Company Profile

PO Box 130060

Al Fahim Bldg., 322/323,

Musaffah, Abu Dhabi, U.A.E.

T: 02 559 7720 - F: 02 559 7721

☞ To Be the Global Leader

1
Preface
Halla Corporation was established in the year 1980 having its corporate head office in Seoul, Korea and
expanding its operations locally and overseas having branches in U.A.E., China, Vietnam, India, Brazil, Poland
and Representative Office in Qatar. Halla is listed on the Korean Stock Exchange.

Halla Corporation was formerly known as Halla Engineering & Construction Corporation, the name change
is being effective from 1st Oct, 2013 and implemented to reflect the Company’s global identity, positioning and
diversification of the business field without any change in details and structure of the company.

Since its conception, Halla has delivered some of the most innovative and challenging projects in the field of civil
works, including, infrastructure, roads, bridges, tunnels, harbors, airports, railways and subways and high-tech
buildings, offices, educational research facilities, hotels, commercial facilities, stations and terminals, and
manufacturing facilities.

Halla established its branch office in Abu Dhabi in the year March, 2009 as a Special Grade Contractor for
Roads and Street Contracting, Bridges, Tunnels and Interchanges contracting, Drainages Contracting, Seaports
Contracting, All kinds of Buildings and Steel Structures Contracting. Our Abu Dhabi Branch Office is certified to
the international standards of ISO 9001:2008, ISO14001:2004 and OHSAS 18001:2007.

We are currently working on ADNOC’s projects in Abu Dhabi, Al Ain and Western Region. To enhance our
capabilities locally and to ensure the successful construction and completion of project in time and on budget and
to serve our Client with world class workmanship, we have strategic tie-ups with the UAE based reliable and
capable sub contractors, suppliers and design consultants to fulfill our projects requirements to Support Design
works, to Resource Heavy Duty Plant & Equipments, Material supplies, Skilled & Unskilled Labors, if required, to
augment our existing ones on the projects.

2
Preface
Halla is resourced with experienced and technical expertise who has been involved with various major and
challenging infrastructure projects and have hands on experience in implementing and operating latest project
management software applications to achieve project milestone within budget & to the satisfaction of Client.
Engineering and construction technologies are being developed in-house for infrastructure works.

Currently Halla employs more than 1000 professional and technical staff worldwide with a substantial amount
readily available to transfer on any upcoming projects.

Halla has a long history of successful business relationships with their respective clients. The longevity of Halla is a
testimony to the commitment individually demonstrated to its clients, employees and the communities in which we
have worked. We continuously develop and seek a relationship with our clients, which allow us to become a
partner and an extension of their organization. This enables us to bring the best value proposition to Client
business.

Halla adheres steadfastly to key set of values. Our commitment to quality innovation and safety reflects our
philosophy of putting people first, and we share aspirations for a better future with the local communities in which
we work.

2
Forbes
FABULOUS 50:THE BEST BIG COMPANIES

2
Forbes
FABULOUS 50:THE BEST BIG COMPANIES

5
HALLA Business Group

Global Network

Organization Chart (HO & BO)

Work Force

Financial Highlight

Work Experience (UAE & International)

6
 Halla Co
 Hala Encom
 Halla Devel
Construction  Ha
 d

 d
Education  Halla Stachpo
& HALLA Automobile  Mando Hella E
Sports
Group’s 

D
A Advanced Materials
 Halla
 Hal Ice Hockey Team Operations

Distribution  Halla
 Halla I&C Investment &  Halla
Port

7
Updated date : 01 Jan., 2014

Poland
● Mongolia
Azerbaijan ●

USA ●
● China
Qatar UAE
● ●
Lybia ● ● ● Taiwan
Myanmar
Saudi Arabia ●

● Vietnam
● India
Cote d’lvoire ●Singapore

Peru Indonesia

Brazil

8
Full Name
Halla Corporation – Abu Dhabi

Formally known as Halla Engineering & Construction Corporation

Nationality South Korea

Legal Form Foreign Company Branch

Established in Abu Dhabi March, 2009

Authorized Signatories & Contact Person 1. Byung Joon Lee – General Manager/Abu Dhabi
2. Changwook Seo – Dy. General Manager/Abu Dhabi

Sponsor Macro Trading Agencies


Represented By: Mr. Mobarak Obaid Saeed Almansouri

Address PO Box 130060, Al Fahim Bldg., 322/323, Musaffah, Abu Dhabi, U.A.E.
T: 02 559 7720 - F: 02 559 7721 - Email: middleeast@halla.com

Sr. No. Commercial Activities Classification


1. All types of Building Projects Contracting
2. Steel Structure Contracting
Special Grade
3. Main Roads & Streets Contracting
4. Bridges, Tunnels & Interchanges Contracting
5. Rain Water Drainage Contracting
6. Seaports Contracting

9
10
11
12
v
Updated date : 01 Jan., 2014
Chairman (Halla Group)

President & CEO


Financial Structure Strategic Planning
Improvement Committee Department

Company Culture I&C Corporate


Improvement Committee Innovation Planning
& Challenge Office
Legal Affairs HR & General Affairs
Department Department

Architectural
Overseas Plant Project New General
Civil Project Project Project Support IT Center
Business Development Business Administration
Division Development Division Division
Division Division Division Division
Division

 Biz. Planning
 Public Business  IT Planning
 Project Budget
 Biz. Planning  Biz. Planning  Private Business
Control  IT Platform
 Biz. 1  Biz. 1  Biz. Planning  Arch. Eng.  Biz. Planning
 Arch. Design  Procurement service  Financing
 Biz. 2  Biz. 2  Civil PJT Mgmt.  New Technology
 Mechanical PJT  IT Consulting  Accounting
 Quality and
 Civil Eng.  Plant Eng.  Civil Eng.  Electrical PJT Development
Safety Control Business
 Arch. Eng.  BIO Treatment  PJT Devmt.
 Sales Marketing
 Let’s PJT Planning
v
Updated date : 01 Jan., 2014

Abu Dhabi Branch Office


Work Force
Others: 26
 Management Staff: 13
Environmental  Project Managers: 3
Engineer: General  Engineers: 19
Civil Engineer:
16 Administrative  Technicians: 23
280  Skilled Labors: 64
Officer: 266
 Labors/Helpers: 210 (Hired)
Safety
 Total Strength: 351
controler: Architectural
71 Engineer:
235
Electrical
Engineer: Mechanical
38 Engineer:
70 R&D: 17 Designer: 39
Turnover Unit : US
Milion
2500

2000
1,969
1,729
1,616
1,502
1500 1,367

1000

500

2008 2009 2010 2011 2012

16
Completed • Construction of (3) Service Stations (FS)

Projects • Construction of (4) Vehicle Inspection Centers (VIC)

18
Contract Completion Total Contract
Sr. Project Title Client Name Description of Work Role in Project
Date Value
No.

Construction of (3) Construction of Service Main Contractor 21/03/2013 AED


1. Service Stations Station at Jreen Al Aish 22.10 m
ADNOC
Distribution in JV with
Total Built-Up Area: Dolphin
Site Location: Construction
Jreen Al Aish 2,323.2 m2 (50:50)
(Western Region)

2. Construction of (4) Construction of (4) Main Contractor Markhaniya AED


Completed
Vehicle Inspection ADNOC Vehicle Inspection 15/01/2014 66.63 m
Centers (Abu Dhabi Distribution Centers in JV with +
&Projects
Al Ain) Dolphin Mazyed 12.87 m
Total Built-Up Area: Construction 06/01/2014 (Variation)
(50:50)
Site Location: 9,036.13 m2 Al Qalaa TOTAL
1. Markhaniya 13/05/2014 79.50 m
2. Mazyed
3. Al Qalaa Al Mushrif
4. Al Mushrif on Hold

19
• Construction of (3) Service Stations (FS)
On Going
Projects • Construction of G+2 Embassy Office Building and
Completed G+1 Residence Building

Projects

20
Sr. Project Title Client Name Description of Work Role in Project Contract Completion Total Contract
No. Value

Construction of Service Main Sila-2 AED


1. Construction of (3) ADNOC Station at Contractor August/2014 38.15 m
Service Stations Distribution Sila-2
Ghabat Baynoona
Site Location: Total Built-Up Area: on Hold
1. Sila-2 3,798.9 m2
2. Ghabat
On Going
Baynoona

Projects Main
Construction of G+2 Ministry of Construction of G+2 Nov, 2014 AED
2. Completed
Embassy Office Foreign Affairs Embassy Office Contractor 47.07 m
Building and G+1 and Trade Building and G+1
Projects
Residence Building Residence Building
for the Embassy of (Embassy of
the Republic of Republic of Total Built-Up Area:
Korea in Abu Dhabi Korea) 58,597 m2

21
CIVIL PROJECT WORK EXPERIENCE

• Civil Facilities works of Landing Strip No.1 South 13


Area in Incheon International Airport Section No. A-2

• Apron Facilities of Passenger Terminal in Incheon 14


International Airport Section No. A-5
Airport
Projects • Incheon International Airport IAT/BHS Tunnel 15
Structure

• Facilities Works for B,C Aprons, the 2nd Phase of 16


Incheon International Airport Section No. 2A-6

• Uljin Airport 17

22
Civil Facilities works of Landing Strip No.1 South Area
in Incheon International Airport Section No. A-2
 Client
Incheon International Airport Corp.
 Location
Incheon Metropolitan city, Korea
 Contract Amount
USD 150.4mil.
 Contract Period
December, 1996 ~ November, 2000
 Description
- Earthworks : Airport Land area 1,566,078m2
- Excavation:139,763m2, Embankment:525,292m2
- Pavement : Total of Airport works 607,105m2
- Landing Strip:1,758m x 60~84m
(including hard shoulder) 147,246m2
- Parallel taxiway:2line(1,671m x 30~45m) 143,580m2
- Taxiways of high speed right angle:13lines 245,806m2
- Apron:70,473m2, Other(access road etc.) 59,852
- Underpass : L=1,086m, B=20m
- Main line Box 538.5+Ramp(Box-Type301.5+U-Type246)
23
Apron Facilities of Passenger Terminal
in Incheon International Airport Section No. A-5
 Client
Incheon International Airport Corp.
 Location
Incheon Metropolitan city, Korea
 Contract Amount
USD 125.7mil.
 Contract Period
May, 1997 ~ October, 2000
 Description
- Pavement for Mooring Place : 1,330,307m2
- Earthworks:894,568㎡,Filling&others:1,256,397m2
- Banking: 364,268m2, Pre-loading: 407,291m2
- Apron Pavement: 1,330,307m2
- Drainage : P.C Box 13,278m, Ditch Box 6,054m,
Rain Pipeline(D600~D1,350) 2,771m
- Underground Pipeline etc.

24
Incheon International Airport IAT/BHS Tunnel Structure

 Client
Incheon International Airport Corp.
 Location
Incheon Metropolitan city, Korea
 Contract Amount
USD 70.1mil.
 Contract Period
August, 1996 ~ December, 1998
 Description
- IAT/BHS(Intra Airport Transit / Baggage Handling
System)
- Subway(IAT/BHS)
Length : 1,447.04m(L=738.52m Box x 2Line)
Inside Diameter: 250.96m2 (26.7m x 9.4m)
- Soft Ground
Sand Compaction Pile (D700, 1.75 x 1.75)
Length: 117,728m, Area: 67,000m2

25
Facilities Works for B,C Aprons, the 2nd Phase of Incheon
International Airport Section No. 2A-6
 Client
Incheon International Airport Corp.
 Location
Incheon Metropolitan city, Korea
 Contract Amount
USD 80.3mil.
 Contract Period
August, 2004 ~ April, 2008
 Description
- Earthwork: 234,897m3
- Pavement for Apron : 439,210m2
- GSE Road: 9,064m
- P.C Box: 3,133m, Ditch Box: 4,342m
- Wasting water Road: 706m
- Wasting water Facilities: 1pc
- Public Structure: 580m
- IAT/BHS Structure (Subway): 247m

26
Uljin Airport

 Client
Busan Regional Aviation Administration,
Ministry of Land, Transport and Maritime Affairs
 Location
Yongdam2-dong Jeju-si, Jeju Special Self -
Governing Province, Korea
 Contract Amount
USD 54.4mil.
 Contract Period
December, 2000 ~ June, 2010
 Description
- Airplane Runway: 1,800m x 45m (Pavement: 81,000m2)
- Right-angled Leading Road: 231.5m x18m(4,167m2)
- Internal, External Road: L=9,660m, B=5m(48,300m2)
- Landside Facilities
- Parking Lot (14,910m2), Road(L=4,428.5m,B=7.5~11m)
- Water Pipe : 2,374m , Landscaping : 17,002m2
27
CIVIL PROJECTS - WORK EXPERIENCE

• Expressway between Jangheung and Gwangyang 19

• Road Extension and Pavement between Yeongwol 20


and Jeongyang

Road & • Extension of Express Highway 451 between Seongseo 21


and Okpo Section No.1
Bridge
• The Second Gwangju Beltway Section No. 4 22
Projects
• West Coast Expressway between Dangjin and 23
Seocheon

• Choir -Sainshand Road in Mongolia 24

28
Expressway between Jangheung and Gwangyang

 Client
Korea Expressway Corporation
 Location
Boseong-gun, Jeollanam-do
 Contract Amount
USD 173.4milion
 Contract Period
December, 2006 ~ June, 2012
 Description
- Road Work:
Total Length= 11.3km, Width= 23.4m
- Bridge Work:
Long Bridge Length= 1,515m / 7EA
Short Bridge Length= 316m / 12EA
- Tunnel Work:
Total Length= 1,595m, Width= 11.6m / 3EA
NATM Method

29
Road Extension and Pavement
between Yeongwol and Jeongyang
 Client
Gwangwon Province Office
 Location
Yeongwol-gun, Gwangwon-do
 Contract Amount
USD 162.0milion
 Contract Period
March, 2002 ~ April, 2010
 Description
- Road Work:
Total Extension Length= 6.2km, Width= 18.5m
- Bridge Work:
Long Bridge Length= 1,085m / 2EA
Short Bridge Length= 167m / 5EA
- Tunnel Work:
Total Length= 1,863m / 2EA
NATM Method

30
Extension of Expressway 451
between Seongseo and Okpo Section No.1
 Client
Korea Expressway Corporation
 Location
Dalseo-gu, Daegu Metropolitan city
 Contract Amount
USD 136.3milion
 Contract Period
December, 2005 ~ December, 2010
 Description
- Road Work:
Total Length= 5.5km, Width= 37.8m~51.8m
- Bridge Work:
Long Bridge Length= 323m / 2EA
Short Bridge Length= 517m / 14EA
- Other Details:
Concrete Pavement= 11,765m3
Asphalt Concrete Pavement= 289,500m2

31
The Second Gwangju Beltway Section No.4

 Client
Gwangju Second Belt-highway Inc., Korea
 Location
Seo-gu, Gwangju Metropolitan city
 Contract Amount
USD 182.9milion
 Contract Period
May, 2004 ~ April, 2007
 Description
- Road Work:
Total Length= 4.5km, Width= 35.9m
- Bridge Work:
Long Bridge Length= 1,230m / 3EA
Short Bridge Length= 189m / 5EA
- Other Details:
Underground Road Length = 442m, Width= 28.0m

32
West Coast Expressway between Dangjin and Seocheon

 Client
Korea Expressway Corporation
 Location
Dangjin-gun, Chungchungnam-do
 Contract Amount
USD 181.2milion
 Contract Period
December, 1996 ~ November, 2001
 Description
- Road Work:
Total Length= 13.6km, Width= 23.4m~30.6m
- Bridge Work:
Long Bridge Length= 1,641m / 4EA
Short Bridge Length= 667m / 10EA
- Other Details:
Earth Work= 6,032,473m3
Tollgate Construction= 2 Location

33
Choir -Sainshand Road in Mongolia

 Client
MCA-M (Millennium Challenge Account-Mongolia)
 Location
Choir, Mongolia
 Contract Amount
USD 32.6milion
 Contract Period
March, 2012 ~ August, 2013
 Description
- Road Work:
Total Length= 90.0km, Width= 10.0m
- Bridge Work:
Choir Bridge Length= 332m / 1EA
- Other Details:
Asphalt Concrete Pavement= 36,456m3
Pipe Installation= 708m

34
CIVIL PROJECT S - WORK EXPERIENCE
• Turn-Key Project Incheon New Port Container 26
Terminal Section No. 1, Phase1-1

• Turn-Key Project Ulsan New Port Northern Breakwater 27


Section No.2

Port • Yeongil New Port in Pohang Phase 1-1 28


Projects
• Samho Shipyard & industrial complex 29

• Cai Lan International Container Terminal in Vietnam 30

35
Turn-Key Project Incheon New Port Container Terminal
Section No. 1, Phase1-1
 Client
Incheon Port Authority
 Location
Yeonsu-gu, Incheon
 Contract Amount
USD 180.8milion
 Contract Period
April, 2009 ~ February, 2013
 Description
- Port Mooring Facilities Work:
Quay Wall (Container Berth) Length= 850m
Caisson Construction= 44berth (32.5W*19.3L*26.1H)
Crane Rail Installation= 1,700m
- Port Suburb Facilities Work:
West-side Connected Revetment Length= 150m
Separated Revetment Length= 476m
- Other Details:
Soft Ground Treatment= 530,000m², P.B.D Method
Dredging and Reclaiming Work= 2,621,633m²
36
Ulsan New Port Northern Breakwater Section No.2

 Client
Ulsan Regional Maritime Affairs and Port Office
 Location
Nam-gu, Ulsan Metropolitan City
 Contract Amount
USD 131.7milion
 Contract Period
October, 2009 ~ July, 2012
 Description
- Breakwater Work:
Length= 650m
Caisson Construction= 22berth
- Superstructure Work:
Cap Concrete= 38,650m3
- Other Details:
Outdoor Electric Installation & Renewable Energy
Power Plant Construction

37
Yeongil New Port in Pohang Phase 1-1

 Client
Pohang Yeongil New Port Corporation
 Location
Buk-gu Pohang-si, Gyeongsangbuk-do
 Contract Amount
USD 296.5milion
 Contract Period
August, 2005 ~ August, 2009
 Description
- Berth Facilities Work (Container Dock):
Berthing for 20,000DWT x 4EA, Length=1,000m
Caisson Type Dock= 49EA
Container Yard= 242,600m²
- Other Details:
Land Development= 640,318m²
Appurtenant Work: Cargo Handling Gear, etc.

38
Samho Shipyard & industrial complex

 Client
Halla Heavy Industries Co., Ltd., Korea
 Location
Youngam-gun, Jeollanam-do
 Contract Amount
USD 265.7milion
 Contract Period
June, 1992 ~ December, 1998
 Description
- Port Facilities Work:
Berthing for VLCC x4EA, Length= 1,782.5m,
Cell-Block Method
Revetment Length= 1,598m
Lighters Wharf Length= 100m
- Other Details:
Site Development= 2,913,841m2
Dredging Work= 549,365m3

39
Cai Lan International Container Terminal in Vietnam

 Client
Cai Lan International Container Terminal LLC
 Location
Ha Long City, Quang Ninh Province, Vietnam
 Contract Amount
USD 28.4milion
 Contract Period
December, 2010 ~ December, 2012
 Description
- Berthing Facilities Work:
Container Terminal Size= 50,000DWT
Quay Wall Length= 500m
- Other Details:
Crane Rail Installation Length= 1,180m
PHC Piling Length= 14,630m
Dredging Work= 628,012m3

40
CIVIL PROJECTS - WORK EXPERIENCE

• Gyeongbu Express Railway 32

• Turn-Key Project Prototype Railway for Urban Maglev 33


Train
Railway &
• Acess railway to Yangsan Inland Container Depot 34
Subway
Projects • Busan Metro Line No.2 Section 201 and 202 35

• Gwangju Urban Metro Line No.1 Construction 36

41
Gyeongbu Express Railway

 Client
Korea Rail Network Authority
 Location
Seo-gu, Gwangju Metropolitan City
 Contract Amount
USD 448.8milion
 Contract Period
May, 1993 ~ September, 2001
 Description
- Railway Work:
Total Length=29,200m, Width= 14m~56.4m
- Bridge Work:
Rahmen Bridge Length=3,341m, Width=14m / 4EA
P.C BOX Bridge Length=13,263m , Width=14m / 8EA
- Tunnel Work:
Total Length= 2,020m
NATM Method(1,460m), Open Cut Method(560m)
- Other Details:
Railway Vehicle Base 1EA
42
Turn-Key Project Prototype Railway for Urban Maglev Train

 Client
Korea Rail Network Authority
 Location
Jung-gu, Incheon Metropolitan City
 Contract Amount
USD 203.4milion
 Contract Period
February, 2010 ~ November, 2012
 Description
- Railway Work:
Total Length= 6,100m
- Bridge Work:
Total Length=219m, Width=12.2m / 1EA
- Other Details:
Metro Station 6EA
Railway Vehicle Base Center= 35,880m²

43
Acess railway to Yangsan Inland Container Depot

 Client
Busan Regional Maritime Affairs & Port Office
 Location
Yangsan-si, Gyeongsangnam-do
 Contract Amount
USD 57.6milion
 Contract Period
December, 1999 ~ October, 2005
 Description
- Railway Work:
Single Line (Northbound) Length=2.1km, Width=6.6m
Single Line (Southbound) Length=2.0km, Width=6.6m
Double Line Length= 2.2km, Width=10.9m
- Bridge Work:
Overpass Length=1,888m, Width=6.6m~10.9m/1EA
Transversal Bridge Length=80m, Width=6.6m
- Other Details:
Railway Station 2EA
Soft Ground Treatment= 60,329 m², P.D.B Method &
Gravel Compaction Pile Method
44
Busan Metro Line No.2 Section 201 and 202

 Client
Busan Urban Transit Authority
 Location
Haeundae-gu, Busan Metropolitan City
 Contract Amount
USD 69.2milion
 Contract Period
October, 1992 ~ December, 1998
 Description
- Railway Work:
Total Length= 3,667.5m, Width= 22m
Open Cut Method(1,592.5m), Ground Section(2,075m)
- Bridge Work:
Steel Box Girder Bridge Length=160m / 1EA
- Other Details:
Metro Station 1EA

45
Gwangju Urban Metro Line No.1 Construction

 Client
Gwangju Metropolitan Rapid Transit Corporation
 Location
Seo-gu, Gwangju Metropolitan City
 Contract Amount
USD 61.8milion
 Contract Period
July, 1997 ~ October, 2001
 Description
- Railway Work:
Total Length=1,575m, Open Cut Method
- Other Details:
Metro Station 1EA
Cable Tunnel Length= 511.6m

46
CIVIL PROJECTS - WORK EXPERIENCE

• Turn-Key Project Port Hinterland Complex 38


Development at Gwangyang Port Section No. 2
Residential &
Industrial • Infrastructure Development Works on Section No.1 39
in Songdo Lot No.1-2
Complexes
Projects

47
Port Hinterland Complex Development at Gwangyang Port
Section No. 2
 Client
Korea Industrial Complex Corporation
 Location
Gwangyang-si, Jeollanam-do
 Contract Amount
USD 141.3milion
 Contract Period
June, 2008 ~ June, 2012
 Description
- Site Preparation Work:
Total Area= 868,035m²
- Road Work:
Total Length= 6.2km
- Bridge Work:
PnP Girder Bridge Length=355m / 2EA
- Other Details:
Soft Ground Treatment=759,993m3 / P.B.D Method &
Sand Drain Method
Drainpipe Work for Rain Water, Sanitary and Water
Supply Facilities
48
Infrastructure Development Works on Section No.1 in Songdo
Lot No.1-2
 Client
SH Corporation
 Location
Yeonsu-gu Incheon Metropolitan City
 Contract Amount
USD 69.0milion
 Contract Period
October, 2006 ~ October, 2009
 Description
- Site Preparation Work:
Total Area= 2,993,303m²
- Road Work:
Total Length= 9.2km, Width= 20m~50m
- Other Details:
Drainage Pump Station= 32,000m3/day
Soft Ground Treatment=445,147m3 / P.B.D Method &
S.C.P Method
Drainpipe Work for Rain Water, Sanitary and Water
Supply Facilities
49
Architectural Work Experience

• Hyundai Complex Shopping Center 41

•Hyundai Department Store in Daegu 42


Building
&
Property • HYHILL Residential-commercial Building 43
Develop
-ment
Projects • Mando Central Laboratory in Pangy 44

• Shanghai Jingyin Mansion Building in China 45

• Azersu New Office Tower Project in Azerbaijan

50
Hyundai Complex Shopping Center in Pangyo, Seongnam City

 Client
Hyundai Shopping Co., Ltd.
 Location
Seongnam-si, Gyeonggi-do
 Contract Amount
USD 292.1million
 Contract Period
March 2013 ~ August 2015
 Description
- Total Floor Area: 235,454.13m²
- Number of Stories: B7F ~ 13F
- Structure: Steel frame + Reinforced Concrete
- Other Details
Retails, Cultural and Entertainment Facilities,
Cinema
Parking Lot: 2,280Cars

51
Hyundai Department Store in Daegu

 Client

Hyundai Shopping Mall Co.

 Contract Amount

USD 153 mil.

 Completion

Jul. 2011

 Description

Total Floor Area 119,216㎡

B6~10F, Parking lot: 632 and Movie


theater: 736 seats

52
HYHILL Residential-commercial Building

 Client

Saekyung D&B Corp.

 Contract Amount

USD 121 mil.

 Completion

Feb. 2013

 Description

Site area: 12,604 ㎡

Total floor area: 98,944.07 ㎡

B5-20F, Office, Shopping Mall, Cinema


and Commercial Building
53
Mando Central Laboratory in Pangyo

 Client

Mando Corp.

 Contract Amount

USD 104 mil.

 Completion

Sep. 2012

 Description

Total Floor Area 56,942㎡

B3-9F, Business Office & Laboratory


Facilities

54
Shanghai Jingyin Mansion Building in China

 Client
Shanghai Jin Yin Mansion Building &
Developing Co., Ltd. China
• Contract Amount
USD 130 mil.
 Completion
Dec. 1999
 Description
Site area : 8,600㎡
Total floor area : 70,546㎡
Multi used complex building (B3~38F

55
Azersu New Office Tower Project in Azerbaijan

 Client

Azersu Open Joint Stock Company

 Contract Amount

USD 107 mil.

 Completion

Mar. 2015

 Description

Site Area : 23,367.62㎡

Total Gross Area : 36,325.81㎡

B2~21F, Podium 2F

56
Housing Work Experience

• Xiangyi Guoji Residential Complex in China 47

• Halla Vivaldi in Youngjong Skycity (Block 44) 48

Housing
Projects • Incheon Chungla Halla Vivaldi (Block A-6) 49

• Paju New Town Halla Vivaldi (Block A15) 50

• Cheongju Yongjeong Halla Vivaldi 51

57
Xiangyi Guoji Residential Complex in China
 Client
Halla (Tianjin) Real Estate Development
Co., Ltd.
 Contract Amount
USD 328 mil.
 Completion
Oct. 2013
 Description
Site area : 117,059㎡
Total floor area : 219,304㎡
31 Residential Buildings for 1,986 units
2 Buildings of Commercial Mall
1 Business Hotel & Office Building

58
Halla Vivaldi in Youngjong Skycity (Block 44)

 Client

Mir E&C Corp.

 Contract Amount

USD 235 mil.

 Completion

Sep. 2012

 Description

Total Floor Area 263,236㎡

B3~30F, 11 Buildings (1,365Units)

59
Incheon Chungla Halla Vivaldi (Block A-6)

 Client

Halla Corporation

 Contract Amount

USD 218 mil.

 Completion

Oct. 2011

 Description

Total Floor Area 215,108㎡

B2~25F, 12 Buildings (992 Units)

60
Paju New Town Halla Vivaldi (Block A15)

 Client

Moonil Housing Development Co., Ltd.

 Contract Amount

USD 213 mil.

 Completion

Aug. 2009

 Description

Total Floor Area 193,749㎡

B2~29F, 12 Buildings (937 Units)

61
Cheonan Yonggok Halla Vivaldi

 Client

Halla Corporation

• Contract Amount

USD 175 mil.

 Completion

Jan. 2010

 Description

Total floor area : 230,113㎡

18~25F, 20 Buildings (1,163 Units)

62
Industrial & Environment Work Experience

• Negeri Sembilan Cement Plant 53


Industrial
&
Environ- • Bishah Cement Plant 54
ment
Projects
• Okgye Cement Plant 55

• Halla Plup & Paper Plant 56

63
Negeri Sembilan Cement Plant

 Client
Negeri Sembilan Cement Industries,
Sdn. Bhd., Malaysia

 Contract Amount
USD 188.7 mil.

 Completion
Apr. 1998

 Description
3,600 MTPD clinker
A turnkey project (EPCC)

64
Bishah Cement Plant

 Client
Southern Province Cement Company,
Saudi Arabia

 Contract Amount
USD 220.7 mil.

 Completion
May. 1997

 Description
3,800 MTPD clinker
A turnkey project (EPCC)

65
Okgye Cement Plant

 Client
Halla Cement Manufacturing Corp.,
Korea

 Contract Amount
USD 485 mil.

 Completion
Oct. 1997

 Description
7.4mil. MTPY clinker
A turnkey project (EPCC)

66
Halla Plup & Paper Plant

 Client
Halla Pulp & Paper Co., Ltd., Korea

 Contract Amount
USD 304 mil.

 Completion
Dec. 1996

 Description
240,000 MTPY
A turnkey project (EPCC)

67
Address (BO):
PO Box: 130060, Abu Dhabi, U.A.E.
Tel.: 02 559 7720 - Fax: 02 559 7721
E-mail: middleeast@halla.com

Address (HQ):
Sigma tower, 289 Olympic-ro, Songpa-gu, Seoul, Korea

Telephone: +82 - 2 - 3434 - 5452

Fax: +82 - 2 - 3434 - 5520

Homepage: www.halla.com (Group)


www.halla.co.kr (Halla Corporation)

E-mail: kunic.choi@halla.com