 mm
σs = fyk = 500 Mpa
8.500 1 8.500
0.000 0
1
2 0.200 2 0.200
3 0.050 3 0.050
2.200 1.600
4 1.350 1.600
4
5 0.001
6 0.210
4.800 4.800
Section At unit
0.00 deff =1 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
web width bw m 4.8 4.8 4.8 2.2 2.2 2.2
h m 1.600 1.600 1.600 1.600 1.600 1.600
Area A m2 8.513 5.485 5.485 5.485 5.485 5.485
yt m 2.605 1.799 1.799 1.799 1.799 1.799
Act = (D -yt)*bw m2 -4.823 -0.954 -0.954 -0.437 -0.437 -0.437
As.min mm2 -7022.56 -1389.6 -1389.55 -636.88 -636.88 -636.88
Ast,Provided mm2 14350.80 14350.8 20784.78 20784.78 20784.78 20784.78
Check OK/Revise OK OK OK OK OK OK
yb m 0.946 0.908 0.908 0.908 0.908 0.908
Izz m4 3.583 0.015 0.015 0.015 0.015 0.015
Iyy m4 1.786 17.558 17.558 17.558 17.558 17.558
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
Calculation of Crack Width: ( IRC: 112 /clause 12.3.4)
wk,max = 0.30 mm
wk = Sr,max(εsm - εcm)
σmax = Max Crack Spacing = 3.4c + 0.17Φ/ρp,eff
Clear cover c= 52 mm
Bar dia Φ= 20 mm
5(c + Φ/2 ) = 310 mm
Spacing between bars = 100 mm < 310 mm
2.5(h-d)
ρp,eff = As/Ac,eff Ac,eff = min (h - x/3)
h/2
αe = Es/Ecm
Es = 200000 Mpa
Ecm = 32000 Mpa
αe = 6.25
kt = 0.50 (factor dependent on duration of loads)
Section At unit
0.00 deff =1 L/8 =2.37 L/4 =4.74 3L/8 =7.11 L/2 =9.49
Dist. From c/L brg. m
Ast,Provided m 0.014 0.014 0.021 0.021 0.021 0.021
Avg.web width (bw) m 4.8 4.8 4.8 2.2 2.2 2.2
h m2 1.600 1.600 1.600 1.600 1.600 1.600
d m 1.526 1.526 1.517 1.517 1.517 1.515
yt m2 2.605 1.799 1.799 1.799 1.799 1.799
hc,eff mm2 0.185 0.185 0.207 0.207 0.207 0.214
Ac,eff mm2 0.89 0.89 1.00 0.46 0.46 0.47
ρp,eff As/Ac,eff 0.016 0.016 0.021 0.046 0.046 0.044
Smax m4 386.97 386.97 339.65 251.44 251.44 253.67
Crack Width for Load Case SLS-1 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 0.05 ###### -1.20 -2.10 -2.45 -2.32
(εsm - εcm) 0.0000002 ###### -0.0000036 -0.0000063 -0.0000074 -0.0000070
wk =Sr,max(εsm - εcm) mm 0.0001 ###### -0.0012 -0.0016 -0.0018 -0.0018
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-1 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -4.34 ###### -2.26 -0.59 0.72 1.48
(εsm - εcm) -0.0000130 ###### -0.0000068 -0.0000018 0.0000022 0.0000044
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
wk =Sr,max(εsm - εcm) mm -0.0050 ###### -0.0023 -0.0004 0.0005 0.0011
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-2 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -2.16 ###### -3.40 -4.35 -4.80 -4.75
(εsm - εcm) -0.0000065 ###### -0.0000102 -0.0000131 -0.0000144 -0.0000143
wk =Sr,max(εsm - εcm) mm -0.0025 ###### -0.0039 -0.0050 -0.0056 -0.0055
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-2 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -4.18 ###### -2.15 -0.54 0.67 1.25
(εsm - εcm) -0.0000125 ###### -0.0000065 -0.0000016 0.0000020 0.0000038
wk =Sr,max(εsm - εcm) mm -0.0049 ###### -0.0022 -0.0004 0.0005 0.0010
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-3 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -1.76 ###### -2.67 -3.26 -3.50 -3.41
(εsm - εcm) -0.0000053 ###### -0.0000080 -0.0000098 -0.0000105 -0.0000102
wk =Sr,max(εsm - εcm) mm -0.0020 ###### -0.0027 -0.0025 -0.0026 -0.0026
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-3 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -3.42 ###### -1.69 -0.12 1.02 1.56
(εsm - εcm) -0.0000103 ###### -0.0000051 -0.0000004 0.0000031 0.0000047
wk =Sr,max(εsm - εcm) mm -0.0040 ###### -0.0017 -0.0001 0.0008 0.0012
Check OK ###### OK OK OK OK
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
fct,eff = fctm
= 2.80 Mpa
Act = Area of concrete within tensile zone just before the formation of first crack.Hence section will
behave elastically untill the tensile the tensile fibre stress reaches fctm. Hence Neutral axis
Spacing = 75 mm
σs = fyk = 500 Mpa
8.500 1 8.500
0.000 0
1
2 0.200 2 0.200
3 0.050 3 0.050
2.200 1.600
4 1.350 1.600
4
5 0.001
6 0.210
4.800 4.800
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 5*L/8 =18.2 #######
Dist. From c/L brg. m
web width bw m 2.2 2.2 4.8 4.8 2.2 2.2
h m 1.600 1.600 1.600 1.600 1.600 1.600
Area A m2 5.485 5.485 5.485 8.513 5.485 5.485
yt m 1.799 1.799 1.799 2.605 1.799 1.799
Act = (D -yt)*bw m2 -0.437 -0.437 -0.954 -4.823 -0.437 -0.437
As.min mm2 -636.88 -636.9 -1389.55 -7022.56 -636.88 -636.88
Ast,Provided mm2 20784.78 20784.8 14614.69 25610.26 20784.78 20784.78
Check OK/Revise OK OK OK OK OK OK
yb m 0.908 0.908 0.908 0.946 0.908 0.908
Izz m4 0.015 0.015 0.015 3.583 0.015 0.015
Iyy m4 17.558 17.558 17.558 1.786 17.558 17.558
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
Calculation of Crack Width: ( IRC: 112 /clause 12.3.4)
wk,max = 0.30 mm
wk = Sr,max(εsm - εcm)
σmax = Max Crack Spacing = 3.4c + 0.17Φ/ρp,eff
Clear cover c= 52 mm
Bar dia Φ= 20 mm
5(c + Φ/2 ) = 310 mm
Spacing between bars = 100 mm < 310 mm
2.5(h-d)
ρp,eff = As/Ac,eff Ac,eff = min (h - x/3)
h/2
αe = Es/Ecm
Es = 200000 Mpa
Ecm = 32000 Mpa
αe = 6.25
kt = 0.50 (factor dependent on duration of loads)
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 3L/8 =18.17 #######
Dist. From c/L brg. m
Ast,Provided m 0.021 0.021 0.015 0.026 0.021 0.021
Avg.web width (bw) m 2.2 2.2 4.8 4.8 2.2 2.2
h m2 1.600 1.600 1.600 1.600 1.600 1.600
d m 1.559 1.559 1.564 1.543 1.517 1.515
yt m2 1.799 1.799 1.799 2.605 1.799 1.799
hc,eff mm2 0.102 0.102 0.090 0.142 0.207 0.214
Ac,eff mm2 0.22 0.22 0.43 0.68 0.46 0.47
ρp,eff As/Ac,eff 0.092 0.092 0.034 0.038 0.046 0.044
Smax m4 213.56 213.56 277.62 267.09 251.44 253.67
Crack Width for Load Case SLS-1 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -2.49 -2.13 -1.22 0.05 -2.32
(εsm - εcm) -0.0000075 -0.0000064 -0.0000064 -0.0000037 0.0000001 #######
wk =Sr,max(εsm - εcm) mm -0.0016 -0.0014 -0.0018 -0.0010 0.0000 -0.0018
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-1 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.65 -0.66 -2.34 -2.90 0.00
(εsm - εcm) 0.0000020 -0.0000020 -0.0000020 -0.0000070 -0.0000087 #######
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
wk =Sr,max(εsm - εcm) mm 0.0004 -0.0004 -0.0006 -0.0019 -0.0022 0.0000
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-2 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -4.83 -4.37 -3.41 -2.17 -4.75
(εsm - εcm) -0.0000145 -0.0000131 -0.0000131 -0.0000102 -0.0000065 #######
wk =Sr,max(εsm - εcm) mm -0.0031 -0.0028 -0.0028 -0.0022 -0.0014 -0.0030
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-2 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.60 -0.61 -2.23 -2.80 0.00
(εsm - εcm) 0.0000018 -0.0000018 -0.0000018 -0.0000067 -0.0000084 #######
wk =Sr,max(εsm - εcm) mm 0.0004 -0.0004 -0.0005 -0.0018 -0.0021 0.0000
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-3 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -3.54 -3.29 -2.68 -1.76 -3.50 -3.41
(εsm - εcm) -0.0000106 -0.0000099 -0.0000080 -0.0000053 -0.0000105 #######
wk =Sr,max(εsm - εcm) mm -0.0023 -0.0021 -0.0022 -0.0014 -0.0026 -0.0026
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-3 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.96 -0.20 -1.77 -2.36 0.00
(εsm - εcm) 0.0000029 -0.0000006 -0.0000006 -0.0000053 -0.0000071 #######
wk =Sr,max(εsm - εcm) mm 0.0006 -0.0001 -0.0002 -0.0014 -0.0018 0.0000
Check OK OK OK OK OK OK
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
fct,eff = fctm
= 2.80 Mpa
Act = Area of concrete within tensile zone just before the formation of first crack.Hence section
will behave elastically untill the tensile the tensile fibre stress reaches fctm. Hence
Spacing = 75 mm
σs = fyk = 500 Mpa
8.500 1 8.500
0.000 0
1
2 0.200 2 0.200
3 0.050 3 0.050
2.200 1.600
4 1.350 1.600
4
5 0.001
6 0.210
4.800 4.800
Section At unit
0.00 deff =1 L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.49
Dist. From c/L brg. m
web width bw m 4.8 4.8 4.8 2.2 2.2 2.2
h m 1.600 1.600 1.600 1.600 1.600 1.600
Area A m2 8.513 5.485 5.485 5.485 5.485 5.485
yt m 2.605 1.799 1.799 1.799 1.799 1.799
Act = (D -yt)*bw m2 -4.823 -0.954 -0.954 -0.437 -0.437 -0.437
As.min mm2 -7022.56 -1389.6 -1389.55 -636.88 -636.88 -636.88
Ast,Provided mm2 14350.80 14350.8 20784.78 20784.78 20784.78 20784.78
Check OK/Revise OK OK OK OK OK OK
yb m 0.946 0.908 0.908 0.908 0.908 0.908
Izz m4 3.583 0.015 0.015 0.015 0.015 0.015
Iyy m4 1.786 17.558 17.558 17.558 17.558 17.558
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
Calculation of Crack Width: ( IRC: 112 /clause 12.3.4)
wk,max = 0.30 mm
wk = Sr,max(εsm - εcm)
σmax = Max Crack Spacing = 3.4c + 0.17Φ/ρp,eff
Clear cover c= 52 mm
Bar dia Φ= 20 mm
5(c + Φ/2 ) = 310 mm
Spacing between bars = 100 mm < 310 mm
2.5(h-d)
ρp,eff = As/Ac,eff Ac,eff = min (h - x/3)
h/2
αe = Es/Ecm
Es = 200000 Mpa
Ecm = 32000 Mpa
αe = 6.25
kt = 0.50 (factor dependent on duration of loads)
Section At unit
0.00 deff =1 L/8 =2.37 L/4 =4.74 3L/8 =7.11 L/2 =9.49
Dist. From c/L brg. m
Ast,Provided m 0.014 0.014 0.021 0.021 0.021 0.021
Avg.web width (bw) m 4.8 4.8 4.8 2.2 2.2 2.2
h m2 1.600 1.600 1.600 1.600 1.600 1.600
d m 1.526 1.526 1.517 1.517 1.517 1.515
yt m2 2.605 1.799 1.799 1.799 1.799 1.799
hc,eff mm2 0.185 0.185 0.207 0.207 0.207 0.214
Ac,eff mm2 0.89 0.89 1.00 0.46 0.46 0.47
ρp,eff As/Ac,eff 0.016 0.016 0.021 0.046 0.046 0.044
Smax m4 386.97 386.97 339.65 251.44 251.44 253.67
Crack Width for Load Case SLS-1 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 2.29 ###### 0.82 -0.43 -1.24 -1.49
(εsm - εcm) 0.0000069 ###### 0.0000025 -0.0000013 -0.0000037 -0.0000045
wk =Sr,max(εsm - εcm) mm 0.0027 ###### 0.0008 -0.0003 -0.0009 -0.0011
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-1 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -3.86 ###### -2.00 -0.67 0.19 0.00
(εsm - εcm) -0.0000116 ###### -0.0000060 -0.0000020 0.0000006 0.0000000
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
wk =Sr,max(εsm - εcm) mm -0.0045 ###### -0.0020 -0.0005 0.0001 0.0000
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-2 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -0.44 ###### -1.84 -3.07 -3.90 -4.17
(εsm - εcm) -0.0000013 ###### -0.0000055 -0.0000092 -0.0000117 -0.0000125
wk =Sr,max(εsm - εcm) mm -0.0005 ###### -0.0021 -0.0036 -0.0045 -0.0048
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-2 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -4.03 ###### -2.19 -0.85 0.03 0.00
(εsm - εcm) -0.0000121 ###### -0.0000066 -0.0000025 0.0000001 0.0000000
wk =Sr,max(εsm - εcm) mm -0.0047 ###### -0.0022 -0.0006 0.0000 0.0000
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-3 Top Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 0.19 ###### -1.11 -2.06 -2.68 -2.86
(εsm - εcm) 0.0000006 ###### -0.0000033 -0.0000062 -0.0000080 -0.0000086
wk =Sr,max(εsm - εcm) mm 0.0002 ###### -0.0011 -0.0016 -0.0020 -0.0022
Check OK ###### OK OK OK OK
Crack Width for Load Case SLS-3 Bottom Slab Quasi Permanent Combination
Section At unit
0.00 ###### L/8 =2.37 2*L/8 =4.74 3*L/8 =7.11 4*L/8 =9.5
Dist. From c/L brg. m
σsc N/mm2 -3.24 ###### -1.66 -0.38 0.48 0.00
(εsm - εcm) -0.0000097 ###### -0.0000050 -0.0000011 0.0000014 0.0000000
wk =Sr,max(εsm - εcm) mm -0.0038 ###### -0.0017 -0.0003 0.0004 0.0000
Check OK ###### OK OK OK OK
12.0 Limit State of Cracking: Span 2
Minimum Reinforcement for crack Control:
As.min = KcKfct,effAct/σs ( IRC: 112 /clause 12.3.3(2))
K = 0.65 For web with h > 800mm
Kc = 0.40 For Bending member
fct,eff = fctm
= 2.80 Mpa
Act = Area of concrete within tensile zone just before the formation of first crack.Hence section will
behave elastically untill the tensile the tensile fibre stress reaches fctm. Hence Neutral axis
Spacing = 75 mm
σs = fyk = 500 Mpa
8.500 1 8.500
0.000 0
1
2 0.200 2 0.200
3 0.050 3 0.050
2.200 1.600
4 1.350 1.600
4
5 0.001
6 0.210
4.800 4.800
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 5*L/8 =18.2 #######
Dist. From c/L brg. m
web width bw m 2.2 2.2 4.8 4.8 2.2 2.2
h m 1.600 1.600 1.600 1.600 1.600 1.600
Area A m2 5.485 5.485 5.485 8.513 5.485 5.485
yt m 1.799 1.799 1.799 2.605 1.799 1.799
Act = (D -yt)*bw m2 -0.437 -0.437 -0.954 -4.823 -0.437 -0.437
As.min mm2 -636.88 -636.9 -1389.55 -7022.56 -636.88 -636.88
Ast,Provided mm2 20784.78 20784.8 14614.69 25610.26 20784.78 20784.78
Check OK/Revise OK OK OK OK OK OK
yb m 0.908 0.908 0.908 0.946 0.908 0.908
Izz m4 0.015 0.015 0.015 3.583 0.015 0.015
Iyy m4 17.558 17.558 17.558 1.786 17.558 17.558
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
Calculation of Crack Width: ( IRC: 112 /clause 12.3.4)
wk,max = 0.30 mm
wk = Sr,max(εsm - εcm)
σmax = Max Crack Spacing = 3.4c + 0.17Φ/ρp,eff
Clear cover c= 52 mm
Bar dia Φ= 20 mm
5(c + Φ/2 ) = 310 mm
Spacing between bars = 100 mm < 310 mm
2.5(h-d)
ρp,eff = As/Ac,eff Ac,eff = min (h - x/3)
h/2
αe = Es/Ecm
Es = 200000 Mpa
Ecm = 32000 Mpa
αe = 6.25
kt = 0.50 (factor dependent on duration of loads)
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 3L/8 =18.17 #######
Dist. From c/L brg. m
Ast,Provided m 0.021 0.021 0.015 0.026 0.021 0.021
Avg.web width (bw) m 2.2 2.2 4.8 4.8 2.2 2.2
h m2 1.600 1.600 1.600 1.600 1.600 1.600
d m 1.559 1.559 1.564 1.543 1.517 1.515
yt m2 1.799 1.799 1.799 2.605 1.799 1.799
hc,eff mm2 0.102 0.102 0.090 0.142 0.207 0.214
Ac,eff mm2 0.22 0.22 0.43 0.68 0.46 0.47
ρp,eff As/Ac,eff 0.092 0.092 0.034 0.038 0.046 0.044
Smax m4 213.56 213.56 277.62 267.09 251.44 253.67
Crack Width for Load Case SLS-1 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -1.22 -0.42 0.83 2.29 -2.32
(εsm - εcm) -0.0000037 -0.0000013 -0.0000013 0.0000025 0.0000069 #######
wk =Sr,max(εsm - εcm) mm -0.0008 -0.0003 -0.0003 0.0007 0.0017 -0.0018
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-1 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.23 -0.62 -1.94 -3.80 0.00
(εsm - εcm) 0.0000007 -0.0000019 -0.0000019 -0.0000058 -0.0000114 #######
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
wk =Sr,max(εsm - εcm) mm 0.0001 -0.0004 -0.0005 -0.0016 -0.0029 0.0000
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-2 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -3.90 -3.06 -1.84 -0.44 -4.75
(εsm - εcm) -0.0000117 -0.0000092 -0.0000092 -0.0000055 -0.0000013 #######
wk =Sr,max(εsm - εcm) mm -0.0025 -0.0020 -0.0020 -0.0012 -0.0003 -0.0030
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-2 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.08 -0.80 -2.13 -3.97 0.00
(εsm - εcm) 0.0000002 -0.0000024 -0.0000024 -0.0000064 -0.0000119 #######
wk =Sr,max(εsm - εcm) mm 0.0000 -0.0005 -0.0007 -0.0017 -0.0030 0.0000
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-3 Top Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 -2.67 -2.05 -1.10 0.18 -3.50 -3.41
(εsm - εcm) -0.0000080 -0.0000062 -0.0000033 0.0000006 -0.0000105 #######
wk =Sr,max(εsm - εcm) mm -0.0017 -0.0013 -0.0009 0.0001 -0.0026 -0.0026
Check OK OK OK OK OK OK
Crack Width for Load Case SLS-3 Bottom Slab Quasi Permanent Combination
Section At unit
5*L/8 =11.86 6*L/8 =14.2 7*L/8 =16.6 L =18.97 ########## #######
Dist. From c/L brg. m
σsc N/mm2 0.52 -0.32 -1.60 -3.17 0.00
(εsm - εcm) 0.0000016 -0.0000010 -0.0000010 -0.0000048 -0.0000095 #######
wk =Sr,max(εsm - εcm) mm 0.0003 -0.0002 -0.0003 -0.0013 -0.0024 0.0000
Check OK OK OK OK OK OK
Consultancy services for project preparation Detailed project report for the construction of Cable stayed Bridge with
footpath across lake at Motihari town including approaches site development and Beautification of proposed lake.
16.0 Check for Transverse Moment due to Cantilever Loading : At Intermediate Pier Location (Solid Portion)
Moment and Force at the face of pier due to loading in cantilever portion has been taken from Staadpro. (Unfactored)
Unfactored Factored
Moment Moment
Shear Force Shear Force
Kn-m Kn Factors Kn-m Kn
Dead load = 3793.1 1785.0 1.35 5120.7 2409.8
SIDL-CB = 451.6 212.5 1.35 609.6 286.9
SIDL-WC = 36.1 17.0 1.75 63.2 29.8
LL = 1137.9 535.5 1.50 1706.9 803.3
width = 2.40
overall depth = 1.6
effective depth = 1.54
provide 32 dia bars at spacing 150
+ 0 dia bars at spacing 125
Ast = 12868 mm2
steel percent pt = 0.0035
xu/d = 0.1199
xu/d (lim) = 0.456
limiting value of steel percent pt lim = 0.0132
min (B/W actual and limiting) % of steel = 0.0035
area of steel = 12868 mm2
moment of resistance = 8214 OK
17.0 Check for Transverse Moment due to Cantilever Loading : At EJ Pier Location (Solid Portion)
Moment and Force at the face of pier due to loading in cantilever portion has been taken from Staadpro. (Unfactored)
Unfactored Factored
Moment Moment
Shear Force Shear Force
Kn-m Kn Factors Kn-m Kn
Dead load = 1679.8 790.5 1.35 2267.7 1067.2
SIDL-CB = 189.7 89.3 1.35 256.0 120.5
SIDL-WC = 18.1 8.5 1.75 31.6 14.9
LL = 903.1 425.0 1.50 1354.7 637.5
width = 2.40
overall depth = 1.6
effective depth = 1.55
provide 25 dia bars at spacing 150
+ 0 dia bars at spacing 125
Ast = 7854 mm2
steel percent pt = 0.0021
xu/d = 0.0730
xu/d (lim) = 0.456
limiting value of steel percent pt lim = 0.0132
min (B/W actual and limiting) % of steel = 0.0021
area of steel = 7854 mm2
moment of resistance = 5127 OK