Вы находитесь на странице: 1из 3

Sajid ul haq

Electrical Engineer (Power)


Address: Village Hisar Tehsil and post office Daggar distt Buner KPK
Phone No +92-3438937433
Email Address : israrul.haq@yahoo.com
Objective
To work in a competitive environment that effectively utilizes my analytical,
interpersonal, and organizational skills to conceive and achieve solutions.

Education
MS. Electrical engineering (Power and energy) (CGPA 3.37) (Comsats institute
of information technology Islamabad, Pakistan) Year: 2017

B.Sc. Electrical (power) Engineering (CGPA 2.78 or 73%) (Comsats institute of


information technology abbottabad, Pakistan) Year: 2015

FSc (Pre-Engineering) (Marks 74%) Iqra College Buner (BISE Swat), Pakistan.
Year: 2007-2009

SSC (Science) (Marks 76%) GHS School Hisar (BISE Swat), Pakistan. Year: 2005-2007

MS Thesis
Automatic three phase load balancing system:
In three phase distribution system the unbalance phenomena is occur due to single-
phase loads and unequal sharing of loads in each phase. To overcome this problem,
distribution system requires equal sharing of load in each phase. The automatic three
phase load balancing system is possible by the proposed hardware which is micro-
controller and relay based hardware. This hardware is installed in the incoming of
three phase lines and will accordingly switch the domestics load to the least loaded
phase using fast switching relays. The single full house load is connected to that phase
which is least loaded by relay switching ON/OFF. The result of the proposed hardware
and simulation shows that microcontroller and relays switching is effective in reducing
the unbalancing in three phase line and also reducing the current in the neutral wire of
the system. In addition, it retains voltage regulation and stability in the all three phase

Project
Final year project:
Study of High Tension Network in Hazara Division & to Suggest Remedial Measure to
improve Efficiency and Minimize LOSSES.
Semester Projects:
 Simple Flasher project.
 Low fuel indicator
 Power factor improvement of single phase AC motor.
 LED Dice.
 Phone busy indicator project

Page 1 of 3
 Antenna design for modulation
 Motor Speed control through SCR

Internee Engineer (two month)

132 kV grid station Swari, Buner. PESCO (January01, 2013 to March01, 2013)

Internee (4 months)

Pakistan Engineering council (PEC) Islamabad (april14, 2016 to august14, 2016)

Trainee Electrical Engineer (0ne year)


Islamabad electric supply company (IESCO) (August01, 2016 to 30 June,
2017)

Lead and Perform testing/routine maintenance of Transmission and Distribution


substation power equipment, relaying (electro-mechanical, solid state and micro-
processor), pilot channel equipment (power line carrier, pilot wire, transfer , transfer trip,
fiber optic, CVT’s, line tuners, line traps, etc.), controls and communications equipment. 

Sale Engineers (Engineer Brothers)


 To promote the selling of Electrical Equipment, Power Invertor, UPS, Solar
panel etc.

Computer Literacy
 Matlab ,AutoCAD,Proteus,C++,MS Office,PLC,Multisim,Assembly
language,Circuit maker,Mplab

Industrial Visits
One day industrial visits at 500kv or 220kv NTDC grid stations
 One day visit at 500KV Grid station Kohat road Peshawar
 One day visit at 500KV Grid station G8, Islamabad
 One day visit at 220KV Grid station burkhan, Hassan Abdal.

Area of Expertise
Line losses reduction, Substation equipment’s checkup, VAR compensation,
Overloading effect ,Power factor improvement, Transmission and distribution of
line, Generation of power by various sources, Relays operation
Languages (Speak, read, write)
English,Urdu,Pashto

Commendation Certificate

Volley Ball(Runner) session{2007-2008}

Page 2 of 3
SPS College Mingora, Swat
Reference
Available on demand.

Page 3 of 3

Вам также может понравиться