Академический Документы
Профессиональный Документы
Культура Документы
Product Specification
`
`
CONTENTS
A. Overview…………………………………………………….. 1
B. Features………………………………………….…………… 2
C. Technical Parameters…………………………..…...... 2
D. Product Dimensions…………………………………….. 3
E. Wiring Diagram……………………………………………. 7
F. Installation
Mounting……………………………………………………. 8
Splicing and Termination…………………………….. 9
`
`
OVERVIEW
Page 1 of 11
`
FEATURES
• Elegant Exterior
• Reliable Performance
• Easy Operation and Maintenance
• SC Compatible
• Cold-roll Steel Sheet
TECHNICAL PARAMETERS
IP Rating 55
`
Page 2 of 11
`
DIMENSIONS
12C 400x350x140
24C 400x350x140
36C 400x350x140
48C 400x350x140
72C 450*380*150
96C 450*380*150
Page 3 of 11
`
DIMENSIONS
12 Core
400x350x140mm
24 Core
400x350x140mm
Page 4 of 11
`
DIMENSIONS
36 Core
400x350x140mm
48 Core
400x350x140mm
Page 5 of 11
`
DIMENSIONS
72 Core
450x380x150mm
96 Core
450x380x150mm
Page 6 of 11
`
WIRING DIAGRAM
Page 7 of 11
`
INSTALLATION
A. Wall Mounting
Expansion Screw
WALL
FDU
Page 8 of 11
`
INSTALLATION
Page 9 of 11
`
INSTALLATION
Page 10 of 11
`
INSTALLATION
Page 11 of 11
Report Code: 07-16-0216
TEST REPORT
TEST REPORT
Approve : Liu Yucheng review: Liu Jian Principal inspector: Han Jingjun
GF-KJW 24C fiber distribution Box
1. Frame
NO Conclu-s
TEST ITEM Unit Technical Requirement Test result
. ions
Surface The coating on the surface of a metal box Compliant
should be smooth and clean,color should
uniform.The coating should have good
1 adhesion.
Printing 1The print , mark on the frame should Compliant
Appeara and --- clear ,complete , easier to identify .
nce Marking 2Logo should clean Compliant Qualified
3.The nameplate meets the standard Compliant
4.There should be a record table on the Compliant
door to record the information.
5.Record type should have a sequence , Compliant
like 1, 2, ...,12
General --- 1.Enclosed structure with metal structure Cold rolled
or non-metallic material.Metal material is steel plate
Require cold rolled steel plate or stainless steel
-ments material. SMC materials or engineering
plastics are used for nonmetallic materials
Structure 2.The opening angle of the door is not less Door
than 120 degrees. The gap is not more open:180°
2 than 3mm, It can be opened for 5000 times Gap:2mm
without any damage. Compliant
1. Frame(continue)
NO Conclusio
TEST ITEM Unit Technical Requirement Test result
. ns
General 7.The box must be match the full capacity Compliant
distribute , fiber coiling requirement ,
Require-m should have enough space .
ents 8.There should be a perfect grounding Compliant
-- system in the box
9.For support smart upgrades box , need Compliant
to reserve space for intelligent ODB
control unit.
Size and Capacity Size(H*W*D) Compliant
Structur capacity 12/24 cores 450x380x110
2 e A type 36/48 cores 450x380x150
(continu mm 72 cores 650x460x150
e) Box A type distribution box
structure Function: 1.Have Splicing , wiring , optical
distribute function . 2. support ABS box
type PLC Splitter installation . 3. Zoning
structure , Splicing at left side and fiber
coiling at right side. 4.Support normal Qualified
outdoor cable and flat drop cable . Compliant
5. Cabinet support intelligent upgrading
6. Have outdoor type and indoor type
Structure demand: A type distribution
box have 12 /24, 36 /48 , 72 cores
Optical When optical cable through the hole of Compliant
cable steel panel,should have protection tube
wiring and gasket . The optical cable after
requireme stripped , should add protection tube .
nt drop cable in the box ,allowable benidng
radius cannot less than 15 times of drop
cable . Fiber and pigtail allowable benidng
radius cannot less than 30mm.
12C 1. Can put SC or PC adaptor Compliant
Adaptors 2. Installation 12 C adaptor guide rail
Guide rail should support replace , .
Splicing Size not over : 180mm x 120mm x 16mm Size:
tray Splicing tray capacity is 12c or 24 c 145mm x
105mm
x12mm
GF-KJW 24C fiber distribution Box
Test Report
2. Frame(continue)
NO Conclusi
TEST ITEM Unit Technical Requirement Test result
. ons
Optical After optical cable enters the box, there should Compliant
cable be reliable fixing and protecting devices.After
fasten fixing, the metal armor should be connected to
function the high pressure protection device.
Fiber end -- The termination device of the box should Compliant
connectio facilitate the construction of fiber core and
n function pigtail.At the same time it has the storage
function of the surplus fiber
splicing After fiber splicing with fiber , the spliced part Compliant
Func protection should have plastic tube to provide protection.
3 tion Adjust Through optical connector , it can easier to Compliant Qualified
fiber mm adjust the position of the fiber number and
transfer path .
Fiber If distribution box support optical splitter
distribute function , it should have enough space to Compliant
& splitter install PLC Splitter.
Intelligent A type , B type ,C type distribution box should
Updating support install Intelligent ODB control Compliant
fucntion system ,and also have enough space for data
cable and power cable.
Box and 3. Can put SC or PC adaptor
lock 4. Installation 12 C adaptor guide rail should Compliant
support replace , .
perfo Seal Outdoor should match at least IP55 degree IP55
rman property Indoor should match at least IP53 degree
ce Ground The box should ensure the electrical
property conduction.The box should be reserved for the Compliant
location of the control unit.
4 High pressure protective grounding device
-- should be able to be grounded effectively Compliant
The intercepting area of the grounding wire is 6mm2
not less than 6mm2
Connection terminal cannot less than 35mm2 40mm2
Qualified
Insulated land rent cannot less than 2 x 4MΩ 2.5 x 4M
/500V (DC) Ω
Frame High pressure protection grounding No break,
with frame ≥ 3000V , No breakdown, no no flying
flying arc arc
GF-KJW 24C fiber distribution Box
Test Report
3. Frame(continue)
NO Conclusi
TEST ITEM Unit Technical Requirement Test result
. ons
Mechanical 1. The surface of box should bear 500N Compliant
properties pressure . The box should not be deformed.
2. After opening the door, it should be able to
bear the vertical pressure of not less than
-- 100N at the outer end of the door.3.When the
cable is in, it should be able to withstand no
perf less than 500N tension. After stretching, there
orm should be no loosening of the cable fixed.
anc 4.After the box door is fixed, it should be able
e to withstand the thrust at the center of the
4 outer edge of the box door. The door should Qualified
not be damaged. F=17.62 x W x H
Material -- Metal box: Material thickness not less than
Thickness 1.2mm ,bearing part not less than 1.5mm.
Burning The burning performance of all non-metallic First time:
Mat -- structural parts should meet the YD/T778-2011 1s
erial standards. The samples were heated 2 times
with flame 30s each time.A.The combustion Second
time does not exceed 10s after leaving the time:
5 flame. B.The burning particles dropped from 1s
the experimental samples can not ignite the
bottom layer laid under the test sample.
1. All parts and materials should have Compliant
anti-corrosi -- corrosion resistance.If the material is not
on corrosion resistant, it should be treated with
corrosion protection.
2.After 48 hours of salt spray test in
accordance with the GB/T2433.17-2008 test
method, the metal structure on the surface of
the box body can not be obviously rusted.
6 High Temperature test -- surface should clear and smooth and clear , Compliant Qualified
The color is uniform and without coating
leak .No rust of metal.Plastic parts have no
deformation .
Insulated land rent cannot less than 2 x 4MΩ 2.5 x 4MΩ
/500V (DC)
Frame High pressure protection grounding No break
with frame ≥ 3000V , No breakdown, no No flying
flying arc arc
GF-KJW 24C fiber distribution Box
Test Report
1.Frame (Continue)
NO
TEST ITEM Unit Technical Requirement Test result Conclusion
.
Surface should clear and smooth and Compliant Qualified
clear , The color is uniform and without
Low coating leak .No rust of metal.Plastic
7 Temperature parts have no deformation .
test --- Insulated land rent cannot less than 2 x 2.5 x 4MΩ
4MΩ/500V (DC)
Frame High pressure protection No break,
grounding with frame ≥ 3000V , No no flying
breakdown, no flying arc arc
8 Damp heat test --- Surface should clear and smooth and Compliant Qualified
clear , The color is uniform and without
coating leak .No rust of metal.Plastic
parts have no deformation .
Insulated land rent cannot less than 2 x 2.5 x 4MΩ
4MΩ/500V (DC)
Frame High pressure protection No break,
grounding with frame ≥ 3000V , No no flying
breakdown, no flying arc arc
9 salt spray test --- Surface should clear and smooth and Compliant Qualified
clear , The color is uniform and without
coating leak .No rust of metal.Plastic
parts have no deformation .
Insulated land rent cannot less than 2 x 2.5 x 4MΩ
4MΩ/500V (DC)
Frame High pressure protection No break,
grounding with frame ≥ 3000V , No no flying
breakdown, no flying arc arc
10 Shaking test -- Surface should clear and smooth and Compliant Qualified
clear , The color is uniform and without
coating leak .No rust of metal.Plastic
parts have no deformation .
Insulated land rent cannot less than 2 x 2.5 x 4MΩ
4MΩ/500V (DC)
Frame High pressure protection No break,
grounding with frame ≥ 3000V , No no flying
breakdown, no flying arc arc
GF-KJW 24C fiber distribution Box
Test Report
2. PLC Splitter