MS. Electrical engineering (Power and energy) (CGPA 3.37) (Comsats institute
of information technology Islamabad, Pakistan) Year: 2017
FSc (Pre-Engineering) (Marks 74%) Iqra College Buner (BISE Swat), Pakistan.
Year: 2007-2009
SSC (Science) (Marks 76%) GHS School Hisar (BISE Swat), Pakistan. Year: 2005-2007
MS Thesis
Automatic three phase load balancing system:
In three phase distribution system the unbalance phenomena is occur due to single-
phase loads and unequal sharing of loads in each phase. To overcome this problem,
distribution system requires equal sharing of load in each phase. The automatic three
phase load balancing system is possible by the proposed hardware which is micro-
controller and relay based hardware. This hardware is installed in the incoming of
three phase lines and will accordingly switch the domestics load to the least loaded
phase using fast switching relays. The single full house load is connected to that phase
which is least loaded by relay switching ON/OFF. The result of the proposed hardware
and simulation shows that microcontroller and relays switching is effective in reducing
the unbalancing in three phase line and also reducing the current in the neutral wire of
the system. In addition, it retains voltage regulation and stability in the all three phase
Project
Final year project:
Study of High Tension Network in Hazara Division & to Suggest Remedial Measure to
improve Efficiency and Minimize LOSSES.
Semester Projects:
Simple Flasher project.
Low fuel indicator
Power factor improvement of single phase AC motor.
LED Dice.
Phone busy indicator project
Page 1 of 3
Antenna design for modulation
Motor Speed control through SCR
132 kV grid station Swari, Buner. PESCO (January01, 2013 to March01, 2013)
Internee (4 months)
Computer Literacy
Matlab ,AutoCAD,Proteus,C++,MS Office,PLC,Multisim,Assembly
language,Circuit maker,Mplab
Industrial Visits
One day industrial visits at 500kv or 220kv NTDC grid stations
One day visit at 500KV Grid station Kohat road Peshawar
One day visit at 500KV Grid station G8, Islamabad
One day visit at 220KV Grid station burkhan, Hassan Abdal.
Area of Expertise
Line losses reduction, Substation equipment’s checkup, VAR compensation,
Overloading effect ,Power factor improvement, Transmission and distribution of
line, Generation of power by various sources, Relays operation
Languages (Speak, read, write)
English,Urdu,Pashto
Commendation Certificate
Page 2 of 3
SPS College Mingora, Swat
Reference
Available on demand.
Page 3 of 3