Adjustment List Centerline Setting


When Equipment Reference Point Standart Capture current setting during each shift and make
comments as necessary.
No Pictures Adjustment Name (Gauge, Scale, Target
Running / Stopped Sub-section
Display, etc. ) Min Max If NO, Complete Deviation Report

Shift 1

1 Running / Stopped Main Air Supply Air supply Pressure Gauge 6 Bar 8 Bar Shift 2

Shift 3

Shift 1

2 Running / Stopped Decrease Air supply Air supply Pressure Gauge 4,5 Bar 5,5 Bar Shift 2

Shift 3

Shift 1

Below Above
3 Running / Stopped Palten Platen Oil Level Display Middle of Middle of Shift 2
Sight
sight glass Glass

Shift 3

Shift 1

4 Running / Stopped Central Lubrication Central Lubrication Level Display Low Max Shift 2