ACS550-01, Installation
ABB standard drive

eLearning
© Copyright 7/13/2009 ABB.
All rights reserved.
Help

Objectives

After completing this module, you will be able to

„ List the main steps of the installation


„ Describe different installation methods
„ Read and explain power and control cable
connection diagrams
„ Describe the right methods for grounding the cables
„ Perform the insulation resistance measurement for
the motor cable
© Copyright 7/13/2009 ABB.
All rights reserved. - 2 -

„ Use the installation checklist


„ Find technical data for fuse and cable ratings
Help

Prerequisites

Before taking this module

You should have completed the following modules:


„ ACS550 Product specification
„ ACS550 Preparation for Installation
© Copyright 7/13/2009 ABB.
All rights reserved. - 3 -
Help

Main steps of the installation

1. Unpack the drive


2. Mechanical installation
D
of the drive
< 5xD
3. Cable connections
4. Installation checklist
© Copyright 7/13/2009 ABB.
All rights reserved. - 4 -
Help

Unpack the Drive

1. Unpack the drive

2. Remove and save the packing box lid; it contains the


wall mounting template

The package
Open the package more and lift the cover.

Options and
accessories
© Copyright 7/13/2009 ABB.
All rights reserved. - 5 -

Notice the cabling accessories in the


package. Lift the ACS550 by its chassis.
Unpack the Drive Help

Standard Delivery

„ After opening the package, check the contents


against the order / shipping label.
„ Standard delivery
1. ACS550 drive
2. Box containing clamps and connection box (IP21)
3. Assistant Control Panel (ACS-CP-A)
4. Cardboard mounting template
5. Warning stickers

„ Check no parts are damaged


© Copyright 7/13/2009 ABB.
All rights reserved. - 6 -
Help

Mechanical Installation

„ Note that the installation procedures differ between IP


21 / UL Type 1 and IP 54 / UL Type 12 enclosures
„ Tools required for installation
– Screwdrivers
– Wire stripper
– Tape measure
– Drill
– A hole punch for creating conduit mounting holes (optional)
– The appropriate crimping tool for power cable plugs (ACS550-U1, frame
size R6)
– Screws or nuts and bolts
© Copyright 7/13/2009 ABB.
All rights reserved. - 7 -
Mechanical Installation Help

Prepare the Mounting Location

1. Use the mounting template and


mark the mounting points
– Mount on a smooth, vertical, solid
surface
– Heat and moisture-free
– Free space for airflow

2. Drill holes for mounting


© Copyright 7/13/2009 ABB.
All rights reserved. - 8 -
Mechanical Installation Help

Remove the Front Cover


1
1. Remove the control panel, if attached

2. Loosen the captive screw at the top

3. Push side clamps in


2
4. Pull up to lift the cover

3 4
© Copyright 7/13/2009 ABB.
All rights reserved. - 9 -
Mechanical Installation Help

Mount the Drive


1. Position the ACS550 and use screws or bolts to
securely tighten all four corners
2. Attach a warning sticker in the appropriate language
on the inside plastic shell over the existing sticker
© Copyright 7/13/2009 ABB.
All rights reserved. - 10 -
Cable Connections Help

Cable Connections
„ Wiring IP21 / UL type 1 drives requires a conduit or gland kit
„ Instructions in the manual
– For different enclosure and wiring types (conduit or cable)
– Connecting the power, control and motor cables

Additional wiring instructions


© Copyright 7/13/2009 ABB.

ACS550-01/U1 User’s manual (large PDF file)


All rights reserved. - 11 -

See chapters: Installation Š Installing the drive Š Wiring overview


Installation Š Installing the drive Š Install the wiring
Links will open in a new window. This document requires Adobe Acrobat Reader installed.
Cable connections
Connections Help

Cable connections
The drive must be disconnected from the input power during
installation. If the drive is already connected to the input power,
disconnect the input power and wait for 5 min.

1. Prepare the gland box


2. Floating network: Disconnect RFI filter
3. Connect the supply cable
4. Check the insulation resistance level of motor and motor cable
5. Connect the motor cable
6. Install conduit/gland box and tighten the cable clamps.
© Copyright 7/13/2009 ABB.
All rights reserved. - 12 -

7. Connect the analogue and digital control cables


– Make the control cable connection according to
your planned macro
Cable connections
Connections Help

RFI filter
„ For floating networks disconnect internal RFI filter by removing screws:
– EM1/(EM3) on frame size R1-R4
– F1/F2 on frame size R5-R6

R1…R4 R5 F2 R6

F1
F1
F2
© Copyright 7/13/2009 ABB.
All rights reserved. - 13 -

EM1 EM2
(EM2 already removed
in ACS550-U1)
Cable Connections Help

Gland box and clamps 1 (2)

1. Open the appropriate knockouts in the gland box


2. Install the cable clamps for the power/motor cables

The gland box with two power cable


© Copyright 7/13/2009 ABB.

and two control cable clamps


All rights reserved. - 14 -

3. Fix the gland box to the drive, but do not


install it with screws
Cable Connections Help

Supply cable connection


1. Strip the cable. If a screened cable is
used, twist the screen into a pigtail.
2. Route cable through the clamp
3. Connect the supply wires and the 3

ground wire to the drive terminals

< 5xD
2

1
© Copyright 7/13/2009 ABB.
All rights reserved. - 15 -

Cable pictures courtesy of Draka NK Cables Oy


Cable Connections Help

Insulation resistance measurement


Do not make any voltage withstand or insulation resistance tests on any part of the drive!

Before motor cable connections are made, check the insulation


resistance of the motor and motor cable.

1. The motor cable must be disconnected from drive output terminals


U2,V2 and W2.

2. Insulation resistance of the motor


cable and motor between each phase
and the Protective Earth (PE) must be
higher than 1 MΩ at 1 kV DC.
© Copyright 7/13/2009 ABB.
All rights reserved. - 16 -

Cable pictures courtesy of Draka NK Cables Oy


Cable Connections Help

Motor cable connection


„ Symmetrical 3-conductor cable with a concentric PE conductor
(or a 4-conductor cable with a concentric shield)
1. Strip the sheathing and twist the screen into a pig-tail.
2. Route the cable through the clamp.
3. Connect the wires to the terminals

D
3

< 5xD
© Copyright 7/13/2009 ABB.
All rights reserved. - 17 -

Cable pictures courtesy of Draka NK Cables Oy


Cable Connections Help

Gland box and clamps 2 (2)


4. Install the conduit/gland box (2 screws) and
tighten the cable clamps
5. Install the cable clamp(s) for the control
cable(s)
4

„ The ACS550 module has no internal fusing.


The supply line should have the correct 5
fuses installed. See the manual for details.

Fusing
© Copyright 7/13/2009 ABB.
All rights reserved. - 18 -

ACS550-01/U1 User’s manual (large PDF file)


See chapter Technical data Š Input Power Connections Š Fuses
Links will open in a new window. This document requires Adobe Acrobat Reader installed.
Cable Connections Help

I/O connection of the default macro (1/2)


Connection diagram:
1 SCR Signal cable shield
2 AI1 Freq./speed reference: 0-10 V (0/4...20mA)
3 AGND Analog input circuit common
•According ABB Standard macro 4 10V Ref. voltage: 10 VDC, max. 10 mA
5 AI2 Not in use by default. 0-10 V (0/4...20mA)
6 AGND Analog input circuit common
7 AO1 Output frequency value: 0-20 mA
8 AO2 Output current value: 0-20 mA
Short circuit jumper
9 AGND Analog output circuit common
between digital input
10 24 V Aux. voltage output: +24 VDC
common and auxiliary 11 GND Aux. voltage output common
voltage output common 12 DCOM Digital input common
terminals 13 DI1 Start/Stop

(PNP connection). 14 DI2 Forward/Reverse


15 DI3 Constant speed selection (see group 12)
16 DI4 Constant speed selection (see group 12)
17 DI5 Ramp pair selection . (see par. 2201)
18 DI6 Not used
19 RO1C
20 RO1A Relay output 1
© Copyright 7/13/2009 ABB.

21 RO1B READY
All rights reserved. - 19 -

22 RO2C
23 RO2A Relay output 2

24 RO3B RUNNING

25 RO3C
26 RO3A Relay output 3

27 RO3B FAULT (-1)


Cable Connections Help

I/O connection of the default macro (2/2)


Analog signal type is selected with switch J1
J1 - DIP switches for analog inputs (two switch types have been used)

AI1: (in voltage position= OFF) = 0(2)…10 V


AI2: (in current position= ON) = 0(4)…20 mA

1 SCR Signal cable shield

2 AI1 Freq./speed reference: 0-10 V (0/4...20mA)


3 AGND Analog input circuit common
4 10V Ref. voltage: 10 VDC, max. 10 mA
5 AI2 Not in use by default. 0-10 V (0/4...20mA)
Signal minimum (0/4 mA) of inputs: 6 AGND Analog input circuit common

„ AI1 is set with parameter 1301 7 AO Output frequency value: 0-20 mA

„ AI2 is set with parameter 1304


© Copyright 7/13/2009 ABB.
All rights reserved. - 20 -

(not used by ABB Standard macro)


Cable Connections Help

Wiring the Controls (1/2)

For protection against interference: 3


– All analog control cables must be shielded
– Do not use common return for different
analog signals.
– Run analog and digital signals in separate
cables

1. Strip control cable sheathing and twist the 1


screen into a pig-tail

2. Route the control cable(s) through the


clamp(s) and tighten the clamp(s). 2
© Copyright 7/13/2009 ABB.

3. Connect the ground screen pig-tail for the


All rights reserved. - 21 -

digital and analog I/O cables at X1-1


Cable Connections Help

Wiring the Controls (2/2)


4
4. Strip and connect the individual
control wires to the drive terminals.
See the Control terminals table in
the manual. 5

5. Attach the conduit/gland box cover


(one screw).
© Copyright 7/13/2009 ABB.

Technical data and tables


All rights reserved. - 22 -

ACS550-01/U1 User’s manual (large PDF file)


See chapters: Installation Š Installing the Drive Š Wiring overview
Technical data ŠControl Connections
Links will open in a new window. This document requires Adobe Acrobat Reader installed.
Cable Connections Help

Installing Options

1. Install the module(s) to the correct slot(s)


„ Slot 1 : Relay Output Extension (OREL-01) OR
Pulse Encoder Interface (OTAC-01)
„ Slot 2 : Fieldbus Adapter Slot 1

2. Tighten the connection with a locking


screw Slot 2

3. Connect the control cables to the option


module according to its manual.

An installed Profibus module


© Copyright 7/13/2009 ABB.
All rights reserved. - 23 -
Help

Installation Checklist
„ Installation environment conforms to the drive’s specifications for ambient conditions.
„ The drive is mounted securely.
„ Space around the drive meets the drive’s specifications for cooling.
„ The motor and driven equipment are ready for start.
„ For floating networks: The internal RFI filter is disconnected (screws EM1 & EM3 or F1 & F2).
„ The drive is properly grounded.
„ The input power (mains) voltage matches the drive nominal input voltage.
„ The input power (mains) connections at U1, V1, and W1 are connected and tightened as specified.
„ The input power (mains) fuses and the mains switch are installed.
„ The motor connections at U2, V2, and W2 are connected and tightened as specified.
„ The motor cable is routed away from other cables.
„ NO power factor compensation capacitors are in the motor cable.
„ The control connections are connected and tightened as specified.
© Copyright 7/13/2009 ABB.

„ NO tools or foreign objects (such as drill shavings) are inside the drive.
All rights reserved. - 24 -

„ NO alternate power source for the motor is connected and no voltage is applied to the output of the
drive.
Help

Re-installing the Cover

1. Align the cover and slide it on

2. Tighten the captive screw

3. Install the control panel


© Copyright 7/13/2009 ABB.
All rights reserved. - 25 -
Help

Applying Power
„ Always install the front cover before
turning power on
1. Apply input power

2. When power is applied to the ACS550,


the green LED is lit

■ The ACS550 will start up automatically at


power-up if the external run command is on.
■ Before increasing the motor speed, check that
© Copyright 7/13/2009 ABB.

the motor is running in the desired direction.


All rights reserved. - 26 -