Академический Документы
Профессиональный Документы
Культура Документы
P2JN RIAU
PROJECT : PEKERJAAN PENYELIDIKAN TANAH
LOCATION
START
:
:
RUAS JALAN TEMPULING - TEMBILAHAN KM 264+720, PROVINSI RIAU
23 Juli 2018 BORING MACHINE : YBM S 01
BORE HOLE
NUMBER 01
FINISH : 25 Juli 2018 DRILL MASTER : H. NABABAN Company Name
TOTAL DEPTH : 40,45 METER LOGGED BY : H. NABABAN
CORETEAM P2JN RIAU
FINAL GWL : PASANG/SURUT CHECKED BY : PATUH SEMBIRING, ST
End of Depth (M)
N / 15 cm
N / 15 cm
N / 15 cm
ROCK/SOIL (M)
SOIL SAMPLE
NO.OF BLOW
TICKNESS OF
SOIL TYPE
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Timbunan Pasir, Coklat.
1,00 1,00
PASANG/SURUT
"01 "01
"02 "02
- - 1 1
Lempung Campur Lapukan Kayu, Hitam, Plastis
"03 Sedang, Kekakuan Sangat Lunak, Kadar Air "03
23 Juli 2018
Sedang.
"04 "04
- 1 1 2
4,00 5,00
"05 "05
UDS
"06 "06
- 1 1 2
"07 "07
"08 "08
1 1 1 2
"09 "09
"10 "10
Lempung Lunak, Abu-abu Gelap, Plastis Sedang, 1 1 1 2
"11
Kekakuan Sangat Lunak, Kadar Air Sedang. "11
"12 "12
1 1 2 3
"13 "13
"14 "14
1 1 2 3
"15 "15
UDS
11,00 16,00
"16 "16
1 2 3 5
24 Juli 2018
"17 "17
"18 "18
2 3 3 6
"19 "19
"20 "20
Lempung Berlanau, Abu-abu Cerah, Plastis Sedang, 2 3 4 7
Kekakuan Sedang, Kadar Air Sedang.
"21 "21
UDS
"22 "22
3 3 4 7
"23 "23
"24 "24
3 4 5 9
9,00 25,00
"25 "25
"26 "26
14 16 23 39
"27 "27
25 Juli 2018
"29 "29
"30 "30
15 19 21 40
Legend :
LOCATION
START
:
:
RUAS JALAN TEMPULING - TEMBILAHAN KM 264+720, PROVINSI RIAU
23 Juli 2018 BORING MACHNIE : YBM S 01
BORE HOLE
NUMBER 01
FINISH : 25 Juli 2018 DRILL MASTER : H. NABABAN Company Name
TOTAL DEPTH : 40,45 METER LOGGED BY : H. NABABAN
CORETEAM P2JN RIAU
FINAL GWL : PASANG/SURUT CHECKED BY : PATUH SEMBIRING, ST
End of Depth (M)
N / 15 cm
N / 15 cm
N / 15 cm
ROCK/SOIL (M)
SOIL SAMPLE
NO.OF BLOW
TICKNESS OF
SOIL TYPE
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
40
"31 "31
"32 "32
Pasir Halus Berlanau, Abu-abu Gelap, Plastis 15 20 23 43
"34 "34
17 21 25 46
25 Juli 2018
10,00 35,00
"35 "35
"36 "36
22 26 34 60
"37 "37
Pasir Halus Berlanau, Abu-abu Gelap, Tidak
"38
Berplastis, Kepadatan Sangat Padat, Kadar "38
Air Rendah. 21 27 33 60
"39 "39
"40 "40
5,45 40,45 23 28 32 60
"41 "41
"43 "43
"44 "44
0 0 0
"45 "45
"46 "46
0 0 0
"47 "47
"48 "48
0 0 0
"49 "49
"50 "50
0 0 0
"51 "51
"52 "52
0 0 0
"53 "53
"54 "54
0 0 0
"55 "55
"56 "56
0 0 0
"57 "57
"58 "58
0 0 0
"59 "59
"60 "60
0 0 0
Legend :
LOCATION
START
:
:
RUAS JALAN TEMPULING - TEMBILAHAN KM 264+720, PROVINSI RIAU
18 Juli 2018 BORING MACHINE : YBM S 01
BORE HOLE
NUMBER 02
FINISH : 22 Juli 2018 DRILL MASTER : H. NABABAN Company Name
TOTAL DEPTH : 60,45 METER LOGGED BY : H. NABABAN
CORETEAM P2JN RIAU
FINAL GWL : PASANG/SURUT CHECKED BY : PATUH SEMBIRING, ST
End of Depth (M)
ROCK/SOIL (M)
N / 15 cm
N / 15 cm
N / 15 cm
TICKNESS OF
SOIL SAMPLE
NO.OF BLOW
SOIL TYPE
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
0
Pasir, Coklat.
1,00 1,00
PASANG/SURUT
"01 "01
Lempung Campur Lapukan Kayu, Hitam, Plastis
"02 Sedang, Kekakuan Sangat Lunak, Kadar Air "02
- - 1 1
2,00 3,00
Sedang.
"03 "03
"04 "04
- - 1 1
"05 "05
18 Juli 2018
UDS
"06 "06
- 1 1 2
"07 "07
"08 "08
- 1 1 2
"09 "09
"10 "10
- 1 1 2
"11 "11
UDS
"12 "12
Lempung Lunak, abu-abu Cerah, Plastis Sedang, 1 1 1 2
"13
Kekakuan Sangat Lunak, Kadar Air Sedang. "13
"14 "14
1 1 1 2
"15 "15
"16 "16
1 1 2 3
"17 "17
19 Juli 2018
"18 "18
1 2 2 4
"19 "19
UDS
"20 "20
2 2 3 5
"21 "21
19,00 22,00
"22 "22
2 3 4 7
"23 "23
Lempung Lanau, Abu-abu Gelap, Plastis Sedang ke
Tinggi, Kekakuan Sedang, Kadar Air Sedang.
"24 "24
2 3 5 8
3,00 25,00
"25 "25
"26 "26
47
20 Juli 2018
14 23 24
"27 "27
Pasir Sedang ke Kasar, Abu-abu Cerah, Tidak
Berplastis, Kadar Air Sedang ke Tinggi, Kepadatan
"28 "28
padat. 12 22 23 45
"29 "29
"30 "30
8 12 18 30
Legend :
LOCATION
START
:
:
RUAS JALAN TEMPULING - TEMBILAHAN KM 264+720, PROVINSI RIAU
18 Juli 2018 BORING MACHNIE : YBM S 01
BORE HOLE
NUMBER 02
FINISH : 22 Juli 2018 DRILL MASTER : H. NABABAN Company Name
TOTAL DEPTH : 60,45 METER LOGGED BY : H. NABABAN
CORETEAM P2JN RIAU
FINAL GWL : PASANG/SURUT CHECKED BY : PATUH SEMBIRING, ST
End of Depth (M)
ROCK/SOIL (M)
N / 15 cm
N / 15 cm
N / 15 cm
TICKNESS OF
SOIL SAMPLE
NO.OF BLOW
SOIL TYPE
DEPTH (M)
DEPTH (M)
G.W.L (m)
GRAPH
DATE
CM
N - VOLUE
N1 N2 N3 10 20 30 40 50 60 70
PHOTO OF CORE
30
9 13 18 31
33,00 33,00
"33 "33
"40 "40
5 9 11 20
"41 "41
21 Juli 2018
"44 "44
8 9 12 21
6,00 45,00
"45 "45
"46 "46
10 12 14 26
"47 "47
Lempung Kaku, Coklat, Plastis Sedang ke Tinggi,
"48
Kekakuan Sangat Kaku, Kadar Air Sedang. "48
12 14 16 30
"49 "49
5,00 50,00
"50 "50
5 8 8 16
Pasir Berlanau, Abu-abu Cerah, Plastis Sedang,
"51 "51
Kepadatan Sedang, Kadar Air Sedang.
2,00 52,00
"52 "52
0,50 52,50 Pasir Sedang Berlanau, Abu-abu Cerah, Tidak 15 24 28 52
"53
Berplastis, Kepadatan Padat, Kadar Air Rendah. "53
Pasir Sedang Berlanau, Abu-abu Cerah, Plastis
22 Juli 2018
"54
1,50 54,00 Rendah, Kepadatan Sedang, Kadar Air Sedang. "54
0,50 54,50 Pasir Sedang Berlanau, Abu-abu Cerah, Tidak 10 18 23 41
"55
Berplastis, Kepadatan Padat, Kadar Air Rendah. "55
"56 "56
6 8 12 20
"57 "57
Pasir Sedang Berlempung, Abu-abu Cerah, Plastis
Rendah, Kepadatan Sedang, Kadar Air Sedang ke
"58 "58
Tinggi. 7 12 10 22
"59 "59
"60 "60
5,95 60,45 8 10 15 25
STOP BOR
Legend :