ABOUT US
T he three major activities of Ricwil (Malaysia)
Sdn Bhd are in manufacturing, contracting and
engineering trading.

Incorporated in 1984, Ricwil (Malaysia) Sdn Bhd,


with 51% Malaysian Shareholders and balance 49%
belonging to Ricwil Japan, is licensed to manufacture
preinsulated pipes under the Industrial Co-ordination
Act 1975. Currently it is 100% wholly owned by
Malaysians.


Reliability,
Integrity,
Consistency,
Willingness, Competent Japanese engineers in Malaysia trained our
Improvement and local technicians for one and a half years. Presently,
Ricwil (Malaysia) Sdn Bhd provides services to
Logic Singapore, Indonesia, Nepal, Brunei, Philippines,
Middle East, Hong Kong, Taiwan, Myanmar, Vietnam,
Combodia, Sri Lanka, Bangladesh and Thailand.

Today, Ricwil’s underground and aboveground


preinsulated pipes covering thousand of miles are
functioning satisfactory in all areas of work. Through
these ensuring years, Ricwil Malaysia has expanded its
activities to mechanical contracting and trading, serving
both the commercial and process industry sectors.

Having a track record of reliability, Ricwil ensure


customer’s requirement are met and perform to their
satisfaction. With its integrity proven over the years,
Ricwil ensures consistency in its products. Coupled
with the willingness and initiative of its workforce,
Ricwil seeks to provide a service that surpasses the
expectation of its valued customers.
OVERVIEW
Rigid polyurethane foam systems It is a material with a proven track record for
reliability, durability and efficiency. Versatility
for pipe insulation
is demonstrated by the ability to insulate over
Rigid polyurethane foam has been used for
an extremely wide range of temperatures,
the insulation and protection of pipes for more
from the extreme cold of -196°C to the
than 30 years. It is now more widely used
intense heat of more than 150°C.
than ever, increasingly displacing alternative
materials. One of the most popular areas of
It is also suitable for applications ranging
use is for district cooling systems, where it is
from small plumbing pipes 10mm in
the insulant of first choice for many specifiers.
diameter, up to the largest heating pipes with
Other common uses are in:
2,000mm diameters and 250mm of insulation
1) On and offshore oil and gas pipelines thickness.
2) Heating and plumbing services for power
stations, chemical plants and refineries Pipe manufacturing techniques for
3) Dairy industry applications effective insulation
4) District heating systems There are two main forms of pipe production
5) Other special applications i.e. swimming techniques; discontinuous and continuous.
pool pipelines The method adopted by an individual
manufacturer will reflect the particular
operations and applications of that
company’s business.

Polyurethane foam’s popularity is based on


its outstanding insulation properties, which
prevent heat loss, or alternatively maintain
temperatures in cold environments to
prevent freezing or cracking. These energy Discontinuous pipe manufacturing
conservation qualities improve the overall techniques
cost efficiency of customers’ networks. Discontinuous manufacture involves filling of
the void between, typically, a steel inner pipe
Other important characteristics include high within a high density polyethylene (HDPE)
mechanical strength, adhesion, flexibility and casing pipe. The gaps at both ends of the
good flow-ability, necessary for the consistent pre-assembly are sealed with tightly fitting
fill and insulation of pipe sections. caps equipped with injection and air venting
holes. Standard steel pipe lengths for this
process are 6 m and 12 m.

p. 03 / 04
Why polyurethane is an excellent Adhesion
insulant During the short period between mixing
Rigid polyurethane foam demonstrates and final curing, rigid polyurethane foam is
versatility both through its physical strengths extremely adhesive, which allows it to bond
and mechanical properties. These qualities effectively with a wide range of building
enable it to be used in a wide variety of facings. The adhesion is so strong that the
multi-functional building products which strength is usually higher than the tensile or
combine insulation with load-bearing, sealing, shear strength of the foam.
impact resistance, weight and space-saving,
together with ease of maintenance. Compatibility
Rigid polyurethane foam is compatible
Low thermal conductivity   with a large number of building facings,
Rigid polyurethane foam has one of the including paper, foil, glass fibre, aluminium,
lowest thermal conductivity ratings of any plasterboard, plywood and bitumen. These
insulant, which allows efficient retention can complement the inherent strengths of the
of heat or, alternatively, maintenance of a foam, enabling use as semi-structural panels
refrigerated or frozen environment. and cladding and allowing foam to accept
cosmetic finishes such as plaster to operate
effectively as moisture barriers in conditions
of high humidity.

Strength
Rigid polyurethane foam provides a high level
of compression and shear strength, which
is bond enhanced by bonding with facing Water absorption
materials such as metal or plasterboard. The water vapor permeability of rigid
polyurethane foam is low and is enhanced
Processability in most building applications by the
Rigid polyurethane foam can be made either incorporation of a moisture barrier of
under continuous block or batch factory polyethylene film or aluminium foil.
production, or by on-site mixing for spray and
injection purposes.

In-situ stability
Rigid polyurethane foam can be used in
applications which experience exceptional
extremes of temperature, from -200°C to
+100°C.
Rigid polyurethane foams are usually used Polyurethanes are flexible foams used in
at lower thicknesses than other insulants, mattresses, chemical-resistant coatings,
which means that their heat or fuel contribut adhesives and sealants, insulation for
ion to a fire is low compared to other, buildings and technical applications like heat
thicker insulating materials. The overall fire exchangers, cooling pipes and much more.
performance of an insulation panel can be
significantly enhanced by the material that is The relation between temperature and
used to face the panel - for example, steel. thermal conductivity is indicated in the
diagram below:
Independently monitored, large-scale tests
of buildings incorporating rigid polyurethane T(°C) = 5/9[T(°F) - 32]
and polyisocyanurate (PIR) foam insulation
carried out in the USA and Europe have
concluded that, properly used, these
materials do not add to the severity or serious
hazard of fires.

Lightness
At low densities (e.g. 30kg/m3), the volume of
polyurethane polymer in rigid polyurethane
foam is around 3 per cent. The remaining 97
per cent of the foam is gas trapped within
the cells, which provides the low thermal
conductivity properties.

The lightness of the foam is an important


aspect in terms of transportation, handling
and ease of installation.

Chemical resistance
Rigid polyurethane foam provides excellent
resistance to a wide range of chemicals,
solvents and oils.

PU Factor
Polyurethane is an organic polymer formed
by reacting a polyol (an alcohol with more
than two reactive hydroxyl groups per
molecule) with a diisocyanate or a polymeric
isocyanate in the presence of suitable
catalysts and additives.

p. 05 / 06
HI-GARD™
LO-TEMP HI-GARD
RICWIL’S Lo-Temp Hi-Gard piping system is the highest quality,
most efficient and dependable method of providing for above-
ground distribution of fluids at temperatures up to 130°C.

Lo-temp Hi-Gard is prefabricated to improve quality and save


labor, the Lo-Temp Hi-Gard piping system is completely
preinsulated to satisfy insulation and jacketing needs for all
above-ground applications, indoors and outside.

Lo-Temp Hi-Gard provides the unparalleled thermal efficiency of factory-applied polyurethane


insulation, protected by any one of a multitude of jacket materials. Metal jackets of aluminium,
galvanized steel, plastic coated glavanized steel, stainless steel, and U.V. inhibited plastic
jacket of PVC and polyethylene are all available. Lo-Temp Hi-Gard components are factory
assembled including all necessary fabricated fittings, such as elbows, tees, expansion loops
and anchors, so a complete system ready for fast installation is delivered to the jobsite.
Supporting of the Lo-Temp Hi-Gard system is simplified by the capability of supporting from
the outside of the protective jacket.

MID-TEMP HI-GARD
RICWIL’S Mid-Temp Hi-Gard piping system provides superior
BTU savings in addition to an efficient, high quality, labor-saving
method of providing for the distribution of fluids above-ground at
temperatures of 130°C and above.

A combination of calcium silicate and polyurethane insulation


makes BTU savings possible. These savings are extremely
desirable in electric-traced applications where every BTU saved
lowers electrical equipment material cost and adds to lifelong
savings in power usage. These savings also justify Mid-Temp Hi-Gard purchase for many
district cooling and heating applications, where every BTU delivered to a customer brings
added income to system owner. Supporting of pipe system is simplified by capability of
supporting from the outside of the protective capability of supporting from the outside of the
jacket.

Completely prefabricated and preinsulated, the Mid-Temp Hi-Gard piping system meets
the design requirements of all above-groundinstallations for services of and above where
maximum BTU savings are desired. Mid-Temp Hi-Gard.
maintains thermal efficiency indoors and outside. It consists of a highly thermal-efficient inner
layer of a calcium silicate, and outer layer of polyurethane factory-applied to the required
thickness and density, and a protective jacket of a material best suited to the application.
Metal jackets of aluminium, galvanized steel, plastic coated glavanized steel, stainless steel,
and U.V. inhibited plastic acket of PVC and polyethylene are all available. These components
are efficiently factory assembled including all necessary fabricated items such as elbows,
tees, expansion loops and anchors, etc., to deliver a complete system to the jobsite.

HI-TEMP HI-GARD
RICWIL’S Hi-Temp Hi-Gard piping system provides maximum
durability in addition to an efficient, high quality, labor-saving
method of providing for the distribution of fluids at temperatures
above 150°C.

The combination of of RICWILs exclusive nonflammable


insulation locking agent with calcium silicate makes maximum
system economy possible.Hi-Temp Hi-Gard is a specially
formulated, high-strength inorganic locking agent that exhibits
virtually no temperature limitations when used in a RICWIL piping system.

The inorganic locking agent’s high-compression strength, plus the combination of insulation
materials that allows RICWIL to apply the minimum thickness of insulation required to
maintain desired temperatures, results in a rugged,durable system. A syatem that allows
maximum earing loads with maximum support spans. These design savings are added to
the economy of Hi-Temp Hi Gard minimum insulation thickness.Completely preinsulated to
handle all temperatures, the prefabricated piping system is particularly suited for indoor and
outside applications. Supporting the Hi-Temp Hi-Gard system is simplified by capability of
supporting from the outside of the protective jacket.

Hi-Temp Hi-Gard consist of an inner layer of calcium silicate insulation, factory applied to
the required thickness,sealed with polyethylene shield, covered by an outer layer of RICWIL
exclusive inorganic locking agent for strength,and protected by any one of a multitude of
metal jacket materials.

Hi-Temp Hi-Gard’s nonflammable barrier permits its use in all commercial and industrial
environments.Metal jackets of spirally locked seam aluminium, galvanized steel, plastic
coated galvanized steel and stainless steel are available.

These components are factory-assembled including all necessary fittings, such as elbows,
tees, expansion loops, and anchor, so a complete system ready for fast installation is
delivered to your jobsite.

p. 07 / 08
HI-GARD™ PRODUCT DATA
DESIGN CALCULATION

The heat loss per unit length from a uniformly insulated pipe is given by :

Heat Flow Rate,





Outside Surface Temperature

Q'

sT = a +T
pfD2
Where :
Q’ heat loss per lineal metre of pipe per second ( W/m )
Tp surface temperature of pipe ( °C )
Ts outer surface temperature of insulation or cladding
°C
Ta ambient air temperature (°C )
KA thermal conductivity of insulation ( W/m °K )
D2 diameter of outer surface of insulation ( m )
D1 outer diameter of pipe ( m )
f surface heat transfer coefficient ( W/m² °K )
PREINSULATED HI-GARD PIPE DATA

Gal Steel Jacket thk : 101mm - 318mm :- 0.5mm


381mm - 813mm :- 0.6mm
PU Density : STD 15mm - 600mm @ 45kg/m³

Pipe STD Pipe Pipe Jacket Insulation Heat Weight / Weight


Size OD Size thk Gain/Loss Meter / Meter
(mm) (mm) (mm) (mm) Kcal/h With Without
Water water
API 5L Gr B - 9.5mm 600 609 711 51 -24.32 431.91 158.02
API 5L Gr B - 7.9mm 600 609 711 51 -24.32 411.40 134.50
API 5L Gr B - 9.5mm 550 559 660 50.5 -22.73 373.64 144.83
API 5L Gr B - 7.9mm 550 559 660 50.5 -22.73 354.88 123.34
API 5L Gr B - 9.5mm 500 508 609 50.5 -20.89 319.41 131.65
API 5L Gr B - 7.9mm 500 508 609 50.5 -20.89 302.20 111.90
API 5L Gr B - 9.5mm 450 457 558 50.5 -19.03 269.24 118.47
API 5L Gr B - 7.9mm 450 457 558 50.5 -19.03 254.00 101.01
API 5L Gr B - 9.5mm 400 406 508 51 -17.01 223.12 105.29
API 5L Gr B - 7.9mm 400 406 508 51 -17.01 209.48 89.65
JIS G 3452 Std 350 355 457 51 -15.15 169.20 78.51
JIS G 3452 Std 300 323 431 54 -13.30 136.56 63.51
JIS G 3452 Std 250 273 381 54 -11.54 102.26 51.59
JIS G 3452 Std 200 219 318 49.5 -10.34 70.53 37.50
BS 1387 Class “C” 150 168 279 55.5 -7.62 46.26 27.25
BS 1387 Class “C” 125 141 254 56.5 -6.58 36.60 23.29
BS 1387 Class “C” 100 114 203 44.5 -6.72 26.81 18.40
BS 1387 Class “C” 80 89 177 44 -5.65 18.85 13.83
BS 1387 Class “C” 65 73 152 39.5 -5.30 14.28 10.73
BS 1387 Class “C” 50 60 142 41 -4.52 10.99 8.87
BS 1387 Class “C” 40 48 127 39.5 -4.00 8.00 6.70
BS 1387 Class “C” 32 42 127 42.5 -3.52 7.06 6.12
BS 1387 Class “C” 25 33 115 41 -3.12 5.57 5.02
BS 1387 Class “C” 20 27 101 37 -2.96 4.08 3.74
BS 1387 Class “C” 15 21 101 40 -2.48 3.41 3.23

p. 09 / 10
Quantity Of Foam Required Per Joint ( kg / joint )

Pipe Size Jacket Size PU Thk Straight Elbow Tee Joint Reducer
(mm) (mm) (mm) Joint Joint joint
600 711 51 5.45 9.46 6.83 3.21
550 660 50.5 5.02 8.12 6.23 2.95
500 609 50.5 4.59 6.87 5.35 2.69
450 558 50.5 4.17 5.74 4.53 2.09
400 508 51 3.78 4.76 3.82 1.82
350 457 51 3.36 3.82 3.24 1.63
300 431 54 3.43 3.61 3.11 0.84
250 381 54 3.00 2.79 2.52 1.04
200 318 49.5 2.21 1.79 1.69 0.78
150 279 55.5 2.02 1.41 1.43 0.71
125 254 56.5 1.83 1.16 1.20 0.55
100 203 44.5 1.15 0.66 0.71 0.36
80 177 44 0.96 0.49 0.55 0.28
65 152 39.5 0.71 0.34 0.40 0.22
50 142 41 0.68 0.30 0.36 0.19
40 127 39.5 0.56 0.24 0.30 0.18
32 127 42.5 0.59 0.24 0.29 0.18
25 115 41 0.51 0.20 2.40 0.16
20 101 37 0.39 0.15 0.18 0.10
15 101 40 0.40 0.14 0.18 0.06

Note : Kindly contact Ricwil if you require more information and density more than 45kg/m³

HI-GARD™ HEAT GAIN / LOSS
FOR ABOVEGROUND PIPE

JOB
Temperature rise across 100 metre length of pipe of nominal size 250mm dia

PIPE HEAT GAIN/LOSS CALCULATION ( ABOVE GROUND )

Formula :
Heat Gain/Loss per meter length,


Where :
Q: Heat gain/loss ( Kcal/m.h )
Ti : Fluid temperature ( °C ) 6.0 °C
Ta : Ambient temperature ( °C ) 35.0 °C
D1 : Carrier Pipe I.D. ( m )
D2 : Carrier Pipe O.D. ( m )
D3 : Jacket I.D. ( m )
D4 : Jacket O.D. ( m )
λp : Thermal conductivity of steel ( Kcal/m.h.°C ) 45.00 Kcal/m.h.°C
λi : Thermal conductivity of insulation ( Kcal/m.h.°C ) 0.02 Kcal/m.h.°C
λj : Thermal conductivity of GI Jacket ( Kcal/m.h.°C ) 45.00 Kcal/m.h.°C
a: Surface coefficient of heat transfer ( Kcal/h.°C ) 8.00 Kcal/h.°C for dull metalic
surface still air

Temperature different, dT (F) = Total Heat Gain/Loss ( Kcal/h ) x 3.964 x 20 / Flowrate ( igpm ) /12000

dT Flow PRE-INSULATED PIPE DETAILS Pipe Total Temp


( In/Out ) Rate Pipe Jacket Insulation Length Heat Different
(m) Gain/Loss (°F)
(igpm) Nom I.D. O.D. I.D. O.D. Thk Thk (Kcal/h)
(mm) (mm) (mm) (mm) (mm) (mm) (mm)

10 D1 D2 D3 D4
Ton
( RT )
1000 2000 250 259.8 273 379.8 381 0.6 53.4 100 -1079.76 -0.0036

p. 11 / 12
HI-GARD™ SPECIFICATION
CLAUSE REMARKS REMARKS

1. GENERAL

Aboveground piping system shall be factory preinsulated and prefabricated


RICWIL Hi-Gard and shall consist of steel carrier pipe insulated with rigid
polyurethane foam which is protected with outer jacket.

The preinsulated pipes shall be of a product of manufacturer with ISO


certification and who has been engaged in manufacturing preinsulated
pipes at least for the last 10 years.

The system components shall comform to the following specifications.

2. MATERIAL DESCRIPTION

2.1 Carrier Pipe:


The carrier pipe shall be either of the following :
• Mild Steel Pipe to BS 1387 Medium / Heavy Grade. Specify carrier
• Carbon Steel Pipe to JIS G3452 Standard. pipe
• Carbon Steel Pipe to API 5L Grade B / ASTM A106 Grade B
/ ASTM A53 Grade B.
• ABS ( Acrylonitrile-Butadiene-Styrene ) Pipe to AS3518 /
BS3505 / BS3506 / BS5391 / MS1419.
• PVC ( Polyvinyl Chloride ) Pipe to BS 4346 / MS 628 with
min wall thickness of 3.5mm.
• PPR ( Polypropylene ) Pipe to ISO 15874-2: 2003, ISO
15874-3: 2003, ISO 9001: 2000, EN ISO 3216, ONORM
B 5174, ONORM EN 1254-3 BS 6920, BS 2872, BS 1224,
SIRIM PK 027101, PK027102

All pipes shall be protected by plastic caps or plastic sheet cover

2.2 Insulation:
Insulation shall be rigid polyurethane machine injected and foamed in Insulation
place completely filling the annular space between carrier pipe and jacket. thickness may
Physical properties of polyurethene foam shall be as follows vary
• Density : Minimum 45kg/m3 depending on
• Thermal Conductivity : Metric 0.017 Kcal/m h. °C @ 23 °C geographical
• Compression Stregth: Minimum 2.0 kg/cm (29 psi) area.
• Closed Cell content : Minimum 90%
• Insulation thickness shall be determined considering Specify if higher
condensation foaming on the outer jacket under following density is
climatic condition. required
CLAUSE REMARKS REMARKS
AMBIENT TEMP RH % FLUID TEMP
35 °C 90 6 °C
30 °C 95 6 °C
Note : more detail in PROPRIETARY INFORMATION

Min. insulation thickness shall be as follows


Pipe size up to NB100 mm (4”) : 37 mm (1 1/2 “)
NB 125 mm (5”) and longer : 50 mm (2”)

2.3 Jacket: Specify kind of


The jacket material shall be sufficiently sized to allow for desired jacket.
insulation thickness for optimum performance of system. All metal
jacket shall have an external spiral lockseam. Jacket shall be of the
following materials.
• External spiral lockseamed galvanized steel with following Specify if
thickness Jacket size up to 304mm : 0.5mm (26 gauge) 318mm particular finish is
and larger : 0.6mm (24 gauge) required.
• External spiral lockseamed aluminium : 0.8mm (22 gauge) i.e colour jacket
• External spiral lockseamed stailness steel : 0.5mm (26 gauge) or plastic jacket
Polyvinyle Chloride (PVC) : Min 3mm Class 1 or JIS K6741
• High density extruded polyethylene : Min 3mm comforming to
MS1058 / ISO4427 / DIN8074/75 / EN 253

2.4 Fire Rating of Preinsulated Pipe Unit:


The preinsulated HI-GARD system shall be of a product which has
conducted 2 hours fire test with a temperature in excess 1,000 °C.
Fire Test : FM approved class 4924

3 FIELD JOINTS INSULATION


• The site insulation shall be performed strictly accordance with Where pipe
manufacturer’s instructions and recommendations. The straight expansion and/or
joints, valves and fittings (in case of not-preinsulated fittings), contraction
flanges,expansion joints etc. shall be site insulated and jacketed unless provision is very
otherwise specified. critical, refer to
• A manufacturer’s field service instructor is to be present during critical manufacturer’s
periods of installation. He should be factory trained and technically recommendation
qualified to determine whether or not the installation is being made in and
accordance with the manufacturer’s recommendation. engineering
instruction.
The insulation shall be a rigid polyurethane foam preterably of the same source
as the pipe foam and completely fill the annular space between carrier and outer
jacket.

p. 13 / 14
TERRA-GARD™
TERRA-GARD™ PIPING SYSTEM
TERRA-GARD is an underground piping system for distribution
of hot or chilled fluids at temperatures up to 130°C. Every
system is pre-engineered and factory tested before shipment.
Carrier pipe is supplied in customer’s choice of materials which
include steel, copper, stainless steel, aluminium, polyvinyl
chloride (PVC), and fiberglass reinforced plastic (FRP). PVC or
H.D.P.E. jacketing is standard, but customer can also specify
jacketing of fiberglass reinforced plastic. Terra-Gard is shipped
in 6 meter or 12 meter random lengths, with 130-150 mm of carrier pipe exposed at unit ends
to facilitate field joining.

TERRA-GARD™ PRODUCT DATA


PREINSULATED TERRA-GARD™ PIPE DATA

Jacket Material : HDPE


PU Density : STD 50mm - 600mm @ 45kg/m³

Pipe STD Pipe Pipe Jacket Insulation Heat Weight/ Weight/
Size OD Size thk Gain/ Meter Meter
Loss
(mm) (mm) (mm) ( Kcal/h ) (With (W/Out
Water) Water)
API 5L Gr B 7.9mm 600 609 710 43.5 -18.56 414.09 137.16
API 5L Gr B 7.9mm 550 558 710 69.0 -12.24 361.17 129.60
API 5L Gr B 7.9mm 500 508 630 54.0 -13.34 306.21 115.94
API 5L Gr B 7.9mm 450 457 560 45.5 -13.60 254.62 101.60
API 5L Gr B 7.9mm 400 406 500 41.0 -13.09 209.70 89.87
JIS G3452 Std -Blk 350 355 500 66.5 -8.40 172.15 81.47
JIS G3452 Std -Blk 300 323 450 57.5 -8.57 136.58 63.66
JIS G3452 Std -Blk 250 273 400 58.5 -7.38 102.76 51.89
JIS G3452 Std -Blk 200 219 315 44.0 -7.47 69.08 35.97
BS 1387 Clss C - Blk 150 168 280 52.0 -5.50 45.75 26.74
BS 1387 Clss C - Blk 125 141 225 38.5 -5.84 34.90 21.59
BS 1387 Clss C - Blk 100 114 200 39.8 -4.92 25.86 17.45
BS 1387 Clss C - Blk 75 89 160 32.5 -4.69 17.47 12.51
BS 1387 Clss C - Blk 65 73 140 30.5 -4.26 13.28 9.73
BS 1387 Clss C - Blk 50 60 140 37.0 -3.37 10.10 7.04
ENGINEERING DATA

Quantity Of Foam Required Per Joint ( kg / joint )

Pipe Size Jacket PU Thk Straight Elbow Tee Joint Reducer


(mm) Size (mm) Joint Joint joint
(mm)
600 710 43.5 4.59 7.97 5.96 2.80
550 710 69.0 7.01 11.33 8.14 3.91
500 630 54.0 4.94 7.40 5.61 2.86
450 630 79.5 6.93 9.55 6.86 0.71
450 560 45.5 3.72 5.12 4.10 1.91
400 560 71.0 5.48 6.92 5.16 2.48
400 500 41.0 2.97 3.74 3.16 1.52
350 500 66.5 4.55 5.17 4.17 2.07
300 450 57.5 3.68 3.87 3.28 0.87
250 400 58.5 3.28 3.05 2.56 1.11
200 315 44.0 1.95 1.57 1.53 0.71
150 280 52.0 1.86 1.30 1.32 0.67
125 225 38.5 1.14 0.72 0.76 0.40
100 225 52.0 1.41 0.80 0.79 0.41
75 160 32.5 0.65 0.33 0.39 0.22
65 160 40.5 0.73 0.35 0.40 0.23
50 140 37.0 0.59 0.26 0.31 0.18

Note : Kindly contact Ricwil if you require more information and density more than 45kg/m³

p. 15 / 16
TERRA-GARD™ HEAT GAIN / LOSS
FOR UNDERGROUND PIPE

JOB
Temperature rise across 100 metre length of pipe of nominal size 600mm

PIPE HEAT GAIN/LOSS CALCULATION ( UNDERGROUND )

Formula :
Heat Gain/Loss per meter length,

Where :
Q: Heat gain/loss (Kcal/m.h)
Ti : Fluid temperature (°C) 5.0 °C 5.0 °F
Ta : Ambient temperature (°C) 30.0 °C
D1 : Carrier Pipe I.D. (m)
D2 : Carrier Pipe O.D. (m)
D3 : Jacket I.D. (m)
D4 : Jacket O.D. (m)
H: Buried depth to C/L of pipe (m) 1.00 m
λp : Thermal conductivity of steel (Kcal/m.h.°C) 45.00 Kcal/m.h.°C
λi : Thermal conductivity of insulation (Kcal/m.h.°C) 0.02 Kcal/m.h.°C
λs : Thermal conductivity of soil (Kcal/m.h.°C) 1.00 Kcal/h.°C

Temperature different, dT (F) = Total Heat Gain/Loss ( Kcal/h ) x 3.964 x 20 / Flowrate (igpm) /12000

dT Flow PRE-INSULATED PIPE DETAILS Pipe Total Temp


(In/Out) Rate Pipe Jacket Insulation Length Heat Different
(igpm) (m) Gain/Loss (°F)
Nom I.D. O.D. I.D. O.D. Thk Thk (Kcal/h)
(mm) (mm) (mm) (mm) (mm) (mm) (mm)

10 D1 D2 D3 D4
Ton
(RT)
1000 2000 600 589.94 609 696 710 7 43.5 100 -1781.84 -0.0061
TERRA-GARD™ SPECIFICATION

CLAUSE REMARKS REMARKS

1. Underground Piping System

All thermally insulated underground piping system shall be RICWIL


TERRA-GARD™ fill-in type without air-gap or approved equal. The thermal
insulating jacket shall be of non-metallic sectional factory peinsulated and
prefabricated type. It shall be structually strong, water tight and entirely
resistant to corrosive elements normally encountered underground. It
shall consist of the carrier pipe, insulation,jacket, anchors, fittings, wall
seals, expansion provision and field joining materials. TERRA-GARD™
system components shall be of the physical properties shown below. Specify
TERRA-GARD™ system shall be installed strictly in accordance with the Aqualearn leak
manufacturer’s recommendations and instructions. The preinsulated pipes detection system
shall be of the product of the manufacturer who has been engaged in if required.
manufacturing preinsulated pipes for at least the last 10 years.

2. Carrier Pipe

Unless otherwise specified, carrier pipe shall be


either of the following standard. Select most
• API5 LOW B, ASTMA106, ASTM A53 Gr.B Std ERW / seamless black. suitable carrier
• BS 1387 class medium / Heavy pipe.
• For pipe size 26” and larger, carrier pipe shall be API 5L Gr.B SAW.
Minimum wall thickness shall be 9.5mm.

All carrier pipe end shall be bevelled for field welding in accordance with
ASTM or JIS standard and shall be properly protected.

3. Insulation

Insulation shall be polyurethane foam injected by foaming machine


in one continuous process and foamed in place completely filling the
annular space between carrier pipe and jacket. Insulation shall be of
the following characteristics.

3.1 Density
Minimum 45 kg/m³ (4.7 lb/ft³).
3.2 Thermal Conductivity
0.02W /m.°K or 0.017K cal/m.hr.°C



p. 17 / 18

CLAUSE REMARKS REMARKS

3.3 Compressive Strength Specify if higher


2.0 kg/cm² (29 psi) density is required.
2.8 kg/cm³ (40 psi) for 50 kg/m³ 50 kg/m³,75 kg/m³
5.0 kg/cm³ (71 psi) for 75 kg/m³
3.4 Closed Cell Content a) 0.021 W/m. °K
Min 90% by volume for 50 kg/ m³
3.5 Insulation Thickness
Insulation thickness shall be selected on economical b) 0023 W/m. °K
bases in such a manner to ensure that heat gain at for 75 kg/ m³
maximum 5°C does not exceed recognized standard.

Pipe size (NB) Thickness


15mm - 300mm 25 mm
350mm and over 35 mm

4. Outer Jacket

Jacket shall be extruded high density polyethylene


tube complying to:

MS 1058 Specify if PVC


ASTM D 1248 TYPE CLASS 3 jacket or other type
JIS K 6761 of jacket is
BS 3284/1967 TYPE 50 desired.
DIN 8074/75
EN 253
ISO 4427

5. Fittings If expansion loop


can not be used
All fittings shall be prefabricated and preinsulated.Prefabricated and because of
preinsulated elbows, loops and tees shall be furnished and installed limited space,
where shown on plans and shall consist of pipe, insulation, and jacket specify bellows or
conforming to the same specification as here in before specified for ball joints or other
straight runs. Expansion loops shall be of proper design in accordance expansion joints.
with stress limits indicated by The Code for Pressure Piping, ANSI
B31.1. Loop piping shall be installed in jacket sUitably sized to handle
indicated pipe movement.



CLAUSE REMARKS REMARKS
ALTERNATE: Where space does not permit, the use of loops,
expansion joints in manholes shall be provided.

6. End Seals and Gland Seals

Terminal ends of jacket inside manholes, pits, or building walls shall be


equipped with End Seals consisting of a heat shrinkable polyethylene
bulk-head installed to the pipe and jacket. Where there is no anchor
within 1.5 meter of a terminal end, jackets shall be equipped with Gland
Seals consisting of a packed stuffing box and gland follower mounted
on a steel plate installed to end of jacket. Terminate all jackets 100
mm beyond the inside face of manhole or bUilding walls to protect any
exposed piping insulation from damp-wall condensation. If pipe is cut
due to field alteration, End-Seal (shipped lose) must be applied prior
to welding of carrier pipe or apply elastmetric compound furnished by
manufacturer.

7. Leak Plates and Rubber Link-Seal

To provide an effective moisture barrier, wall sleeve with leak plate at


building or manhole walls must be provided. Wallsleeve and leakplates
shall consist of steel sleeve and steel plate flange 100 mm larger in
outsidendiameter than the steel wall sleeve. Between jacket and wall
sleeve, rubber LINK-SEAL must be installed to prevent ingress of water
and moisture.

8. Field Joints

Field joint must be performed strictly in accordance with manufacturer’s


recommendations. Straight joints shall be field insulated using
polyurethane foam, split P.E. connector band and polyethylen shrink
sleeve.

p. 19 / 20

CLAUSE REMARKS REMARKS
9. Manufacturer’s Field Installation Instructor

A Manufacturer’s Field Service Instructor is to be present during


critical periods of installation and testing of the system. He should be
factory trained and technically qualified to determine whether or not
the installation is being made in accordance with the manufacturer’s
recommendation. On completion of the installation, the contractor shall
deliver to the owner a certificate from the manufacturer stating that
the installation has been made in accordance with the manufacturer’s
recommendations.

10. Manufacturer’s Shop Drawings

Drawings for approval are prepared by the manufacturer for each


project in accordance with the requirements of the contract plans and
specifications set forth herein. After approval of the drawing
and descriptive brochure, part numbers are assigned to each unit.
These part numbers are shown on the drawing which thus becomes a
shop drawing. Each unit is marked and tagged to correspond with the
part numbers shown on the shop drawing. Shop drawings, with part
numbers, accompany actual shipments.


COPPER-GARD™
COPPER-GARD REFRIGERATION
RICWIL Copper-Gard pipe is a completely factory fabricated,
insulated and jacketed copper piping system for distribution
of domestic hot water and Refrigerant gas lines. Copper-Gard
consists of 2 copper tubes insulated with rigid polyurethane foam
which is protected with outer Jacket.

SINGLE TUBE

MATERIAL DESCRIPTION
DOUBLE TUBE
Carrier Pipe:
The carrier pipe shall be distribution of Refrigerant R22 or R410
in either of the following.
• AS/NZ5 – 1571 Copper Tube
• ASTM B280 Copper Tube
• JIS H3300
• EN 12735-1

INSULATION
Insulation shall be rigid polyurethane machine injected and
foamed in place completely filling the annular space between
carrier pipe and jacket. Min. 25mm ( 1 inch ) insulation thickness
shall be apply.

Properties for the polyurethane foam:


• Thermal Conductivity, K-value : 0.017 Kcal / m. h °C (0.022
W/m.°K)
• Minimum Density : 45 kg/m²
• Compressive Stress : 0.31 N/mm² (33 psi)
• Flexural Strength : 0.36 N/mm² (42 psi)
• Closed Cell content : min 90%
• Water Vapour Permeability : 3.7 PERM-CM (2.2 PERM-IN)

Jacket:
The jacket material shall be sufficiently sized to allow for desired
insulation thickness for optimum performance of system. All
metal jackets shall have an external spiral lockseam. Jacket
shall be of the following materials.
p. 21 / 22
COPPER-GARD PRE-INSULATED COPPER PIPE ( HOT WATER )
Copper-gard Pre-insulated copper pipe shall be factory fabricated
using a Single Machine-Injected System for Polyurethane Foam.

The list of Copper Tube Standard that can be used as the Carrier
Pipe :-
• Copper Tube to BS EN 1057 Class X / Class Y ( Hard Drawn
/ Half Hard ).
• Copper Tube to ASTM B88 Type K / Type L.

Insulation must be machine injected polyurethane foam :


2-component-system for the production of closed cell rigid
foams using R 141b as blowing agent. The foams shall make of
Elastopor MH 4101 with a minimum overall density of 50kg/m³
and with minimum insulation thickness of 25mm.

Properties for the polyurethane foam:


• Thermal Conductivity, K-value : 0.018 Kcal / m. h °C (0.022
W/m.°K)
• Minimum Density : 45 kg/m²
• Compressive Stress : 0.31 N/mm² (33 psi)
• Flexural Strength : 0.36 N/mm² (42 psi)
• Closed Cell content : min 90%
• Water Vapour Permeability : 3.7 PERM-CM (2.2 PERM-IN)

Pre-insulated pipe shall be of a product which conducted FM


approvals construction materials calorimeter which measures a
product’s maximum rate of heat release of 230 Btu/ft2/min. or
less.

Copper-gard Pre-insulated Pipe product is in compliance with the


requirement for BS 476 Part : Part 20 : 1987, BS 476 Part 6 ,Part
7 and Part 12.

Field Joints Insulations


Field joint insulation works must be performed strictly in
accordance with manufacture’s recommendations. Polyurethane
foam material must be the same material with the piping
systems.
PROPRIETARY INFORMATION
RICWIL Low-Temp HI-GARD™
PHYSICAL PROPERTIES METRIC METRIC ASTM TEST
DENSITY 45 kg/m³ 50 kg/m³ D1622
THERMAL CONDUCTIVITY 0.017 Kcal/m.h °C 0.018 Kcal/m.h °C C518
(0.02 W/m °K) (0.021 W/m °K)
COMPRESSIVE STRENGTH 2.0 kgf/cm² 2.8 kgf/cm² D1621

CLOSED CELL CONTENT 90% 91% D2856


WATER VAPOUR PERMEILITY 3.7 PERM-CM 3.5 PERM-CM C355
(2.2 PERM-CM) (2.1 PERM-CM)

Above density is RICWIL’s standard, higher density polyurethane foam is available upon

request.

RICWIL DEW POINT AND POLYURETHANE THICKNESS CALCULATION


HEAT GAIN FORMULA : Q = ( Ta - Ti ) / R

Where R = Total Heat Resistance

Ta = Ambient Temperature

Ti = Fluid Temperature

But R = Ln ( D2 / D1 ) / ( 2 x π x K ) + 1 / (π x D2 x E )

Where D2 = Outer Diameter of Jacket

D1 = Outer Diameter of Carrier Pipe

K = Thermal Conductivity Of Polyurethane

E = Jacket Surface Emission Coeffient

Jacket Surface Temperature Tj = Ta - Q [ 1 / (π x D2 x E ) ]

p. 23 / 24
EXAMPLE 1
AMBIENT TEMPERATURE 30°C

The followings are data for calculation :
K = 0.017 Kcal / m.hr.°C
E = 8
Ta = 30.0°C
Ti = 6.0°C
Tdew = 29.1°C at RH 95% Condition No 1
Tdew = 28.1°C at RH 90% Condition No 1
Tdew = 27.2°C at RH 85% Condition No 2
Tdew = 26.2°C at RH 80% Condition No 3

RICWIL STANDARD THICKNESS PRE-INSULATED PIPES


SIZE RESIS- HEAT/ HEAT Q Tj ( C ) D1 D2 Ln ( D2/D1 ) PU Thk
TANCE M² (mm) (mm)
15 MM 15.02 5.01 1.60 29.37 21.3 101.6 1.56 40.2
20 MM 12.90 5.83 1.86 29.27 26.7 101.6 1.34 37.5
25 MM 11.92 5.57 2.01 29.30 33.4 115.0 1.24 40.8
32 MM 10.63 5.66 2.26 29.29 42.2 127.0 1.10 42.4
40 MM 9.36 6.42 2.56 29.20 48.3 127.0 0.97 39.4
50 MM 8.30 6.48 2.89 29.19 60.3 142.0 0.86 40.9
65 MM 7.13 7.05 3.37 29.12 73.0 152.0 0.73 39.5
80 MM 6.71 6.40 3.58 29.20 88.9 177.8 0.69 44.5
100 MM 5.58 6.73 4.30 29.16 114.3 203.2 0.58 44.5
125 MM 5.65 5.33 4.25 29.33 141.3 254.0 0.59 56.4
150 MM 4.89 5.59 4.91 29.30 168.3 279.4 0.51 55.6
200 MM 3.60 6.69 6.67 29.16 219.1 317.5 0.37 49.2
250 MM 3.23 6.22 7.44 29.22 273.0 381.0 0.33 54.0
300 MM 2.78 6.35 8.62 29.21 323.9 431.8 0.29 54.0
350 MM 2.44 6.85 9.84 29.14 355.6 457.2 0.25 50.8
400 MM 2.17 6.94 11.07 29.13 406.4 508.0 0.22 50.8
450 MM 1.94 7.07 12.39 29.12 457.2 558.0 0.20 50.4
500 MM 1.76 7.12 13.61 29.11 508.0 609.0 0.18 50.5
EXAMPLE 2
AMBIENT TEMPERATURE 35°C
The followings are data for calculation :
K = 0.017 Kcal / m.hr.°C
E = 8
Ta = 35.0°C
Ti = 6.0°C
Tdew = 34.1°C at RH 95% Condition No 1
Tdew = 33.1°C at RH 90% Condition No 1
Tdew = 32.1°C at RH 85% Condition No 2
Tdew = 31.1°C at RH 80% Condition No 3

RICWIL STANDARD THICKNESS PRE-INSULATED PIPES


SIZE RESIS- HEAT/ HEAT Q Tj ( C ) D1 D2 Ln ( D2/D1 ) PU Thk
TANCE M² (mm) (mm)
15 MM 15.02 6.05 1.93 34.24 21.3 101.6 1.56 40.2
20 MM 12.90 7.04 2.25 34.12 26.7 101.6 1.34 37.5
25 MM 11.92 6.73 2.43 34.16 33.4 115.0 1.24 40.8
32 MM 10.63 6.84 2.73 34.15 42.2 127.0 1.10 42.4
40 MM 9.36 7.76 3.10 34.03 48.3 127.0 0.97 39.4
50 MM 8.30 7.83 3.49 34.02 60.3 142.0 0.86 40.9
65 MM 7.13 8.52 4.07 33.94 73.0 152.0 0.73 39.5
80 MM 6.71 7.73 4.32 34.03 88.9 177.8 0.69 44.5
100 MM 5.58 8.14 5.19 33.98 114.3 203.2 0.58 44.5
125 MM 5.65 6.44 5.14 34.20 141.3 254.0 0.59 56.4
150 MM 4.89 6.76 5.93 34.16 168.3 279.4 0.51 55.6
200 MM 3.60 8.08 8.06 33.99 219.1 317.5 0.37 49.2
250 MM 3.23 7.51 8.99 34.06 273.0 381.0 0.33 54.0
300 MM 2.78 7.68 10.42 34.04 323.9 431.8 0.29 54.0
350 MM 2.44 8.28 11.89 33.97 355.6 457.2 0.25 50.8
400 MM 2.17 8.38 13.38 33.95 406.4 508.0 0.22 50.8
450 MM 1.94 8.54 14.97 33.93 457.2 558.0 0.20 50.4
500 MM 1.76 8.60 16.45 33.93 508.0 609.0 0.18 50.5

p. 25 / 26
PROJECT REFERENCES
2007 2008
PROJECT NAME PROJECT NAME
1. One Borneo KK Sabah 1. Clock Tower Penang
2. Brem Mall Kepong KL 2. Tesco Setia Alam Klang
3. Kompleks Warisan Melaka 3. Hotel Singapore
4. Tropicana Medical Centre Kota D’mansara 4. Hotel Melaka
5. Wisma Haniffa KL 5. Sabah Project
6. Wisma Jaya 33 PJ 6. USIM Nilai
7. Gurney Plaza Penang 7. Novatel Kuching
8. Bank Of Commerce KL 8. Solaris Dutamas
9. Mahkamah Syariah Penang 9. KSB Kalong Kemaman
10. Zhulian Industries Penang 10. Finas Ulu Klang KL
11. Sunway Pyramid New Wing PJ 11. USIM Nilai
12. Carefour Melaka 12. Abu Dhabi
13. Wisma Persekutuan Kuching 13. JPS Bkt Tengah Penang
14. Crimson Growth Kl 14. Wisma Persekutuan Melaka
15. Quill Land Cyberjaya 15. Sing Tel Singapore
16. TM Net Cyberjaya 16. Mutiara Rini PJ
17. Al Bukhari Alor Star 17. IKBN Kuala Kubu
18. Tawakal Hospital KL 18. Satyam Cyberjaya
19. Shopping Complex Putra Square Ktn 19. Golden Avenue Kl
20. Dell Cyberjaya 20. Q, Cell Sepang
21. AirPort K.Terengganu 21. Today Market JB
22. PDRM Bukit Aman KL 22. Kingwood Hotel Sarawak
23. Majlis Sukan Negara Bukit Jalil Kl 23. UITM K.Pilah
24. Sutera Mall JB 24. Cyberjaya project
25. Time Square Penang 25. Subang Avenue PJ
26. Hospital B.Mertajam Penang 26. Grand Hall Brunei
27. Digi Centre Shah Alam 27. Solaris Dutamas Kl
28. Ilkap Bangi 28. FAMA Sepang
29. Konica Minolta Melaka 29. Tesco K.Selangor
30. Dun Nusajaya JB 30. AET Pekan Nenas JB
31. UiTM Puncak Alam Shah Alam 31. UITM Sg. Buloh
32. Solaris A1-A4 Kl 32. Westin Langkawi
33. Sarawak Convention Centre 33. Sirim Sepang
34. UEM Nusajaya JB 34. Tmn Ilmu K.Terengganu
35. Goldis Tower KL 35. Micasa Hotel KL
36. The Spring Shopping Mall Kuching 36. Kluang Mall Johor
37. Bank Negara KL 37. Mydin Melaka
38. Politeknik Muadzan Shah Kuantan Pahang 38. Sheraton Hotel Kuching
2009 2010
PROJECT NAME PROJECT NAME
1) Hyatt Hotel , KK Sabah 1) Newcasttle University
2) Likas Hospital , Sabah 2) KDN JLN Duta KL
3) Anti Dadah Sepang SEL 3) Naza HQ KL
4) Argo Bank Bangi SEL 4) Instep , KT Terrengganu
5) Micasa Hotel KL 5) UE3
6) Intel Kulim 6) Uitm Sg. Buloh Infra
7) Mahkamah Kajang 7) UPM , Pekan Pahang
8) Sekolah Besut 8) Jab. Kesihatan Petrajaya , Sarawak
9) TGV Wangsa Maju KL 9) Perjabat Tanah & Galian , Kuantan
10) UTHM , Batu Pahat Johor Pahang
11) Wisma Persekutuan Melake 10) Grand Hyatt Hotel , KL
12) Yayasan Melake 11) Wisma Perwira, KL
13) SINGTEL 12) ACC KL
14) CTRM , Melake 13) Tesco Seremban , negeri Sembilan
15) Tabung Haji Office KL 14) Tesco Setiawan , Perak
16) Empire Tower KL 15) IPD , Jasin Melake
17) Hospital Seremban 16) Shah Alam Hospital , SEL
18) Kuantan Hotel & Convention , Pahang 17) USIM , Nilai Negeri Sembilan
19) UPM Serdang , SEL 18) KHEDN , Johor
20) Mara HQ KL 19) UTHM ( FKAAS ) Bt. Pahat Johor
21) Hospital Alor Gajah 20) Permai Hospital , Johor
22) IKBN KKB SEL 21) Konica Factory , Melake
23) TRW Boulevard Cyberjaya 22) The Cruve Plant extention SEL
24) Akrib Negara Kuantan Pahang 23) KDN , JLN Duta KL
25) Kompleks FAMA KLIA 24) Capital Square KL
26) F & N Parcel B 25) UITM Shah Alam SEL
27) F & N CC Shah Alam 26) UUM Sintok
28) UMS , KK Sabah 27) TGC Kepong KL
29) KWDI Cyberjaya SEL 28) South Sea Hotel KK Sabah
30) UIA Library Block , Kuantan Pahang 29) Cyberjaya Infra
31) UIA Dentistry , Kuantan Pahang 30) JPJ , Kuantan Pahang
32) HP Cyberjaya
33) Hospital Alor Gajah
34) Creative centre Cyberjaya SEL

p. 27 / 28
JKR PROJECT commercial PROJECT
PROJECT NAME PROJECT NAME
1 PARLIAMENT HOUSE 1 1-Utama Shopping Complex Ph1
2 DEWAN UNDANGAN IPOH &2
3 DEWAN UNDANGAN MELAKA 2 Alam Warisan , Putrajaya
4 MAHKAMAH SYARIAH, IPOH 3 Altera R & D Center, Penang
5 MAHKAMAH SYARIAH, JB 4 Amcorp, Mall
6 KLIA MAS CATERING BUILDING 5 ASM Factory, Pasir Gudang
7 KLIA CARGO 6 Awana Genting Hotel
8 KLIA INFRA 7 Ampang Puteri Hospital
9 KLIA MAIN TERMINAL 8 Carsem Semiconductor, Ipoh
10 KLIA CONTACT PIER Perak
11 KLIA SATELLITE 9 Chippac Semiconductor
12 KLIA CONTROL TOWER 10 Chung Hwa Picture Tube
13 KLIA CUSTOM 11 Cubic Electronic
14 KUCHING AIRPORT 12 Curtin University
15 NEW BINTULU AIR PORT 13 Damansara Specialist Hospital
16 TANJUNG PELEPAS PORT 14 Gardenia Shah Alam
17 BINTULU PORT 15 Genting Fist World Hotel
18 SIBU PORT 16 Gaint, Cheras
19 PUTRAJAYA PARCEL A 17 ILP, Nibong Tebal
20 PUTRAJAYA PARCEL B 18 Impiana Hotel KL
21 PUTRAJAYA HOSPITAL, 19 Infineon Technology
PUTRAJAYA 20 Jaya Jasco, JB
22 PUTRAJAYA HEALTH CLINIC 21 Jaya Jasco, Klang
23 PUTRAJAYA BALAI BOMBA 22 Johor Specialist Hospital
HEAQQUARTER 23 KLCC Conventional Center
24 PUTRAJAYA BALAI POLIS 24 Pan Pacific Hotel
HEAQQUARTER 25 Rhiga Hotel
25 PUTRAJAYA SUB-PARCEL E16 26 Ritz Carlton
26 PUTRAJAYA SUB-PARCEL E6, E7, 27 Sabah Medical Center
E10, E11
28 Shangri-La Hotel, Sabah
27 PUTRAJAYA ISTANA SELANGOR
29 Sony Electronic, Penang
28 PUTRAJAYA 2C1
30 Standard Chartered Bank KL
29 PUTRAJAYA 2G1 (MOE)
31 Sunway Pyramid Ph1 &2
30 PUTRAJAYA LRT STATION
32 Tanjung Pelepas Port
31 PUTRAJAYA 2G5 & 2G6
33 Tung Shin Hospital
32 PUTRAJAYA CONVENTION HALL
34 Westin Hotel
35 Piccolo Hotel
36 Equatorial Hotel
37 Hilton and Mediterranean
Hotel KL
CERTIFICATES

MS ISO 9001:2008 CERTIFICATE FM APPROVED CERTIFICATE

Manufacturing licence Manufacturing licence


Mixing and blending of polyol Preinsulated pipes

p. 29 / 30
In addition to our principal areas of
activity, RICWIL provides a variety range of
services. Kindly contact us if you require
more information about THESE services.

OTHER SERVICES

• Spray PU System
• Hot and Cold Thermal Insulation

TRADING ACTIVITIES

• Brush Cleaning System for Chiller


Condensor
• Rickard Variable Air Volume (VAV)
Diffusers
• Pipes, Fittings, Valves and Accessories
for HVAC Industry
No. 122, Jalan 2D, Kampung Baru Subang,
Seksyen U6, 40150 Shah Alam,
Selangor Darul Ehsan,
Malaysia

Tel : 03-7847 3377 / 03-7847 5709


Fax : 03-7847 5103 / 03-7847 4622
www.ricwil.com