Approval Report [Project Budget]
covga by =
DECISION ee | tte,
Name + | Remit ES
Posiion: | Hecticol Eng! £ —-
Dept: [MEE “=
Administrative Ho Date [oxmarcn2o70
POR X200301009- SUBCON WORKS TO BE DONEIN YARD Mise
subje _| MODFICATIONS, SUPPLY OF BREAKERS & BUS BARS / AMS
INTEGRATIONS TO SWS INSTALLATIONS
Project Name: MV Alfred Oldendof Project Code: 202012
Nateral/senvee | Wok Nalerai Deacon ‘ay | vow
‘code | order.
TSOP r eeRREE RITCRATES WATSALAMIETO
* ier kof meting, nb code oF sip owner an Baws.
For ESTIMATION Ine
‘bore MteralServiesndudedin quotation: Yes [] Ne: []
rr
timated Cost dal io
syste
(onfmaton by Team Leader ES:
For Busnes Margene: Very and approved by Team Leder
ForcaP:
WFO montismer tan be iratd ano, snd as BUT PHO
(OSF-BNEP-005 Rev.0 1/16(Quoramen Provass)
‘rojet oe and Wor MV Aled Okendortf- 202012 Z
= OR x20%301009 TEM NOs Subconacir Works To Be Donen Yard- YO SUPPLY
BREAKERS, BUS BARS & MODIFICATION OF MSB AC. TO DIAGRAM ISSUE REPORTS
ai Sub-Con serve For, TO SUPPLY BREAKERS, BUS BARS MODINCATION OF M6
{CC-T0 DAGRAM ISSUE REPORTS
udget Estimate
‘Quotation strategy | SubCon Service Engineer
onractHolder | Mr: Haid Noharmed Saf AIZaabi
‘Contact owner [one
Sacaround,
Requirement of tring the Sub-Contractr TO SUPPLY BREAKERS, BUS BARS & MODIFICATION OF MSB ACC TO DIAGRAM
ISSUE REPORTS
Introduction:
Seape OF This Tenders For Sutabe and Competent Subcontractor frm Local or Overseas Sultably Qualed Personne
or TO/SUPPLY BREAKERS, BUS BARS & MODIFICATION OF MSB ACC. TO DIAGRAM & ISSUE REPORTS
‘oman bry-Dock Company {ODC) s One of the Largest and Most Moder Ship Repair Yard in the GCC Reglon. Located
Indu, Oman.
‘he Objective;
Sub-Con Serces; to arrange authorite subcontractor who are able TO SUPPLY BREAKERS, BUS BARS & MODIRCATION
(OF RISB ACC. TO DIAGRAM & ISSUE REPORTS
Maker & Mode:
Maker & Type: SAERNICO
Types of works;
letrical/ Repa/Servicing/Caliration & istumentation sue Report &Certifeate
Ship Repair Genera Scope of Wor; Sub-Con; Calibration / Service. Repai/ssue Report & Certificate:
‘Subcontractor Should Folow O3¢ Work Programming & Safety Poi’
‘+ oismantie and nenew spares (rurcnsed Or Owner Supile
Scope of Work;
‘+ Ensuring Sub-Con itself Must Be ramilar OF OC Present Safety Procedures
{Service inspection /Any Defective Need To Repair) Cetifeat suing
{Work To Be Done Get ApprovlFrom Ship Oumar & Ma/ El Department Head
Attachments:
i
Te Popael Form Page sat2——— ea ————
seers | Steal Sanat eckinke | como
a pa [SS [arth oe [IE |
{Quoranion Proposal)
end User Advice the Jb Requirement has / Cass/ Owner Recommendation) IF Need Any Arrangements Please Inform
To in charge Engineer aay Before
the Outsoures;
Ta Be Clarified By Fad User / the Request (hn Charge Engines)
Submission
1 The Submission Of Hoth The Techical And Commercial Offers hal Be Provided Online On The Governmental
[tendering Webske and ODC's Procurement Portal Fd Ht change Com /Orat
Te Propoeal Form Pago 20f2(Qvor4n0w Provosai)
‘Project Name and No: | MV Alfed OMendorff- 202012 i |
a POR x200801009 ITEM NO.2- Subcontractor Works To Ba Don a Yard = TO SUPPLY
“SPARES, NTEGRATES BWTS ALARIS TO EXISTING AMIS 8 ISSUE REPORT
Secale Sub-Gon service For; TOSUPPLY SPARES, INTEGRATES EWS ALARMS TO EXISTING
k [AMS 8 ISSUE REFORT
ucgt Estimate
Quotation strategy | Sub-Con Service Engineer
contract Holder ‘Me Hard Mohammed Saf I Zab
Contract Owner one.
Sacground:
Requirement of Hiring the Sub-Contactor TO SUPPLY SPARES, INTEGRATES BWTS ALARDYS TO EXISTING AMS & ISSUE
ePoRT
‘Scope O This Tenders For Suitable ar Competent Subcontractor rom Local or Overseas Stay Qualified Personnel
TO SUPPLY SPARES, INTEGRATES BWTS ALARWS TO EXSTING AMS ISSUE REPORT
‘oman br-Dock Company (00¢) s Oreo the Largest and Most Meder Ship Repair Yards inthe GCC Reon Located
tn uqm, Oman,
Ih
‘ub-Con Serves to arange authorze subcontractor who are able TO SUPPLY SPARES INTEGRATES BWTS ALARMS|
TOEXISTING AMS & ISSUE REPORT
Maker & Modst;
‘Maker 8 Type: PRAXIS
ectcal/ Repo/Servicing/Caliration & instrumentation se Report & Certiate
hia Repair er ot Work: Su n Seeleo, ae
+ Subcontretor Should Follow ODC Work Programming Safty Polo's
1 oismantle and Renew Spares (Furchased Or Owner Supplied |
Scope of Work
‘Ensuring Sub-Con tel Must 8 Familiar OF ODC Present Safety Procedures
1 senice inspection /Any Defectve Need To Repalr/ Certiiat suing
{Work To Be Bane Gat Approval rom Ship Owner & Ma/€l Department Head
Requirements / Recommendation:
:7e-Propoet Fon Pago 102— 7 = —
sueconsennce | OS Saab conden
idan
ODCret: ‘once scone vate: | 0105-2020 ‘Agenda tems | Sim-coN seme
(Quoranow Paorosal)
(end User Advice the Job Requirement has /Class/ Owner Recommendation) IfNeed Any Arrangements Please Inform
‘To InCharge Engineer a Day Sere
‘The Reason of Reqwesting the Ousoure
“To Be Clarified by End User / he Requester (n Charge Engineer).
Submission:
The Submision Of Both The Technical And Commercial Offers hall be Provided Onine On The Goveramental
tendering Website and OOC's Procurement Portal 8d, Hips //Www.tbidexchange,Com/Omandeyoch/
(T¢- Proposal Fm Pogo 202oma srbos
senayvo wontons
SES AD TORS TELE E VIDaRUO aS Y
siea IRN antes yor a0 rg muon urea wena
ua z0¥su soranos #60 aos
scunepscunue on Hew
a [see | [omneszon = “|
seen ae
[huao ea sinbou) mate pon won
Sa aa anes SoN
{wepuePIO pouty AN] _-aNWN a
resis ca reece
: lS are eine er ees] a
iC owed) oa ea ae af
NOLLISINDSY Y3IGHO ASVWHONNd
Sosy jeauey | Wing pola poueua | peeMwouUedeG