Вы находитесь на странице: 1из 1

WINDOW OR

DOOR OPENING 200 MM MIN.


12MM Ø @ 400 MM 0.C.
GENERAL NOTES/ STRUCTURAL DESIGN CRITERIA
12MM Ø
14. CUT - OFF BARS
1. WIND FORCE: 2-12MM Ø

WINDOW OPENING
Unless otherwise shown on structural drawins:

WERE OCCURS
Wind Velocity= 175.00 KPH P1 = 1.50 x 0.8 = 1.20 KPa
(

a: TYPICAL FOR ONE WAY SLAB BOND OR LINTEL BEAM


Wind Pressure Basic = 1.50 KPa P2 = 1.50 x 0.5 = 0.75 KPa
(

2-16MM Ø VERTICAL EACH SIDE


OF OPENING
Overall Structure P3 = 1.50 x 0.7 = 1.05 KPa
(

DOOR OPENING
OPEN
P3 C = 0.7 Uplift on Eaves = 1.50 x 2.0 = 30.0 KPa 12MM Ø SILL REINFORCEMENT
WERE OCCURS
P1 = 1.50 x 1.3 = 1.95 KPa
P2 = 1.50 x 1.2 = 1.80 KPa
P1 Wind Pressure P2
P3 = 1.50 x 0.6 = 0.90 KPa TOP OF SLAB
C = 0.8 Coefficient C = 0.5
FOOTING OR BEAM
2. SEISMIC FORCE:V = Z I C / R X WZ = 0.40C = 2.75 2-16MM Ø DOWELS EACH SIDE
OF OPENING
I = 1.00R = 5.00 W 1.19 1.19 1.19
3 . LIVE LOAD
b :TYPICAL DETAIL OF STAGGERED LAP SPLICES FOR SLAB BOTTOM BAR
Second Floor Area = 1.95 KPaRoof Area = 0.958 KPa
REBARS AT CORNER SLAB AND SLAB OPENNING
3 CHB WALL OPENING
S-01
4 . REINFORCED CONCRETE:
NOT TO SCALE
Provide extra reinforcement for corner slabs
Two adjacent discontinous edges
(

)
a . Reinforcing: fy = 275.80 MPab. Concrete: fc = 20.70 MPa
AS SHOWN BELOW AT ENDS & CORNER OF SHEAR WALLS
5 . CONCRETE MASONRY UNIT : fm = 4.83 MPa
6 . METAL : ASTMA36Fy = 2.48 MPa BOLTS : ASTM A325
Welding : E70 Electrodes, Fu = 482.7 MPa
300MM 300MM
7 . ALLOWABLE SOIL BEARING PRESURE:= 100 KPa CORNER SLAB
TYPICAL TYPICAL
8 . LOAD COMBINATION
Dead Load + Live Load = 100 %Dead Load + Live Load + Wind Earthquatke = 133
(

%
9. CONCRETE STRENGTH DESIGN:
1 .4D + 1.7LD - Dead Load
0.75 1.4D = 1.7L + 1.7W L - Live Load
((

))

0.75 1.4D + 1.7L + 1.87E W - Wind Load 15.MINIMUM TIME BEFORE REMOVAL OF FORMS AFTER FOURING
0.9D + 1.3WE - Seismic Load
0.9D + 1.43E Walls-------------------------------- 3 days
10 . CONCRETE COVERING MM
Columns ---------------------------3 days
Beams -----------------------------7 days
CONC. CORNER CONC. TEE
(

Slabs -------------------------------7 days


Sides of Beam ----------------------- 40Suspended Slab
Columns ------------------------------- 40 Top of Slab ------------------------------- 40 16.PIPES AND CONDUITS EMBEDDED IN CONCRETE CONC.COLUMN
Footings ------------------------------- 75 Bottom of Slab -------------------------- 25
Unless otherwise shown on structural drawings or permission of the eEngineer , pipes and other
11 . MINIMUM LAP REQUIREMENTS electrical conduits with their fittings shall not displace more than 4 % of the cross-sectional area of
the column.
MINIMUM LAP REQUIREMENTS METERS
(

BAR f c = 20 MPa f c = 30 MPa


CMU 17.CAMBERING

MM Top Bars of Beams Others Basic Top Bars of Beams Others Basic
(

)
HORIZONTAL REINFORCEMENT
10 0.30 0.30 0.30 0.30 0.60 Unless otherwise specified by the Engineer or Architect , camber are to be provoded for all
suspended R,.C. members, as follows:
12 0.43 0.30 0.43 0.30 0.60
16 0.53 0.38 0.53 0.38 0.60 BEAM --------------------------------------------------------12 MM per 3.05 m
CMU/CONC.
SLABS -------------------------------------------------------12 MM per 3.05 m.
20 0.68 0.48 0.63 0.45 - CANTILEVERED BEAMS & SLABS------------------25 MM per 3.05 m. 3 TYPICAL CONC. CONNECTION
S-01 NOT TO SCALE
22 0.91 0.66 0.81 0.58 -
NOTES :
24 1.24 0.88 1.06 0.76 -
1 . Details shown on this sheets are typical and shall apply to all drawings unless shown or noted otherwise
This Table applicable only if Drawings do not indicate lap requirements 10 MM Ø TIES
. Conform with ACI - 318 requirements unless otherwise 2. Features of construction shown are typical and shall apply generally throughout for similar @ 400 O.C. 10 MM Ø TIES
@ 400 O.C.
indicated. conditions.
3. Slabs on grade shall be poured checker board pattern. Maximum slab width at construction
12 . SIZE OF AGGREGATES TO BE USED:


joints shall be 4.0M in any direction. Allow 7 days minimum interval between adjacent pour.
Maximum sizes of Aggregated to be used for various type of concrete construction: 4. Slabs elevation shall be coordinated with Architectural plans. Provide slab depressions as
MINIMUM REINFORCED HEAVILY LIGHTLY REINF. required for various floor finishes.STRUCTURAL ELEMENT DESIGNATIONS
DIMENSION CONC. WALLS UNREINFORCED REINFORCED OR UNREINFORCED
OF SIZES BEAMS & COL. WALLS SLABS SLAB
2 ½ TO 5" ½ TO ¾ ¾ ¾ TO 1" ¾ TO 1 ½ STRUCTURAL ELEMENT DESIGNATIONS


WALL REINF. TYPICAL
6" TO 11" ¾ TO 1 ½ 1 ½ 1 ½ 1 ½ TO 3"


C
12" TO 29" 1 ½ TO 3" 3" 1 ½ TO 3" 3" 1COLUMNRTRAFTER


WF
30 OR MORE 1 ½ TO 3" 6" 1 ½ TO 3" 3" TO 6"
CMU CORNER CMU TEE


1WALL FOOTINGHTHAFT TRUSS
F
13 . REINFORCING BARS SPLICES 1FOOTINGT1TRUSS
HORIZONTAL REINFORCEMENT
BC BEND UP 150 END OF WALL
a. For Beams: 1BUILT-UP COLUMNC.O.C.CENTER ON CENTER
All splices shall lap or extend a minimum of 40 diameter unless shown otherwise. Vertical bars splice location shall be staggered for beams
and girders splice top bars at mid span, bottom bars at supports. B
1FLOOR BEAMSC1STIFFENER COLUMN
b. For Columns: RB
All splices shall be lapped located near the mid height level. No more than 50 % of the total number of main bars shall be spliced at any 1ROOF BEAMTCTOP CHORD
same level location. 2-10 MM Ø VERTICAL
CMU ENDS JAMBS