Page 1/2 DAILY DRILLING REPORT

18-Feb-20 No: 07

GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. Emad Eldin Waheed Water Depth: 77 ONHIRE DAYS: 6.52
Well Name: AMAL-18 STA Night DRLG. Ahmed Ashraf RKB-MSL: MOVING: 1.52
Location: Gulf Of Suez DRLG ENG Islam Badr RKB-SEA BED: PLANNED DAYS:
Field: AMAL FIELD PET. ENG RKB-THF: 54 FT TODAY NPT, HR: 0
PLATFORM: AMAL-B PLANNED TD: Cumulative NPT, hrs: 0
06:00 Status: RIG CREW CONT'D WORKING ON CLOSING EPHH FINDINGS. Daily Cost, USD: $ 57,580
24Hs Summary: till RIG CREW CONT'D WORKING ON CLOSING EPHH FINDINGS. Cum. Cost, USD: $ 268,879
00:00

24Hs plan: A.F.E:

HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST
Drills run Today: STOP CARDS First aid Cases: JSA
BHA
BHA Number: Length (ft): BHA Wt: Wt. below jar IN MUD: JAR S/N:
Jar in hole (hrs)
Components CIRC. SUB S/N:
CIRC. SUB HR:
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: TEST TIME: Last Csg Depth MD(ft): Off Btm Torque, kft.lb

Run Number: Mud sys: Last Csg TVD (ft): On Btm Torque, kft.lb
Type: Mud type: FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: FLOW LINE TEMP, F current mud wt. Motor RPM
Manufacturer: DEPTH MAASP (psi): 0 Wt on Bit (klbs):
Size (in.): MUD WT - PPG Last BOP Test: Surface RPM:
Serial No: F. VIS.- SEC/Q SCR Pump Information:
Nozzles: RPM 6 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP SPM: 1
Last Run date: YP - lb/100ft2 Pump1 -psi 2
total on-btm(hrs) GEL 10S - lb/100ft2 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: GEL 10M - lb/100ft2 Pump3 -psi Flowrate (gpm):
current run depth: API FILTRATE HPHT Directional Survey Information:
Today on-btm hrs: CAKE API/HTHP- 1/32 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: SAND % (FT) (°) (°) (FT) Sect. FT N/S E/W /100 FT
O

Today ROP (on btm) SOLIDS %


TOTAL on-btm(HRS)

TOTAL footage (FT) OIL %

Total ROP (on btm)


DULL GRADING WATER %
Inner Rows: MP-CCs H2SO4
Outer Rows: O/W %
Dull Charac.: CL-Whole Mud - ppm
Location: WPS (CaCl2)-Mg/L
Bearing Seals: MBT
Gauge: Stability - Volts
Other Dull: KCL %
Reason Pulled:
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 520 90 80 530 0
D/ WATER, BBL 0 0 0 0 0
DIESEL, BBL 315 0 24 291 71
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 0 0 0 0.00 0.0
CEMENT G-NEAT #2 0 0 0 0.00 0.0
CEMENT G-NEAT #3 0 0 0 0.00 0.0
BARITE #1, CU.FT 0 0 0 0.00 0.0
BARITE #2, CU.FT 0 0 0 0.00 0.0
BARITE #3, CU.FT 0 0 0 0.00 0.0

1of2
Page 2/2 DAILY DRILLING REPORT
18/Feb/20 No: 07

Geology Information:
Formation Top in program Actual Formation Top in program Actual
Lithology Lithology
Name: MD/TVDSS MD/TVDSS Name: MD/TVDSS MD/TVDSS
S.Gharib BELAYIM
KAREEM RUDIES

Personnel ON BOARD
Company No. of people Company No. of people
Amapetco 3 SAPESCO 2
EPHH 0 Setcore 1
Amapetco Field 3 SLB W/L 5
RIG ADM-6 49 Gharib S/L 4
Catering 14 Baker Fishing 1
Baker Mud 1 ADES Service 2
TOTAL ON BOARD 85
Time (hh:mm)
OPERATIONS
From To Hrs
0:00 0:00 RIG CREW CONT'D WORKING ON CLOSING EPHH FINDINGS.
** RIG CREW REPLACED OLD SINGLE RAM, OLD HCR HOUSING, WAITNG FOR TESTING AFTER TIGHTENING SAME.
** WELL AM-18 BUILD UP PRESSURE : WHP 720 PSI. ANN PRESS: 170 PSI.

TOTAL 0.0
OPERATION AFTER MIDNIGHT
0:00 6:00 6.0 RIG CREW CONT'D WORKING ON CLOSING EPHH FINDINGS.
** RIG CREW REPLACED OLD SINGLE RAM, OLD HCR HOUSING, WAITNG FOR TESTING AFTER TIGHTENING SAME.
** MD-519 FAILED TO SUPPLY RIG W/ DIESEL DUE TO BAD WEATHER.
** WELL AM-18 BUILD UP PRESSURE : WHP 720 PSI. ANN PRESS: 170 PSI.

TOTAL 6.0

Rental Equipments Onboard


No. Company Description Arrival date Departure date Remarks
1 MMSS Rig positioning 3/Feb/20 14/Feb/20
2 EPHH Rig Inspection
3 SAPESCO TRS 14/Feb/20
4 Gharib Slickline 14/Feb/20
5 Schlumberger Wireline 14/Feb/20
6 Bakerhuges Fishing 15/Feb/20
UNIT PRICE, $
DESCRIPTION 12-Feb-20 13-Feb-20
OPERATING/S.BY

7" P-110, 29, BTC 800 /Jt


Wellhead and Manifold
Tubing-Completion Equipment
Down Hole Equipment (B-PLUG)
MATERIAL TANGIBLE
Casing Cementing Accessories
Mud and Chemicals
Completion Fluid (Incase of Diesel)
Cement and Additives
Bits and coreheads 20000 / Bits
Fuel (85$/bbl) including boats consumpsion 6000/DAY 1275 3825
Water Supply 500/DAY 500 500
Other Material (transportaion,inspection, material)
DRILLING RIG
Drilling Rig rates(RIG Adm-VI) 31000 14854 31000
Catering 60/Person/Day 420 420
Extra Rig Equipment
MATERIAL INTANGIBLE
Csg.,CP & Tbg Services 1000 / Day
Fishing Operator 1200/Day
Fishing Equipmet 2000 /Day
Whipstock (Total Five Days) 65,000 /Job
Mud Logging 500/DAY
Mud Engineering 400/DAY
Cement Operator 1200/DAY
Drlg eng (450$/one Eng) + MWD(Eng. 546 $/day) 1446 /Day
RSS (AUTOTRAK ONLY) 9000/DAY
MWD 900 / Day
Drilling MOTOR ( Stby $ 1744 /Day) 200 /Cir. Hrs
LWD Tripple Combo (Stby $ 1746 /Day ) 4000 / Day
Electric Logs 100,000/Job
PBL Multi Activation Bypass Sub 350/Day
Drilling Jars 200/Day
Solid Removal Equipment & OPERATOR 1000/DAY
Casing Circulating Packer & OPERATOR 600/DAY
Well Completion ENGINEER 1200/DAY
Casing Perforations 420000
CONSULTANT (supervision) 1000/DAY
COIL TUBE & LIFTING 50,000/Job
Rig Inspection 40000/Job
RCT Job (RCT + EMA) 36000/Job
RCT Job (RCT + PTC) 51000 / Job
Gharib S/L 500 /Day
Other Services
AUXILIARY SERVICES
BOATS 15000/DAY
Dp1 AHTS 4500/DAY
RIG MOVE (towing) & POSITIONING 4000/DAY
SEA BED SURVEY (ROV) 15000
Jetty Rental 1000/DAY
12000/DAY (Crew
HELLICOPTER Change)

LOGISTIC SERVICES $

TOTAL WELL COST/ DAY $ $ 17,049 $ 35,745

CUM. WELL COST : $ $ 17,049 $ 52,794


14-Feb-20 15-Feb-20 16-Feb-20 17-Feb-20 18-Feb-20 19-Feb-20 20-Feb-20 21-Feb-20

2720 2125 2295 2125 2040


500 500 500 500 500

31000 31000 31000 31000 31000


420 1440 1440 1440 1440

1200 1200 1200 1200 1200


2000 2000 2000 2000 2000

400 400 400 400

1000 1000 1000 1000


500 500 500 500

4500

1000

12000

$ 37,840 $ 40,165 $ 40,335 $ 40,165 $ 57,580 $ - $ - $ -


$ 90,634 $ 130,799 $ 171,134 $ 211,299 $ 268,879 $ 268,879 $ 268,879 $ 268,879
22-Feb-20 23-Feb-20 24-Feb-20 25-Feb-20 26-Feb-20 27-Feb-20 28-Feb-20 29-Feb-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
1-Mar-20 2-Mar-20 3-Mar-20 4-Mar-20 5-Mar-20 6-Mar-20 7-Mar-20 8-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
9-Mar-20 10-Mar-20 11-Mar-20 12-Mar-20 13-Mar-20 14-Mar-20 15-Mar-20 16-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20 23-Mar-20 24-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20 31-Mar-20 1-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20 8-Apr-20 9-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20 16-Apr-20 17-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20 24-Apr-20 25-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 1-May-20 2-May-20 3-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
4-May-20 5-May-20 6-May-20 7-May-20 8-May-20 9-May-20 10-May-20 11-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
12-May-20 13-May-20 14-May-20 15-May-20 16-May-20 17-May-20 18-May-20 19-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
$ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879 $ 268,879
20-May-20 21-May-20 22-May-20
$ - $ - $ -
$ 268,879 $ 268,879 $ 268,879