Академический Документы
Профессиональный Документы
Культура Документы
MV
YEAR 2020
Continuous-overhauling-of-Lifting-
Register-of-Lifting-Apps Regular-insp-of-Lifting-Attachments Pad Eye Register
Apps
Approved by DPA
466021230.xls 1
18.03.2020
Approved by DPA
466021230.xls 2
18.03.2020
E PLAN
Approved by DPA
466021230.xls 3
18.03.2020
Approved by DPA
466021230.xls 4
18.03.2020
JASMUND SHIPPING GMBH
MV
Call Sign IMO Number Date
This is the inventory of all lifting appliances e.g. Crane, A-Frame, Beam, Davit etc.
Boat deck
Gangway Davit N/A N/A
stb/s
Frames 17-24
A-Frame 5.0t 18th April 2019
p/s
N/A
N/A
Date of Test
N/A
N/A
N/A
N/A
Changing of connections(winch
unions) for Hydraulic Pipes of
Provision Crane No 3
Rescue boat-Davit-Release
Hatecke Shore service
hook 5 yearly inspection
Working boat
Cranes N2
In repair
Windlass.
Changing of oil(50 ltr)
Provision Crane N3
Repair/Changing of hydraulic
hose and installation protection 1,00t
for hoses
(reduced 0,9)
Crane N1
Crane N1
1.50t Done by Crew.
Replaced hydraulic hoses for
new ones.
Crane Nr.1
Repairing nipple for grease ball 1.50t Done by Crew.
bearing
Crane Nr.2
Done by Crew.
El. Motor repairing jobs
Crane Nr.1
1.50t Done by Crew.
Replaced wire rope.
Bunker Crane.
Done by Crew
Brake overhauling.
Crane Nr. 4
Done by Crew.
Replaced wire rope.
Crane Nr. 3 1,00t
Done by Crew.
Replaced wire rope. (reduced 0,9)
SWL 5.0t
12.06.2009
Chief Officer
18.06.2009-
03.07.2009
08.07.2009
04.08.2009
17.08.2009 Chief
Engineer
22.08.2009
Chief Engineer
28.04.2010
Ch. Engineer
05.05.2010
Ch. Engineer
15.04.2010
22.05.2010
Ch. Engineer
28.05.2010
Ch. Engineer
23.07.2011
10.06.2010
14.06.2010
05.10.2010
11.11.2010
Ch/Eng.
09.08.2011
Ch.Off.
10.01.2011
29.01.2011
El/Eng, Ch/Eng,
Ch/off.
31.12.2011
Ch. Mate
14.06.2012
Chief Eng.,2nd Eng.
20.06.2012
29.06.2012
08.07.2012
Ch. Eng., 2nd Eng.
27.01.2013
Ch. Mate/Deck dep.
24.04.2013
26-27.06.2013
Ch. Mate
26-27.06.2013
Ch. Mate
29.09.2013
Ch. Mate
Ch. Off.
12-25.11.2013.Ch.
Eng.
Ch. Off.
02.05.2014 Ch.Eng.
14-17.05.2014
Ch.Eng.
04.06.2014
Ch.Off.
04-05.06.2014
Ch.Eng.
07.06.2014
Ch.Off.
04.02.2015
Ch. Off.
19.06.2014
Ch.Off
29.06.2014
Ch.Off
03.07.2014
Ch.Off
08.07.2014
26.10.2014
Ch.Eng
01.11.2014
Ch.Eng
03.11.2014
Ch.Eng
15.12.2014
Master
04.02.2015
Ch.off
02.02.2016
02.02.2016
03.09.2016
Jun-16
20.01.2017
10.12.2018
18.04.2019
17.05.2019
17.05.2019
22.05.2019
23.05.2019
24.05.2019
27.05.2019
28.05.2019
08.07.2019
ENGINE ROOM 2
MUDROOM
AUXILIARY ROOM
ENGINE ROOM 1
MAIN DECK
DRILL DECK
STERN A-FRAME
STARBOARD A-FRAME
Date
29.02.2020
DATE OF LAST
VISUAL NEXT DUE
INSPECTION
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1/29/1900
1 2
19.07.2018
Inspection of loose gear equipment by shore service
Shore service/Marseille
25.04.2019
Annual inspection of accommodation ladder
Inspection by crew
28.05.2019
Annual inspection and load test of gangway.
Shore service (5 years)
18.04.2019 German
GL Annually Inspection of the ship cranes N 1, 2, 3, 4.
Lloyd Surveyor
18.04.2019
GL Annually Inspection of Stern A-Frame
German Lloyd Surveyor
23.11.2019
Ch.Officer
Ch.Officer
Date
Embarkation ladder for life rafts (port/stbd side) renewed the ropes
09th November as per SOS requsted Docking head was released from boatlanding,now
operated boatlanding without docking head(location docking head in Augusta)
New mooring lines replaced August 2017/Anchor chain lockers and brakes maintained
May 2017 (Malta Dry Dock)
Condition Satisfactory
Condition Satisfactory
Condition Satisfactory