Вы находитесь на странице: 1из 10

DAFTAR HARGA DASAR BAHAN / MATERIAL

TAHUN 2019

REGION I REGION II REGION III


NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
I BAHAN PEREKAT
1 Semen (50 kg) sak 70.950,00 125.690,00 66.550,00
2 Semen warna kg 22.530,00 20.470,00 26.190,00
Semen
3 Semen grout kg 31.670,00 32.850,00 31.580,00
4 Mortar instan/ siap pakai kg 31.150,00 32.330,00 31.060,00
5 Lem kayu kg 22.400,00 52.370,00 22.260,00
6 Lem Lem pipa bh 49.330,00 50.080,00 49.170,00
7 Silikon bh 44.440,00 53.260,00 43.780,00
II BAHAN LOGAM BESI, BAJA DAN ALUMUNIUM
8 Baja Tulangan Polos-BjTP 280 kg 13.110,00 14.880,00 12.980,00
9 Baja Tulangan Sirip BjTS 280 kg 11.940,00 13.710,00 11.810,00
10 Baja Tulangan Sirip BjTS 420A kg 13.840,00 15.610,00 13.710,00
Baja
11 Baja Tulangan Sirip BjTS 420B kg 13.900,00 15.660,00 13.760,00
Tulangan
12 Baja Tulangan Sirip BjTS 520 kg 14.260,00 16.030,00 14.130,00
13 Baja Tulangan Sirip BjTS 550 kg 14.580,00 16.340,00 14.440,00
14 Baja Tulangan Sirip BjTS 700 kg 15.620,00 17.390,00 15.490,00
15 Besi tempa m2 574.440,00 576.210,00 574.300,00
16 Besi strip kg 19.840,00 21.600,00 19.700,00
17 Rangka atap baja ringan m2 127.430,00 129.190,00 127.300,00
18 Kawat beton/ bendrat kg 26.610,00 41.900,00 26.430,00
19 Kawat bronjong kg 48.670,00 57.140,00 48.390,00
20 Kawat nyamuk m2 27.620,00 28.030,00 27.450,00
21 Kawat penggantung rangka hollow m 31.470,00 31.660,00 31.450,00
Kawat
22 Kawat harmonika m2 23.350,00 25.870,00 23.050,00
23 Kawat duri m 2.460,00 9.960,00 2.370,00
24 Kawat jaring (wiremesh) kg 11.710,00 13.430,00 11.530,00
25 Kawat las kg 29.750,00 37.710,00 29.570,00
26 Pipa galvanis dia. 1/2" m 47.500,00 147.510,00 36.860,00
27 Pipa galvanis dia. 3/4" m 54.780,00 158.840,00 43.710,00
28 Pipa galvanis dia. 1" m 81.740,00 236.110,00 65.320,00
Pipa
29 Pipa galvanis dia. 1 1/2" m 127.000,00 376.550,00 100.460,00
30 Pipa galvanis dia. 3" m 347.100,00 1.051.290,00 272.200,00
31 Pipa galvanis dia. 4" m 499.920,00 1.507.890,00 392.720,00
32 Besi hollow (50x50x3) mm m 8.260,00 13.470,00 7.710,00
33 Besi hollow (40x40x2) mm m 7.040,00 11.160,00 6.600,00
34 Baja struktur kg 14.220,00 15.930,00 13.820,00
35 Pelat Baja kg 11.450,00 13.160,00 11.270,00
36 Angkur bh 20.340,00 21.450,00 20.160,00
37 Alumunium strip m 5.760,00 7.480,00 5.640,00
38 Baja ringan profil C tebal 0,75 mm Batang 15.940,00 24.000,00 15.080,00
39 Baja ringan profil C tebal 1 mm Batang 17.770,00 26.170,00 16.880,00
40 Rangka Baja ringan reng tinggi 32 mm, tebal 0,45 mm Batang 8.870,00 16.580,00 8.050,00
41 Baja Baja ringan reng tinggi 40 mm, tebal 0,45 mm Batang 9.790,00 17.680,00 8.950,00
42 Ringan Dynabolt, Ø 12 mm, panjang 100 mm Buah 5.510,00 6.630,00 5.400,00
43 Baut drilling screw, 12 x 40 mm Buah 860,00 1.290,00 810,00
44 Baut drilling screw, 10 x 16 mm Buah 810,00 1.060,00 790,00
III BAHAN ALMUNIUM DAN PENGUNCI
45 Kusen almunium 3" m 102.310,00 104.730,00 102.110,00
46 Rangka jendela almunium m 118.800,00 120.150,00 118.710,00
47 Rangka pintu almunium m 296.890,00 299.410,00 296.690,00
48 Kusen & pintu PVC toilet unit 295.310,00 403.250,00 292.150,00
49 Engsel pintu bh 34.090,00 36.660,00 34.090,00
50 Engsel jendela bh 23.590,00 26.190,00 23.590,00
51 Engsel angin bh 19.660,00 19.710,00 13.900,00
52 Door stoper bh 83.830,00 26.370,00 83.830,00
53 Door closer bh 298.650,00 288.750,00 298.650,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
54 Handel Pintu bh 314.430,00 314.530,00 157.310,00
55 Slot tanam bh 130.940,00 113.970,00 130.940,00
56 Kait angin bh 37.720,00 37.750,00 13.110,00
57 Grendel bh 37.720,00 37.760,00 23.580,00
58 Selot pintu Union kecil bh 102.230,00 102.660,00 21.050,00
59 Selot pintu Union besar bh 196.510,00 197.000,00 28.400,00
60 Kunci tanam antik bh 131.020,00 131.390,00 130.980,00
61 Kunci tanam biasa bh 83.890,00 52.840,00 83.880,00
62 Kunci selot bh 83.830,00 83.970,00 83.820,00
63 Kunci silinder bh 261.880,00 261.960,00 104.760,00
64 Kunci lemari bh 28.820,00 28.840,00 28.810,00
65 Spring knip bh 41.910,00 41.940,00 36.670,00
IV BAHAN PELAPIS
66 Plywood tebal 3 mm lbr 73.110,00 96.520,00 62.990,00
67 Plywood tebal 4 mm lbr 86.180,00 117.330,00 75.250,00
68 Plywood tebal 9 mm lbr 158.570,00 228.800,00 131.360,00
69 Plywood tebal 12 mm lbr 235.120,00 329.270,00 210.180,00
70 Phenol film tebal 12 mm lbr 316.300,00 410.450,00 306.280,00
71 Teakwood tebal 3 mm lbr 162.840,00 186.250,00 160.350,00
72 Teakwood tebal 4 mm lbr 196.150,00 227.310,00 192.840,00
73 Formika lbr 135.690,00 143.480,00 132.720,00
74 Multiplek tebal 9 mm lbr 139.430,00 205.990,00 134.020,00
75 Multiplek tebal 12 mm lbr 173.920,00 268.640,00 166.670,00
76 Triplek tebal 3 mm lbr 65.680,00 89.090,00 56.710,00
77 Triplek tebal 4 mm lbr 77.850,00 109.010,00 75.250,00
78 Triplek tebal 9 mm lbr 133.150,00 203.380,00 129.260,00
79 HPL lbr 210.990,00 246.640,00 208.590,00
V BAHAN LANTAI DAN DINDING
80 Keramik 20/20 cm Kotak 88.410,00 94.270,00 88.070,00
81 Keramik 20/25 cm Kotak 87.360,00 99.510,00 83.530,00
82 Keramik 30/30 cm Kotak 91.200,00 125.690,00 90.860,00
83 Keramik 33/33 cm Kotak 105.930,00 129.930,00 103.450,00
84 Keramik 40/40 cm Kotak 110.320,00 143.960,00 109.500,00
85 Plint keramik 10/10 cm bh 11.560,00 11.700,00 11.550,00
86 Plint keramik 10/20 cm bh 13.170,00 13.440,00 13.140,00
87 Plint keramik 10/30 cm bh 28.910,00 29.330,00 28.870,00
88 Ubin warna 20/20 cm Kotak 84.220,00 107.380,00 81.760,00
89 Ubin warna 30/30 cm Kotak 89.460,00 112.610,00 87.000,00
90 Ubin warna 40/40 cm Kotak 107.870,00 163.510,00 101.960,00
91 Ubin granit 30/30 cm Kotak 149.490,00 202.990,00 145.520,00
92 Ubin granit 40/40 cm Kotak 149.490,00 202.620,00 145.520,00
93 Ubin granit 60/60 cm Kotak 210.560,00 311.360,00 193.770,00
94 Ubin granit 80/80 cm Kotak 446.900,00 536.360,00 444.280,00
95 Wallpaper m2 11.540,00 11.590,00 11.530,00
96 Floor hardener kg 71.440,00 74.450,00 71.400,00
97 - Batu paras m2 240.190,00 240.190,00 239.910,00
Batu alam
98 - Batu tempel hitam m2 209.280,00 209.280,00 205.820,00
VI BAHAN PENUTUP ATAP
99 Genteng keramik bh 14.970,00 18.340,00 14.920,00
100 Genteng pelentong besar bh 1.950,00 4.080,00 1.800,00
101 Genteng kodok glasir bh 2.160,00 4.270,00 2.000,00
102 Nok genteng keramik bh 25.180,00 28.830,00 24.940,00
103 Nok genteng pelentong besar bh 2.230,00 4.710,00 2.050,00
104 Nok genteng kodok glasir bh 4.830,00 6.860,00 4.680,00
105 Asbes gelombang besar (92x180) cm x 5 mm lbr 49.990,00 61.660,00 48.750,00
106 Asbes gelombang besar (105x150) cm x 4 mm lbr 43.980,00 58.930,00 42.860,00
107 Nok asbes gelombang besar lbr 75.150,00 82.050,00 74.690,00
108 Genteng beton besar natural bh 4.570,00 10.680,00 4.110,00
109 Nok genteng beton bh 11.420,00 17.530,00 10.960,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
110 Genteng aspal bh 85.590,00 92.900,00 84.810,00
111 Nok genteng aspal bh 47.470,00 48.840,00 47.330,00
112 Atap metal gelombang t 0,35 mm lbr 52.780,00 49.300,00 52.690,00
113 Atap metal gelombang t 0,55 mm lbr 86.320,00 57.820,00 86.240,00
114 Nok almunium standar 40 x 18 cm bh 27.670,00 33.730,00 27.030,00
115 Nok metal atas (U) bh 26.330,00 26.900,00 26.270,00
116 Nok metal atas bulat (C) bh 26.330,00 26.900,00 26.270,00
117 Plastic aerator bh 36.680,00 36.730,00 36.670,00
118 Almunium foil/ sisalation m2 29.460,00 38.360,00 28.510,00
119 Seng BJLS 0,20 gelombang P = 180 cm lbr 54.720,00 57.810,00 54.470,00
120 Seng BJLS 0,20 gelombang P = 300 cm lbr 126.180,00 129.260,00 125.850,00
121 Seng BJLS 0,28 lembaran 40 cm lebar m 19.640,00 22.840,00 19.300,00
122 Seng BJLS 0,28 lembaran 50 cm lebar m 26.970,00 30.170,00 26.630,00
123 Seng BJLS 0,20 lembaran 90 cm lebar m 42.660,00 45.740,00 42.330,00
124 Seng BJLS 0,30 lembaran 40 cm lebar m 19.670,00 22.980,00 19.320,00
125 Seng BJLS 0,30 lembaran 50 cm lebar m 27.000,00 30.310,00 26.650,00
126 Seng BJLS 0,30 lembaran 60 cm lebar m 27.000,00 30.310,00 26.650,00
127 Seng BJLS 0,30 lembaran 90 cm lebar m 42.710,00 46.020,00 42.360,00
VII BAHAN PAKU, MUR, DAN BAUT
128 Paku 1 s/d 3 cm kg 25.910,00 26.190,00 25.730,00
129 Paku 5 s/d 10 cm kg 19.280,00 26.190,00 20.950,00
130 Paku 8 s/d 12 cm kg 18.230,00 20.950,00 18.050,00
131 Paku skrup bh 270,00 270,00 690,00
132 Paku plywood kg 28.700,00 52.370,00 28.520,00
133 Paku asbes bh 1.050,00 1.310,00 1.040,00
134 Paku sumbat bh 1.440,00 1.450,00 1.440,00
135 Paku gypsum kg 30.100,00 31.810,00 30.070,00
136 Dina bolt bh 4.280,00 4.620,00 4.240,00
VIII BAHAN FINISHING
137 Cat kayu kualitas 1 kg 76.910,00 78.560,00 75.580,00
138 Cat kayu kualitas 2 kg 56.480,00 94.270,00 57.610,00
139 Cat dasar meni kayu kg 71.530,00 104.740,00 70.560,00
140 Dempul kayu kg 68.010,00 55.390,00 67.820,00
141 Pernis ltr 90.530,00 103.050,00 79.870,00
142 Melamic ltr 79.110,00 91.630,00 77.770,00
143 Woodstain ltr 92.100,00 104.620,00 90.760,00
144 Wood filler ltr 56.590,00 69.110,00 55.250,00
145 Thinner ltr 50.200,00 62.730,00 39.540,00
146 Teak oil ltr 54.490,00 67.020,00 53.160,00
147 Cat besi kg 79.000,00 91.530,00 77.670,00
148 Cat dasar meni besi kg 49.150,00 61.680,00 47.820,00
149 Cat tembok interior kualitas 1 kg 73.230,00 87.140,00 71.750,00
150 Cat tembok interior kualitas 2 kg 56.190,00 68.870,00 55.990,00
151 Cat tembok eksterior kualitas 1 kg 105.820,00 119.730,00 104.340,00
152 Cat tembok eksterior kualitas 2 kg 88.450,00 81.090,00 88.250,00
153 Cat dasar undercoat/ alkali resisiting primer kg 50.190,00 63.570,00 49.990,00
154 Flinkote kg 32.730,00 46.640,00 31.250,00
155 Plamir tembok acrilyc kg 18.420,00 32.330,00 15.560,00
156 Plamir kayu kg 43.100,00 47.230,00 41.640,00
157 Cat marka (non thermoplastic) kg 20.180,00 21.330,00 20.060,00
158 Cat marka (thermoplastic) kg 26.470,00 27.610,00 26.350,00
159 Amplas lbr 8.120,00 8.480,00 8.080,00
160 Kuas roll bh 33.190,00 36.660,00 33.520,00
161 Kuas ukuran 3,5" bh 14.160,00 14.170,00 12.590,00
162 Kuas ukuran 2,5" bh 11.190,00 11.270,00 10.500,00
163 Kuas ukuran kecil 1" bh 5.260,00 5.330,00 5.240,00
164 Soda api kg 31.850,00 33.560,00 31.660,00
165 Spiritus ltr 21.370,00 23.090,00 21.190,00
166 Minyak bekisting ltr 4.760,00 6.520,00 4.630,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
167 Kape kayu bh 8.800,00 10.520,00 8.620,00
168 Kape tembok bh 7.230,00 15.720,00 7.050,00
IX BAHAN SANITARI
169 Bak mandi (bathtube) standar set 3.919.190,00 4.698.070,00 3.907.760,00
170 Bak mandi fiber glass 0,30 m3 bh 337.390,00 597.020,00 262.170,00
171 Bak mandi fiber glass 0,50 m3 bh 427.690,00 687.320,00 400.080,00
172 Kloset duduk + aksesoris set 2.241.940,00 2.486.730,00 2.011.410,00
173 Kloset jongkok bh 379.440,00 441.060,00 418.960,00
174 Wastafel set 595.840,00 568.430,00 594.650,00
175 Bak cuci stainless steel/ kitchen zink bh 1.290.770,00 1.391.570,00 1.280.050,00
176 Kran kitchen zink bh 316.320,00 311.800,00 316.190,00
177 Urinoir putih set 3.460.700,00 3.603.500,00 3.457.820,00
178 Floordrain bh 26.360,00 27.060,00 26.290,00
179 Tempat sabun tunggal bh 68.230,00 89.030,00 83.800,00
180 Kran air diameter 3/4" atau 1/2" bh 110.040,00 110.100,00 89.090,00
181 Shower set 223.420,00 226.840,00 223.050,00
182 Water drain + asesories set 157.470,00 158.290,00 157.270,00
183 Seal tape bh 7.010,00 10.480,00 3.170,00
184 Ijuk kg 11.360,00 12.970,00 11.230,00
X BAHAN PARTISI DINDING/ PLAFOND
185 Gypsumboard uk. (120 x 240) cm, tebal 9 mm lbr 86.300,00 156.530,00 78.830,00
186 List profil gypsum tebal 5 cm m 44.520,00 49.020,00 44.100,00
187 List profil gypsum tebal 6 - 10 cm m 47.660,00 52.170,00 47.240,00
188 List profil gypsum tebal lebih dari 10 cm m 50.800,00 57.610,00 50.380,00
189 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 66.730,00 83.800,00 63.830,00
190 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 112.700,00 159.520,00 107.720,00
191 Rangka plafond metal furing + aksesoris m2 143.080,00 165.600,00 130.930,00
192 Tepung gypsum kg 17.990,00 63.680,00 13.130,00
193 Cornice coumpound sak 85.890,00 108.740,00 83.460,00
XI BAHAN SALURAN AIR
194 Pipa PVC abu-abu dia. 1/2" btg 38.810,00 41.170,00 38.560,00
195 Pipa PVC abu-abu dia. 3/4" btg 42.710,00 46.000,00 42.360,00
196 Pipa PVC abu-abu dia. 1" btg 54.640,00 59.630,00 54.110,00
197 Pipa PVC abu-abu dia. 2" btg 149.890,00 167.440,00 148.020,00
198 Pipa PVC abu-abu dia. 3" btg 277.580,00 316.170,00 273.470,00
199 Pipa PVC abu-abu dia. 4" btg 405.680,00 469.140,00 398.930,00
200 Pipa PVC putih dia. 1/2" btg 25.020,00 30.900,00 31.430,00
201 Pipa PVC putih dia. 3/4" btg 35.720,00 39.010,00 37.710,00
202 Pipa PVC putih dia. 1" btg 44.870,00 49.850,00 52.370,00
203 Pipa PVC putih dia. 2" btg 98.560,00 116.120,00 115.220,00
204 Pipa PVC putih medium dia. 3" btg 163.060,00 201.650,00 158.960,00
205 Pipa PVC putih tebal dia. 3" btg 221.540,00 260.130,00 230.430,00
206 Pipa PVC putih medium dia. 4" btg 274.750,00 338.220,00 268.000,00
207 Pipa PVC putih tebal dia. 4" btg 368.500,00 431.960,00 382.310,00
208 Stop kran dia. 1/2" bh 21.430,00 21.600,00 21.370,00
209 Stop kran dia. 1" bh 40.630,00 40.800,00 40.580,00
210 Klep diameter 3/4" bh 23.700,00 36.660,00 23.640,00
211 Tangki air 500 Liter bh 1.071.510,00 1.598.510,00 1.015.460,00
212 Tangki air 1000 Liter bh 1.541.650,00 1.646.810,00 1.451.950,00
213 Tangki air 2000 Liter bh 1.854.200,00 3.440.460,00 1.685.490,00
214 Tangki air 2200 Liter bh 2.747.350,00 3.274.350,00 2.691.300,00
215 PVC waterstop lebar 150 mm m 283.270,00 285.410,00 234.920,00
216 PVC waterstop lebar 200 mm m 274.960,00 280.110,00 274.690,00
217 PVC waterstop lebar 230 - 320 mm m 514.900,00 520.050,00 514.360,00
218 Pelampung tangki air otomatis bh 178.250,00 179.020,00 178.170,00
219 Roof drain metal bh 89.190,00 89.530,00 89.110,00
220 Mesin jet pump kap. 250 watt unit 2.629.010,00 2.671.850,00 2.628.350,00
221 Mesin pompa tekan kap. 150 watt unit 745.800,00 797.420,00 740.310,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
XII BAHAN ELEKTRIKAL
222 Box panel PVC isi 4 MCB bh 27.040,00 60.510,00 26.550,00
223 Box panel PVC isi 5 MCB bh 47.920,00 81.380,00 44.360,00
224 Box panel PVC isi 6 MCB bh 47.920,00 81.380,00 44.360,00
225 MCB 4 A bh 63.970,00 57.610,00 63.960,00
226 MCB 6 A bh 52.450,00 52.750,00 51.400,00
227 MCB 10 A bh 51.400,00 57.610,00 51.400,00
228 MCB 25 A bh 59.780,00 55.360,00 59.780,00
229 MCB 40 A bh 71.300,00 42.270,00 71.300,00
230 MCB 63 A bh 41.970,00 42.270,00 41.940,00
231 Lampu TL 5 watt bh 16.100,00 38.760,00 15.930,00
232 Lampu TL 10 watt bh 19.240,00 39.810,00 19.070,00
233 Lampu TL 15 watt bh 19.240,00 67.040,00 19.070,00
234 Lampu TL 18 watt bh 19.240,00 38.760,00 13.980,00
235 Lampu TL 36 watt bh 21.330,00 83.800,00 18.170,00
236 Kabel NYA 2,5 sqmm m 4.910,00 12.570,00 3.370,00
237 Kabel NYA 1,5 sqmm m 3.860,00 9.430,00 2.020,00
238 Kabel NYM 2 x 1,5 sqmm m 12.790,00 12.020,00 12.790,00
239 Kabel NYM 2 x 2,5 sqmm m 18.270,00 14.880,00 18.270,00
240 Kabel NYM 2 x 4 sqmm m 29.230,00 29.440,00 29.210,00
241 Kabel NYM 3 x 1,5 sqmm m 16.440,00 12.720,00 16.430,00
242 Kabel NYM 3 x 2,5 sqmm m 23.720,00 18.550,00 23.720,00
243 Kabel NYM 3 x 4 sqmm m 38.910,00 26.450,00 38.910,00
244 Kabel NYY 3 x 6 sqmm m 3.238.640,00 3.238.880,00 3.238.620,00
245 Kabel NYY 3 x 1,5 sqmm m 921.770,00 921.890,00 921.740,00
246 Kabel NYY 3 x 2,5 sqmm m 1.380.510,00 1.380.600,00 1.380.500,00
247 Kabel NYY 3 x 4 sqmm m 2.235.210,00 2.235.420,00 2.235.200,00
248 Kabel NYY 3 x 6 sqmm m 3.238.640,00 3.238.880,00 3.238.620,00
249 Kabel NYY 3 x 10 sqmm m 921.810,00 922.120,00 921.790,00
250 Kabel NYY 4 x 10 sqmm m 1.380.880,00 1.382.430,00 1.380.830,00
251 Kabel NYFGBY 3 x 10 sqmm m 45.370,00 47.510,00 45.200,00
252 Kabel DX 2 x 10 sqmm m 6.020,00 6.280,00 5.820,00
253 Kabel DX 2 x 16 sqmm m 8.990,00 9.250,00 8.970,00
254 Kabel Ties 15 cm bh 280,00 530,00 80,00
255 Kabel Ties 10 cm bh 220,00 240,00 70,00
256 Kabel telephone 4 x 0,5 mm m 2.310,00 2.380,00 2.300,00
257 Photo Cell 3 Ampere bh 42.170,00 44.420,00 42.480,00
258 Photo Cell 6 Ampere bh 44.780,00 47.030,00 44.570,00
259 Photo Cell 10 Ampere bh 59.440,00 61.700,00 59.240,00
260 Lampu pijar 5 watt bh 10.560,00 10.910,00 7.420,00
261 Lampu pijar 10 watt bh 15.920,00 16.730,00 8.570,00
262 Lampu pijar 25 watt bh 16.800,00 21.250,00 9.410,00
263 Lampu pijar 60 watt bh 16.180,00 18.100,00 8.820,00
264 Lampu pijar 100 watt bh 19.540,00 22.320,00 10.070,00
265 Isolasi listrik bh 48.450,00 19.280,00 48.760,00
266 Saklar tunggal bh 19.390,00 23.700,00 12.520,00
267 Saklar ganda bh 20.960,00 22.750,00 16.950,00
268 Stop kontak bh 22.010,00 23.800,00 13.810,00
269 Outlet TV bh 48.190,00 49.980,00 47.980,00
270 Outlet telephone bh 79.610,00 81.410,00 79.400,00
271 Down light /PLC 13 Watt bh 32.880,00 34.670,00 32.660,00
272 Fitting plafond + lampu SL bh 10.880,00 12.670,00 10.660,00
XIII BAHAN KAYU
273 Balok kayu ulin uk. 10/10 (panjang 4 m) m3 5.416.370,00 5.446.480,00 5.760.700,00
274 Balok kayu ulin uk. 10/10 (panjang 2 m) m3 3.580.800,00 4.713.300,00 5.237.000,00
Balok Ulin
275 Balok kayu ulin uk. 5/10 m3 5.835.330,00 5.237.000,00 5.963.640,00
276 Balok kayu ulin uk. 5/7 m3 6.044.810,00 5.760.700,00 6.284.400,00
277 Balok Balok kayu bengkirai uk. 5/10 m3 4.796.220,00 4.765.670,00 5.760.700,00
278 Bengkirai Balok kayu bengkirai uk. 5/7 m3 4.796.220,00 4.765.670,00 3.665.900,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
279 Balok kayu meranti 5/10 m3 2.331.630,00 2.915.270,00 3.456.420,00
280 Balok Balok kayu meranti 5/7 m3 2.279.260,00 2.915.270,00 3.456.420,00
281 Meranti Balok kayu meranti 5/5 m3 2.645.850,00 3.072.380,00 3.665.900,00
282 Balok kayu meranti 2/3 m3 2.698.220,00 2.711.610,00 3.142.200,00
283 Balok kayu kruing 5/10 m3 2.940.140,00 2.854.170,00 4.189.600,00
284 Balok Balok kayu kruing 5/7 m3 2.940.140,00 2.854.170,00 3.665.900,00
285 Kruing Balok kayu kruing 5/5 m3 3.199.600,00 2.853.120,00 3.665.900,00
286 Balok kayu kruing 2/3 m3 3.201.990,00 2.854.170,00 3.665.900,00
287 Papan kayu ulin 2/20 (panjang 4 m) m3 6.463.770,00 6.493.880,00 6.808.100,00
288 Papan kayu ulin 2/20 (panjang 2 m) m3 4.892.670,00 5.446.480,00 5.237.000,00
289 Papan kayu bengkirai 2/20 m3 5.356.580,00 3.718.270,00 6.284.400,00
290 Papan kayu meranti 2/20 m3 3.511.700,00 3.863.750,00 3.770.640,00
291 Papan kayu kruing 2/20 m3 2.988.000,00 3.316.770,00 3.770.640,00
292 Kayu Galam dia. 8 s/d 10 cm (panjang 4 m) btg 33.210,00 40.590,00 30.670,00
293 Kayu Galam dia. 11 s/d 13 cm (panjang 4 m) btg 48.550,00 61.040,00 44.240,00
294 Bambu dia. 6 s/d 8 cm (panjang 4 m) btg 11.330,00 11.910,00 12.160,00
295 List kayu profil m 13.200,00 13.280,00 13.100,00
XIV BAHAN KUBAH MESJID
296 Bahan stainless steel M2 1.061.620,00 1.109.290,00 1.058.050,00
297 Bahan enamel M2 2.584.650,00 2.646.760,00 2.580.000,00
Kubah
298 Bahan galvalum M2 1.639.310,00 1.692.440,00 1.635.340,00
299 Bahan GRC M2 1.424.640,00 1.460.340,00 1.421.970,00
XV BAHAN BAKAR DAN PELUMAS
300 Minyak tanah / kerosen ltr 11.300,00 11.300,00 11.300,00
301 Bensin/ premium ltr 10.900,00 10.900,00 10.900,00
302 Solar ltr 10.270,00 10.270,00 10.270,00
303 Minyak pelumas/ oli ltr 36.660,00 47.140,00 36.660,00
304 Gas Elpiji kg 7.690,00 12.220,00 7.690,00
XVI BATA, BATU, PASIR DAN BETON
305 Bata Merah Buah 1.240,00 1.680,00 950,00
306 Bata Ringan uk. 7,5 x 20 x 60 cm Buah 13.950,00 26.170,00 12.310,00
307 Ringan uk. 10 x 20 x 60 cm Buah 16.500,00 32.790,00 14.320,00
308 Batu gunung m3 558.620,00 471.330,00 576.070,00
309 Batu Pecah mesin 1/2 m3 610.990,00 523.700,00 642.410,00
310 Batu Batu Pecah mesin 2/3 m3 610.990,00 523.700,00 639.790,00
311 Batu Pecah mesin 3/5 m3 584.800,00 497.520,00 631.940,00
312 Batu Pecah mesin 5/7 m3 610.990,00 523.700,00 631.940,00
313 Abu batu m3 506.250,00 387.540,00 642.410,00
314 Sirtu m3 610.990,00 576.070,00 621.460,00
315 Aggregat Kasar m3 663.360,00 689.540,00 642.410,00
316 Agregat Kelas A m3 590.040,00 502.760,00 621.460,00
Agregat
317 Agregat Kelas B m3 516.720,00 429.440,00 610.990,00
318 Agregat Kelas C / S m3 506.250,00 418.960,00 600.510,00
319 Pasir Beton m3 621.460,00 730.570,00 600.510,00
320 Pasir Pasir Pasang m3 147.690,00 366.590,00 235.670,00
321 Pasir Urug m3 147.690,00 314.220,00 183.300,00
322 Tanah Timbunan m3 47.140,00 170.210,00 78.560,00
Tanah
323 Tanah Timbunan pilihan m3 57.610,00 183.300,00 183.300,00
324 Kecil Buah 2.460,00 20.950,00 2.710,00
Batako
325 Besar Buah 3.270,00 9.550,00 3.710,00
326 Readymix beton fc' 45 MPa, tanpa pompa m3 2.349.710,00 3.010.320,00 2.273.370,00
327 Readymix beton fc' 35 MPa, tanpa pompa m3 2.237.650,00 2.797.910,00 2.168.600,00
328 Readymix beton fc' 30 MPa, tanpa pompa m3 2.183.770,00 2.695.590,00 2.118.240,00
329 Readymix beton fc' 25 MPa, tanpa pompa m3 2.134.070,00 2.603.010,00 2.071.740,00
330 Readymix Readymix beton fc' 20 MPa, tanpa pompa m3 2.089.250,00 2.518.600,00 2.029.820,00
331 Readymix beton fc' 17,5 MPa, tanpa pompa m3 2.097.830,00 2.561.160,00 2.036.850,00
332 Readymix beton fc' 15 MPa, tanpa pompa m3 2.085.790,00 2.514.040,00 2.026.550,00
333 Readymix beton fc' 10 MPa, tanpa pompa m3 2.040.870,00 2.425.040,00 1.984.280,00
334 Readymix beton fc' 7,4 MPa, tanpa pompa m3 2.035.390,00 2.431.880,00 1.979.890,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
335 Aspal Kg 13.990,00 15.120,00 13.900,00
336 Lapis aus AC-WC Ton 2.506.510,00 3.184.910,00 2.455.760,00
337 Lapis antara AC-BC Ton 2.192.290,00 2.870.690,00 2.141.540,00
338 Lapis pondasi AC-Base Ton 2.160.870,00 2.839.260,00 2.110.110,00
339 Aspal Bahan anti pengelupasan Kg 191.430,00 192.850,00 131.210,00
340 Lapis resap pengikat Liter 20.540,00 21.770,00 20.440,00
341 Lapis perekat Liter 20.800,00 22.030,00 20.710,00
342 Lataston lapis aus (HRS-WC) Ton 2.611.250,00 3.289.650,00 2.560.500,00
343 Lataston lapis pondasi (HRS-Base) Ton 2.558.880,00 3.237.280,00 2.508.130,00
XVII BAHAN KACA
344 Kaca blok 20 x 20 bh 27.550,00 33.110,00 26.960,00
345 Kaca blok 30 x 30 bh 34.490,00 47.020,00 33.160,00
346 Kaca buram/kaca es 3 mm m2 144.650,00 157.910,00 143.240,00
347 Kaca buram/kaca es 5 mm m2 267.270,00 289.410,00 264.910,00
348 Kaca bening 3 mm m2 107.990,00 188.540,00 106.580,00
349 Kaca bening 5 mm m2 146.820,00 209.480,00 144.460,00
350 Kaca bening 8 mm m2 584.730,00 620.140,00 580.970,00
351 Kaca riben 3 mm m2 128.940,00 209.480,00 127.530,00
352 Kaca riben 5 mm m2 157.290,00 230.430,00 154.940,00
353 Kaca riben 8 mm m2 637.100,00 672.510,00 633.340,00
354 Kaca riben 10 mm m2 796.410,00 840.800,00 791.690,00
355 Kaca cermin 3 mm m2 212.730,00 225.990,00 211.320,00
356 Kaca cermin 5 mm m2 372.010,00 394.150,00 369.650,00
357 Kaca patri m2 1.993.310,00 2.006.570,00 1.991.900,00
XVIII BAHAN TIANG PANCANG DAN TURAP
358 Diameter 300 mm Kg 15.630,00 16.810,00 15.510,00
359 Tiang Diameter 400 mm Kg 16.020,00 17.670,00 15.840,00
360 pancang Diameter 500 mm Kg 16.360,00 18.420,00 16.140,00
361 pipa baja Diameter 600 mm Kg 16.920,00 19.660,00 16.630,00
362 Diameter 1000 mm Kg 18.040,00 22.160,00 17.600,00
363 Tipe spun pile diameter 300 mm, K-600 M 561.260,00 626.170,00 554.360,00
364 Tipe spun pile diameter 350 mm, K-600 M 625.290,00 709.290,00 616.350,00
365 Tipe spun pile diameter 400 mm, K-600 M 706.950,00 825.950,00 694.300,00
366 Tipe spun pile diameter 450 mm, K-600 M 846.270,00 989.060,00 831.080,00
367 Tipe spun pile diameter 500 mm, K-600 M 1.005.700,00 1.184.200,00 986.720,00
368 Tipe spun pile diameter 600 mm, K-600 M 1.310.210,00 1.548.200,00 1.284.900,00
369 Tiang Tipe square 20x20, K-500 M 244.090,00 309.080,00 231.530,00
370 pancang Tipe square 25x25, K-500 M 326.950,00 415.670,00 320.070,00
371 beton Tipe square 30x30, K-500 M 591.380,00 721.200,00 577.580,00
372 Tipe square 35x35, K-500 M 753.380,00 931.880,00 734.400,00
373 Tipe square 40x40, K-500 M 958.810,00 1.196.800,00 933.490,00
374 Tipe square 45x45, K-500 M 1.381.460,00 1.667.050,00 1.351.080,00
375 Tipe square 50x50, K-500 M 1.439.940,00 1.796.920,00 1.401.970,00
376 Tipe triangel 28x28x28, K-500 M 237.270,00 293.600,00 212.570,00
377 Tipe triangel 32x32x32, K-500 M 255.240,00 317.820,00 250.460,00
378 Corrugate Ukuran (H = 350 mm x Tebal = 120 mm) M 1.271.040,00 1.509.030,00 1.245.720,00
379 Sheet Pile Ukuran (H = 450 mm x Tebal = 120 mm) M 1.588.840,00 1.874.430,00 1.558.470,00
380 K-700 Ukuran (H = 500 mm x Tebal = 120 mm) M 1.669.490,00 1.955.080,00 1.639.120,00
381 Flat Sheet Ukuran (H = 50 m x W = 22 m) M 767.090,00 925.760,00 750.220,00
382 Pile K-700 Ukuran (H = 50 m x W = 32 m) M 661.550,00 899.550,00 636.240,00
XIX BAHAN PAVING BLOCK DAN KANSTEN
383 Tipe segi empat tebal = 6 cm K 250 m2 171.450,00 363.030,00 168.640,00
384 Tipe segi empat tebal = 6 cm K 300 m2 198.230,00 404.620,00 177.630,00
385 Paving Tipe segi empat tebal = 6 cm K 400 m2 216.410,00 435.080,00 194.280,00
block
386 Tipe segi enam tebal = 6 cm K 300 m2 221.370,00 502.850,00 197.190,00
natural/
387 abu-abu Tipe segi enam tebal = 8 cm K 300 m2 267.380,00 642.800,00 236.060,00
388 Tipe uni / tikar tebal = 6 cm K300 m2 205.470,00 372.540,00 168.590,00
389 Tipe uni / tikar tebal = 8 cm K 300 m2 210.790,00 444.780,00 192.040,00
390 Tipe segi empat tebal = 6 cm K 250 m2 223.840,00 415.420,00 199.580,00

Paving
block
warna
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
391 Tipe segi empat tebal = 6 cm K 300 m2 232.790,00 439.180,00 212.200,00
392 Paving Tipe segi empat tebal = 6 cm K 400 m2 256.730,00 475.400,00 234.600,00
393 block Tipe segi enam tebal = 6 cm K 300 m2 260.540,00 542.020,00 236.370,00
394 warna Tipe segi enam tebal = 8 cm K 300 m2 312.310,00 687.730,00 281.000,00
395 Tipe uni / tikar tebal = 6 cm K300 m2 240.030,00 407.100,00 203.160,00
396 Tipe uni / tikar tebal = 8 cm K 300 m2 253.420,00 487.410,00 234.670,00
397 Kanstin 15x20x30x50 cm, K 300 buah 85.840,00 141.840,00 63.570,00
398 Kanstin Kanstin 10x14x30x50 cm, K 300 buah 59.090,00 105.400,00 53.280,00
399 Kanstin taman 10x20x40 cm, K 300 buah 46.990,00 89.820,00 42.110,00
XX BAHAN LAINNYA
400 Storox - 100 kg 133.660,00 137.090,00 133.610,00
401 Pintu gulung (rolling door) berbahan alumunium m2 264.590,00 307.420,00 263.640,00
402 Pintu lipat (folding gate) m2 573.730,00 630.470,00 568.970,00
403 Sunscreen alumunium m2 1.059.930,00 1.106.250,00 1.054.050,00
404 Joint Sealent kg 36.960,00 38.160,00 36.830,00
405 Polytene 125 mikron/ platik cor kg 6.080,00 18.070,00 5.690,00
406 Geotextile Woven 200 gram/m2 m2 10.360,00 10.720,00 10.330,00
407 Geotextile Non Woven 200 gram/m2 m2 10.520,00 10.870,00 10.490,00
408 Elastomer karet alam uk. (450 x 400 x 45) mm bh 955.810,00 977.320,00 954.200,00
409 Mata kucing bh 126.560,00 127.970,00 126.460,00
410 Bahan Additive (soil stabilizer ) kg 169.690,00 171.450,00 169.550,00
411 Bahan Additive (campuran beton) kg 42.470,00 44.360,00 42.330,00
412 Curing compound ltr 21.470,00 53.770,00 18.830,00
413 Kelas A bentang 20 meter Kg 38.740,00 39.920,00 38.650,00
414 Kelas A bentang 22,5 meter Kg 35.830,00 37.010,00 35.740,00
415 Kelas A bentang 25 meter Kg 38.740,00 39.920,00 38.650,00
416 Kelas A bentang 27,5 meter Kg 35.830,00 37.010,00 35.740,00
417 Kelas A bentang 30 meter Kg 38.740,00 39.920,00 38.650,00
418 Kelas A bentang 32,5 meter Kg 35.830,00 37.010,00 35.740,00
419 Kelas A bentang 35 meter Kg 35.830,00 37.010,00 35.740,00
420 Jembatan Kelas A bentang 37,5 meter Kg 35.830,00 37.010,00 35.740,00
421 Tipe Girder Kelas A bentang 40 meter Kg 35.830,00 37.010,00 35.740,00
422 Baja Kelas B bentang 20 meter Kg 38.450,00 39.630,00 38.370,00
423 Komposit Kelas B bentang 22,5 meter Kg 35.830,00 37.010,00 35.740,00
424 Kelas B bentang 25 meter Kg 38.740,00 39.920,00 38.650,00
425 Kelas B bentang 27,5 meter Kg 35.830,00 37.010,00 35.740,00
426 Kelas B bentang 30 meter Kg 38.740,00 39.920,00 38.650,00
427 Kelas B bentang 32,5 meter Kg 35.830,00 37.010,00 35.740,00
428 Kelas B bentang 35 meter Kg 35.830,00 37.010,00 35.740,00
429 Kelas B bentang 37,5 meter Kg 35.830,00 37.010,00 35.740,00
430 Kelas B bentang 40 meter Kg 35.830,00 37.010,00 35.740,00
431 Kelas A bentang 35 meter Kg 35.830,00 37.010,00 35.740,00
432 Kelas A bentang 40 meter Kg 38.170,00 39.340,00 38.080,00
433 Kelas A bentang 45 meter Kg 35.830,00 37.010,00 35.740,00
434 Kelas A bentang 50 meter Kg 38.170,00 39.340,00 38.080,00
435 Kelas A bentang 55 meter Kg 35.830,00 37.010,00 35.740,00
436 Kelas A bentang 60 meter Kg 40.500,00 41.670,00 40.410,00
437 Jembatan Kelas A bentang 70 meter Kg 35.830,00 37.010,00 35.740,00
438 Tipe Kelas A bentang 80 meter Kg 35.830,00 37.010,00 35.740,00
439 Rangka Kelas B bentang 35 meter Kg 35.830,00 37.010,00 35.740,00
440 Baja Kelas B bentang 40 meter Kg 38.170,00 39.340,00 38.080,00
441 Kelas B bentang 45 meter Kg 35.830,00 37.010,00 35.740,00
441 Kelas B bentang 50 meter Kg 38.170,00 39.340,00 38.080,00
442 Kelas B bentang 55 meter Kg 35.830,00 37.010,00 35.740,00
443 Kelas B bentang 60 meter Kg 38.170,00 39.340,00 38.080,00
444 Kelas B bentang 70 meter Kg 35.830,00 37.010,00 35.740,00
445 Kelas B bentang 80 meter Kg 35.830,00 37.010,00 35.740,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
446 Ukuran lubang (120x120) cm bh 68.082.900,00 68.090.650,00 68.082.080,00
Pintu Air
447 Ukuran lubang (100x100) cm bh 65.987.520,00 65.992.900,00 65.986.950,00
Baja
448 Ukuran lubang (95x50) cm bh 62.844.630,00 62.847.190,00 62.844.360,00
449 Glassbeads kg 21.370,00 23.090,00 21.190,00
450 Asphaltic Plug kg 47.640,00 91.730,00 44.340,00
451 Backer Rod M 3.160,00 3.220,00 3.160,00
452 Bridging Plate PL 125 x 6 kg 13.550,00 23.640,00 13.190,00
453 Baja profil L=149x125 dan profil C=75x45x15x2,3 kg 31.340,00 45.620,00 30.120,00
454 PC I Girder H-90 cm; bentang 10 m; K-500 bh 23.040.520,00 22.596.710,00 22.374.800,00
455 PC I Girder H-90 cm; bentang 11 m; K-500 bh 24.231.840,00 23.788.020,00 23.566.120,00
456 PC I Girder H-90 cm; bentang 12 m; K-500 bh 29.313.930,00 28.870.110,00 28.648.210,00
457 PC I Girder H-90 cm; bentang 13 m; K-500 bh 31.342.280,00 30.676.560,00 30.343.700,00
458 PC I Girder H-90 cm; bentang 14 m; K-500 bh 37.407.150,00 36.741.420,00 36.408.560,00
459 PC I Girder H-90 cm; bentang 15 m; K-500 bh 38.970.600,00 38.304.880,00 37.972.020,00
460 PC I Girder H-90 cm; bentang 16 m; K-500 bh 40.347.410,00 39.681.690,00 39.348.830,00
461 PC I Girder H-125 cm; bentang 16 m; K-500 bh 47.790.230,00 47.124.510,00 46.791.650,00
462 PC I Girder H-125 cm; bentang 17 m; K-500 bh 49.670.520,00 49.004.800,00 48.671.940,00
463 PC I Girder H-125 cm; bentang 18 m; K-500 bh 51.312.320,00 50.646.600,00 50.313.740,00
464 PC I Girder H-125 cm; bentang 19 m; K-500 bh 53.193.770,00 52.528.050,00 52.195.190,00
465 PC I Girder H-125 cm; bentang 20 m; K-500 bh 55.604.040,00 54.938.320,00 54.605.460,00
466 PC I Girder H-125 cm; bentang 21 m; K-500 bh 57.378.340,00 56.712.620,00 56.379.760,00
467 PC I Girder H-125 cm; bentang 22 m; K-500 bh 60.914.260,00 60.248.540,00 59.915.680,00
468 PC I Girder H-125 cm; bentang 23 m; K-500 bh 63.218.540,00 62.552.820,00 62.219.960,00
469 PC I Girder H-160 cm; bentang 22 m; K-500 bh 94.987.650,00 94.321.930,00 93.989.070,00
470 PC I Girder H-160 cm; bentang 23 m; K-500 bh 98.139.900,00 97.474.180,00 97.141.320,00
471 PC I Girder H-160 cm; bentang 24 m; K-500 bh 100.405.010,00 99.739.290,00 99.406.430,00
472 PC I Girder H-160 cm; bentang 25 m; K-500 bh 103.092.950,00 102.427.230,00 102.094.370,00
473 PC I Girder H-160 cm; bentang 26 m; K-500 bh 105.939.890,00 105.274.170,00 104.941.310,00
474 PC I Girder H-160 cm; bentang 27 m; K-500 bh 109.039.150,00 108.373.420,00 108.040.560,00
475 PC I Girder H-160 cm; bentang 28 m; K-500 bh 113.064.720,00 112.399.000,00 112.066.140,00
476 PC I Girder H-160 cm; bentang 29 m; K-500 bh 115.951.990,00 115.286.260,00 114.953.400,00
477 PC I Girder H-160 cm; bentang 30 m; K-500 bh 121.170.030,00 120.504.310,00 120.171.450,00
478 PC I Girder H-160 cm; bentang 31 m; K-500 bh 124.374.130,00 123.708.410,00 123.375.550,00
479 PC I Girder PC I Girder H-170 cm; bentang 30 m; K-500 bh 151.721.320,00 151.055.600,00 150.722.740,00
480 Beton K- PC I Girder H-170 cm; bentang 31 m; K-500 bh 155.826.400,00 155.160.680,00 154.827.820,00
481 500 PC I Girder H-170 cm; bentang 32 m; K-500 bh 160.196.470,00 159.530.750,00 159.197.890,00
482 PC I Girder H-170 cm; bentang 33 m; K-500 bh 164.566.530,00 163.900.810,00 163.567.950,00
483 PC I Girder H-170 cm; bentang 34 m; K-500 bh 169.625.580,00 168.959.860,00 168.627.000,00
484 PC I Girder H-170 cm; bentang 35 m; K-500 bh 182.074.450,00 181.408.730,00 181.075.870,00
485 PC I Girder H-170 cm; bentang 36 m; K-500 bh 189.344.460,00 188.678.740,00 188.345.870,00
486 PC I Girder H-170 cm; bentang 37 m; K-500 bh 196.402.470,00 195.736.740,00 195.403.880,00
487 PC I Girder H-170 cm; bentang 38 m; K-500 bh 202.005.320,00 201.339.600,00 201.006.740,00
488 PC I Girder H-170 cm; bentang 39 m; K-500 bh 199.489.050,00 198.823.330,00 198.490.470,00
489 PC I Girder H-170 cm; bentang 40 m; K-500 bh 203.938.610,00 203.272.890,00 202.940.030,00
490 PC I Girder H-170 cm; bentang 41 m; K-500 bh 209.460.820,00 208.795.100,00 208.462.240,00
491 PC I Girder H-210 cm; bentang 35 m; K-500 bh 206.759.050,00 206.093.330,00 205.760.470,00
492 PC I Girder H-210 cm; bentang 36 m; K-500 bh 210.440.140,00 209.774.420,00 209.441.560,00
493 PC I Girder H-210 cm; bentang 37 m; K-500 bh 214.546.370,00 213.880.650,00 213.547.790,00
494 PC I Girder H-210 cm; bentang 38 m; K-500 bh 219.022.430,00 218.356.710,00 218.023.850,00
495 PC I Girder H-210 cm; bentang 39 m; K-500 bh 223.511.170,00 222.845.450,00 222.512.590,00
496 PC I Girder H-210 cm; bentang 40 m; K-500 bh 235.854.040,00 235.188.320,00 234.855.460,00
497 PC I Girder H-210 cm; bentang 41 m; K-500 bh 243.071.050,00 242.405.330,00 242.072.470,00
498 PC I Girder H-210 cm; bentang 42 m; K-500 bh 248.778.750,00 248.113.030,00 247.780.170,00
499 PC I Girder H-210 cm; bentang 43 m; K-500 bh 253.401.140,00 252.735.410,00 252.402.550,00
500 PC I Girder H-210 cm; bentang 44 m; K-500 bh 261.731.110,00 261.065.390,00 260.732.530,00
501 PC I Girder H-210 cm; bentang 45 m; K-500 bh 266.617.330,00 265.951.610,00 265.618.750,00
502 PC I Girder H-210 cm; bentang 46 m; K-500 bh 266.458.340,00 265.792.620,00 265.459.760,00
503 PC I Girder H-210 cm; bentang 47 m; K-500 bh 271.001.230,00 270.335.510,00 270.002.650,00
504 PC I Girder H-210 cm; bentang 48 m; K-500 bh 278.336.900,00 277.671.180,00 277.338.320,00
REGION I REGION II REGION III
NO. URAIAN SATUAN (TENGAH) (ULU) (PESISIR)
(Rp.) (Rp.) (Rp.)
505 PC I Girder H-210 cm; bentang 49 m; K-500 bh 282.270.310,00 281.604.590,00 281.271.730,00
506 PC I Girder H-210 cm; bentang 50 m; K-500 bh 299.154.920,00 298.489.200,00 298.156.340,00
507 Diafragma pracetak H = 90; K-350 termasuk stressing bh 2.807.280,00 2.743.880,00 2.712.180,00
508 Diafragma pracetak H = 125; K-350 termasuk stressing bh 3.202.500,00 3.113.740,00 3.069.350,00
509 Diafragma pracetak H = 160; K-350 termasuk stressing bh 3.588.640,00 3.477.690,00 3.422.210,00
510 Diafragma pracetak H = 170; K-350 termasuk stressing bh 3.613.860,00 3.492.820,00 3.432.300,00
511 Diafragma pracetak H = 120; K-350 termasuk stressing bh 4.343.580,00 4.195.640,00 4.121.670,00