Вы находитесь на странице: 1из 6

COMMENTARY

Bharat Nirman: A Stocktaking c­ ommitment to rural development as sig-


nalled by the initiative of Bharat
Nirman, this trend reversal comes as a bit
of a surprise. Clearly, for all-round rural
Mala Lalvani development, higher allocation to agricul-
ture, especially higher capital expendi-

T
A prominent feature of Budget he Bharat Nirman programme, tures must be forthcoming.
2010, like the previous United which has identified six thrust areas
of rural infrastructure, formed the Evaluating Bharat Nirman
Progressive Alliance budgets, is
core of the United Progressive Alliance According to Prime Minister Manmohan
the continued support to the (UPA) government’s agenda to bolster rural Singh, Bharat Nirman was intended to
Bharat Nirman – a programme development. The Union Budget 2010-11 be “a time-bound business plan for action
which has come to occupy an was no exception. It promised continued in rural infrastructure for the next four
support to this programme and an alloca- years” (2005-09). However, the program­me
important part in the UPA
tion of Rs 48,000 crore (4% of total has continued beyond 2009 as Phase II,
government’s thrust on rural e­xpenditure). With Phase I of this pro- and has come to occupy ­centre stage of
development. This article gramme completed in 2009 and Phase II the UPA government’s policy ­initiatives.
attempts a stocktaking exercise of having begun in 2009-10, the agenda set Conceptually, Bharat Nirman was a
out in this article is to take stock of the good idea as it listed out six core infra-
this initiative, and in doing so, it
performance in terms of the targets and structure sectors in rural areas that need-
draws attention to areas where achievements of the programmes under ed attention, viz, roads, electricity, water
mid-course correction is called for Bharat Nirman. As an aside it would be supply, telephones, irrigation and hous-
if the increased budgetary interesting to see if allocation to the line ing. For each of these sectors, flagship pro-
department of agriculture has been sacri- grammes were initiated. For the first time,
allocation is to translate into a
ficed at the altar of Bharat Nirman! setting specific quantitative targets for
de facto improvement in rural public programmes and their achieve-
infrastructure. Budgetary Allocations to ments took place on such a large scale in
Agriculture the Indian policy forum. This sent out a
Rural development was identified as one clear signal of instilling accountability
of the priority areas by the UPA govern- and pinning responsibility – most certain-
ment under the umbrella programme of ly a commendable governance initiative.
Bharat Nirman in 2004. While the good Given that the programme has now run
intent in having a focused agenda is un- over the initial five-year tenure the time is
questionable, it would be interesting to see opportune to take stock and assess the
if its presence has affected the shares allo- physical achievements.
cated to the line department of agriculture A snapshot of the overall achievement
and allied services which is the mainstay of vis-à-vis the quantitative targets set out
improvement in rural incomes. The allo­ by each of the six programmes has been
cation to agriculture and allied services as a put together in Table 2 (p 21). A detailed
percentage of the gross domestic product year-wise achievement has been tabulated
(GDP) reached a peak in 2008-09, i e, in in the Appendix (Tables A1 to A9, p 23).
the first year of the fiscal stimulus but In the remainder of this section we dis-
since then we witness a declining trend cuss the performance of each of these
(Figure 1). programmes, and also draw attention to
A look at the break-up of Figure 1: Agriculture and Allied Services as Per Cent of GDP: Pre and Post Fiscal
Figure 1: Central Government Allocations Stimulus
to Agriculture and Allied Services –
the shares allocated to Pre- and Post-Fiscal Stimulus (% of GDP)
agriculture and allied ac- 3.00
2.49
tivities into revenue and 2.50
capital account clearly 1.78
2.00
shows that the already 1.56
1.39
Sincere thanks to Abhay Pethe, Ajit Karnik low shares allocated to 1.50
and Romar Correa for their comments and capital expenditures in 1.00
suggestions. The usual disclaimer applies. agriculture have dipped
0.50
Mala Lalvani (mala.lalvani@gmail.com) is with sharply in 2009-10(RE)
the department of economics, University of and 2010-11(BE) (Table 1, 0.00
Mumbai. Pre-Stimulus Stimulus Year 1 Stimulus Year 2 Rollback Year 1
Pre-Stimulus (2007-08)Stimulus Year 1 (2008-Stimulus Year 2 (2009- Rollback Year1 (2010-
p 21). Given the UPA’s (2007-08) (2008-09)
09) (2009-10
10 RE) RE) (2010-11
11 BE) BE)

Economic & Political Weekly  EPW   April 24, 2010  vol xlv no 17 19
COMMENTARY

20 April 24, 2010  vol xlv no 17  EPW   Economic & Political Weekly
COMMENTARY
Table 1: Allocations to Agriculture and Allied Activities (on Revenue and Capital Account, % of GDP) per cent of the completed and 16% of the
Pre-Stimulus Stimulus Year 1 Stimulus Year 2 Rollback Year1
2007-08 2008-09 2009-10(RE) 2010-11(BE)
on-going works have been found unsatis-
Agri and allied on revenue account as % of GDP 1.38 2.48 1.78 1.55 factory by the national quality monitors
Agri and allied on capital account as % of GDP 0.007 0.014 0.002 0.003 (NQM) on inspection of (the road construc-
RE-Revised Estimates, BE-Budgeted Estimates. tion work under) PMGSY during April 2008
Table 2: Achievements under Bharat Nirman (Detailed Tables in Appendix) to May 2009” (Business Standard 2009). It
Target Variables Overall Achievement is important to note that while it is the
2005-06 to 2009-10 (%)
centre which provides 100% finance for
Roads: PMGSY (2005-06 to 2009-10) New Construction 62.17
construction of rural roads under the PM-
Upgradation 93.35
Coverage of habitations 58.74
GSY, the primary responsibility to ­ensure
Housing: IAY (2006-07 to 2009-10) Houses constructed for rural BPL families 60 the quality of the construction works and
Telecommunication:Village Public Telephones Villages covered 92.5 maintenance of roads lies with the states.  
Irrigation: AIBP Irrigation potential 73.0 The shortage of contractors to undertake
Drinking Water: ARWSP Un-covered habitations 98.86 rural works is a critical constraint in certain
Slipped-back habitations 108.07 states though relaxation in the bidding ca-
Quality affected habitations 142.85 pacity and packaging of works has helped
Total 119.73 marginally in overcoming the problem. The
Power: RGGVY Electrification of un/de-electrified villages 61.9
constraint of inadequate availability of
Intensive electrification 29.7
trained human resources has been sought
Rural households 25.7
to be overcome through need-based train-
BPL households 38.4
BPL stands for below poverty line households. ing programmes and almost 20,000 engi-
neering personnel have been trained so far.
some lapses that have been highlighted in the citizens section (omms.nic.in). OMMAS Further, the government is now looking to
the few evaluation studies or reports that incorporates advanced features like e- build rural roads on the public-private-
could be accessed in the public domain. payment, password protected PDF files, partnership (PPP) mode. However, for
While some of these reports are state- interactive reports, etc. private developers to enter the rural road
specific, the essential points made are by We find that the achievement record for construction sector an assurance of a fixed
and large applicable to most other states in upgradation is fairly good at 93% but for return would be needed (GOI 2010).
the country. new connectivity it is only 62% (Table A1) Measures to improve the performance
and for habitations to be covered the of the PMGSY must tackle the problems of
1 Roads (Pradhan Mantri Gram Sadak achievement rate is under 60% (Table A2). underutilisation of funds, poor quality of
Yojana: PMGSY): The Ministry of Rural Moreover, we find that in some years the roads constructed and lack of incentives
Development was to ensure that every achievement was well below 50% while in to attract private participation. Thus, the
habitation with population exceeding some other years it was even higher than third challenge that the finance minister
1,000, and every habitation in hilly and the targeted amount. Clearly such erratic mentioned in his budget speech – weak-
tribal areas with population exceeding performance defeats the very purpose of nesses in government systems, structures
500 is connected with an all-weather road setting out targets. Thus, even if we keep and institutions at different levels of gov-
by 2009. This was expected to generate aside for a moment the quality aspect of ernance, appears to be at the heart of
multiplier effects in the rural economy by the roads constructed, the overall physical ­underperformance in PMGSY.
linking production to markets and servic- target achievement rate approximating
es. Targets were set out in terms of new 60% for new connectivity and for habita- 2  Housing (Indira Awas Yojana: IAY):
connectivity, upgradation and habitations tions covered is well below satisfactory. This is a flagship scheme of the Ministry of
to be covered. An online management, On the financial front, expenditure as a Rural Development to provide financial
monitoring and accounting system proportion of the amount released has assistance to the BPL households in rural
(OMMAS) has been developed by the been 73% during the period 2003-04 to areas for construction of a dwelling unit.
e-governance department of the Centre 2008-09, ranging from a low of 48% in The cost of this project is shared between
for Development of Advanced Computing, 2008-09 to a high of 95% in 2006-07. Fur- the centre and states on a 75:25 basis.
and it is one of the biggest databases in ther, the amount released is seen to be The achievement of this programme has
­India. The system manages and monitors merely 60% of the sanctioned amount been somewhat erratic ranging from a
all the phases of road development right (Table A3). Thus underutilisation of funds low of 3.8% in 2007-08 to a high of
from its proposal mode to road completion. and procedural delays appear to be ram- 100.44% in 2008-09. For the period be-
The OMMAS system also has a separate pant and are most certainly a reason for tween 2006-07 and 2010-11 the overall
module to track the expenses made on the underachievement of targets. achievement has been 60% (Table A4). In
each road. Based on the data entered by On the quality front, the union minister 2008-09 the utilisation of funds was 73%
state and district officers, OMMAS generates of state for rural development Pradeep but the physical target achieved was 100%.
detailed reports which can be viewed in Jain Aditya said in the Lok Sabha, “Nine The year 2007-08 was a particularly bad
Economic & Political Weekly  EPW   April 24, 2010  vol xlv no 17 21
COMMENTARY

year when only 3% of the target was The achievement under this component Thus, in addition to the procedural de-
achieved and only 5% of the funds were has been very good with 92% of the target lays in the flow of funds, which have been
utilised. Clearly under-utilisation of funds being met (Table A5). This has been one of consistently noticed in other programmes,
seems to be the rule rather than exception the success stories of Bharat Nirman. the AIBP suffers from the problem of time
with almost all ­flagship programmes. The and cost overruns and shortage of com-
outcome budget of the Ministry of Rural 4  Irrigation (Accelerated Irrigation munity participation.
Development for 2007-08 shows that 1.55 Benefit Programme: AIBP): The Ministry of
million houses were constructed under Water Resources in collaboration with state 5 Drinking Water (Accelerated Rural
the scheme in 2005-06 as against the governments took on the responsibility for Water Supply Programme: ARWSP):
target of 1.44 million. However, the moni- the creation of an additional 10 million hec- Performance on this front seems particu-
toring reports of the ministry for the tares of irrigation capacity by the end of larly good with more than 100% of the tar-
period show that in several states, the 2009 through major, medium and minor ir- get being achieved in case of all categories
guidelines were not followed, resulting in rigation projects complemented by ground and nearly 100% in case of coverage of un-
a number of deserving families being left water development. The overall achieve- covered habitations. While 108% of the
out (Nichenametla 2007). ment on this count seems to be reasonable target has been attained in case of slipped
An evaluation study of the IAY for Jam- at 73%. In the last two years (i e, 2007-08 back habitations and 142% in case of quali-
mu and Kashmir in 2009 provides some and 2008-09) the achievement rate seems ty-affected habitations (Table A7), the fact
insight into problems that are likely to be to have fallen considerably as compared to that there are “slipped back” and “quality-
present across the board in all states. the first two years (2005-06 and 2006-07) affected” habitations itself indicates that the
Some of the main findings of the study to 60% and 66%, respectively (Table A6). scheme falls short on quality and does not
are: (i) involvement of local Members of The findings of the Auditor General of pay adequate attention to maintenance,
Legislative Assembly in the selection of Rajasthan would be indicative of the po- thus allowing habitations to slip back. The
beneficiaries, (ii) No standard economic tential problems that are likely to exist in average proportion of slipped back habita-
criterion was followed to identify the ben- most states, viz, improper selection, lack tions is as high as 65.45% (Table A8).
eficiaries leading to some above poverty of planning, financial mismanagement An evaluation has been undertaken for
line families being included as beneficiar- and execution (Government of Rajasthan a rapid appraisal of the implementation
ies while not all BPL families were covered, 2005-06). The execution problem includes status of sub-mission projects (SMP) under
(iii) Community facilities such as internal lack of construction of Jaisamand dam up the ARWSP to address problems relating to
roads, drainage, drinking water supply, to safety level, extra cost of Rs 60.17 lakh quality of drinking water in rural habita-
etc, and other common facilities were not and liability of Rs 46.87 lakh, avoidable tions. The overriding objective of the SMPs
provided to IAY dwellings, (iv) Lack of co- extra expenditure, irregular payment of is to provide safe drinking water in quali-
ordination among various agencies in- price escalation and huge gap in irrigation ty-affected habitations. The major find-
volved with implementation of sanitation, potential targeted, potential created and ings of the study are (a) in some states,
water supply, smokeless chulla schemes in its utilisation (ibid). there is evidence of quality-affected habi-
the state, and (v) No clear-cut directions as The Eleventh Plan document points out tations, but no SMP has been taken up. The
to which type of houses need upgradation that the completion rate has been quite focus of the state government is more on
(Planning Commission 2009). satisfactory in respect of AIBP-assisted coverage of habitations in the rural areas
Thus, apart from smoothening the pro- minor irrigation schemes as these have rather than on quality, (b) the data on
cedures for the release of funds, some spe- low gestation periods. However, the per- ­expenditure under the quality head were
cific measures that need to be taken to formance of major and medium irrigation not available for all states. In majority of
make the IAY a greater success are more projects in terms of completion of the the cases, this was due to absence of
stringent norms for beneficiary selection, projects as well as the potential creation s­eparate data maintenance system for
clearer directions on the houses in need of has not been very satisfactory. The Plan SMPs. Further, it felt that lack of aware-
upgradation, development of community document suggests that the allocation to ness about the possible benefits from the
facilities like roads, water, sanitation, and AIBP during the Eleventh Plan should be contamination-free water supply was evi-
greater coordination among the agencies increased but with much more effective dent among majority of the beneficiaries.
involved with these associated services. monitoring, using remote sensing data to The awareness was very high only in cases
incentivise the central funds flow to the of West Bengal and Andhra Pradesh. This
3  Telecommunication (Village Public states. Also, it suggests that states should evidence brings out the need for introduc-
Telephones: VPTs): The significance of shift to “fixed-time fixed-cost” and a ing strong information, education and
enhancing rural connectivity can hardly be greater emphasis on participatory communication component (IEC) so that
over emphasised. The Department of Tele- irrigation management, including col­ people can join hands with the govern-
com in the Ministry of Communications and lection and retention of water rates by ment in maintaining the infrastructure
Information Technology was given the re- water user associations, to reduce the and ensuring availability of contamina-
sponsibility of providing telephone connec- gap between potential created and the tion free water (Society for Development
tivity to the villages that remain uncovered. ­actual utilised. Studies 2006).
22 April 24, 2010  vol xlv no 17  EPW   Economic & Political Weekly
COMMENTARY

The Eleventh Five-Year Plan document on upgradation of houses in IAY). In some rural infrastructure on the ground, it is
notes that sustainability of the ARWSP has others the quantitative targets reveal only imperative that detailed stock check of the
emerged as a major issue and the Plan half truths (such as wrong selection of programmes be undertaken so that mid-
aims at arresting the slip backs. The Plan beneficiaries in IAY or no indication of course correctives can be initiated. Evalu-
document also draws attention to the im- cost and time overruns in case of AIBP). ation studies, based on both primary and
portance of convergence, ensuring com- secondary information at regular intervals
munity participation, and an IEC cam- Conclusions and preferably by independent agents,
paign. Further it also emphasises the sig- If a higher allocation to Bharat Nirman in could be made an integral part of the design
nificance of community involvement. It every budget is to translate into improved of all such programmes. This suggestion is
says, “While our programmes have elabo- Appendix
rate guidelines for community involve- Table A1: PMGSY Targets and Achievements of Road Length
ment, it is obvious that field-level adoption Year New Connectivity (Km) Upgradation (Km) Achievement/Target (%)
Target Achievement Target Achievement New Upgradation
is far from satisfactory” (Planning Com-
2005-06 15,492.5 18,054.3 11,393.9 3,898.1 116.54 34.21
mission 2007, vol 2, p 165). 2006-07 35,182.2 21,422.85 54,669.257 44,306.65 60.89 81.04
2007-08 43,989.9 21,901.76 59,316.284 58,145.386 49.79 98.03
6  Electrification (Rajiv Gandhi Grameen 2008-09 35,220 24,026.36 52,720 48,668.82 68.22 92.32
Vidyutikaran Yojana: RGGVY): The aims 2009-10 24,000 10,262.29 16,000 26,167.39 42.76 163.55
of this programme are (i) electrifying all 2005-06 to 2009-10 1,53,884.6 95,667.56 1,94,099.441 1,81,186.349 62.17 93.35
http://www.pmgsy.nic.in/bharat_nirman.asp
villages and habitations as per the new
Table A2: PMGSY Targets and Achievements of Table A6: Achievement and Target in Irrigation
definition, (ii) providing access to electric- Habitations Covered Potential (AIBP) (million hectare)
ity for all rural households, and (iii) pro- Year Target Achievement Achievement/ Year Target Achievement Achievement/
Target (%)
viding electricity connection to BPL fami- Habitations Target (%)
2005-06 1.9 1.69 88.95
2005-06 1,484 10,409 91.49
lies free of charge. The achievement is 2006-07 2.4 1.96 81.67
2006-07 16,130 8,275 51.30
62% for un/de-electrified villages; 30% 2007-08 2.85 1.7 59.65
2007-08 20,071 7,040 35.08
for intensive electrification and as low as 2008-09 2.85 1.9 66.67
2008-09 18,100 11,395 62.96 Total 10 7.3 73.00
25% for rural households and 38% for BPL
2009-10 13,000 3,284 62.96 http://wrmin.nic.in/bharatnirman/CumAch2005-09.pdf
households (Table A9). http://wrmin.nic.in/bharatnirman/target_national_yearwise.htm
2005-06 to 2009-10 68,785 40,403 58.74
In its presentation to the Planning Com- http://www.pmgsy.nic.in/bharat_nirman.asp Table A7: Achievement and Target in ARWSP
mission, the power ministry listed out cer- Year Uncovered Slipped- Quality Total
Table A3: Expenditure as Per Cent of Release Habitations Back Affected
tain factors that have resulted in delays, in PMGSY
Habitations Habitations

including issues like delay on the part of Target


Year Exp as % of Release
2005-09 55,067 3,31,604 2,16,968 6,03,639
states in preparing the BPL lists to be pro- 2003-04 81.17
2005-06 Target 11,897 34,373 10,000 56,270
vided connections, in issue of panchayat 2004-05 71.77
Ach 13,131 79,544 4,550 97,225
certificate for village electrification and 2005-06 81.18
2006-07 Target 18,120 40,000 15,000 73,120
land acquisition (Ojah 2008). 2006-07 95.31 Ach 12,440 89,580 5,330 1,07,350
2007-08 64.80
The Eleventh Five-Year Plan document 2007-08 Target 20,931 84,915 49,653 1,55,499
2008-09 48.57 Ach 11,457 75,201 94,130 1,80,788
draws attention to the fact that non-avail-
Average 73.80 2008-09 Target 16,763 1,01,733 99,402 2,17,898
ability of electrification materials due to http://www.omms.nic.in/government/security/login/ Ach 17,412 1,14,037 2,05,930 3,37,379
sudden demand has contributed to under- dologin.asp#
Achievement/Target 98.86 108.07 142.85 119.73
achievement. It also emphasises the need http://rural.nic.in/latest/BharatNirman_QuartlyReport.pdf
Table A4: Achievement and Targets of Rural Housing
for fully operationalising the franchisee for BPL under IAY Table A8: ARWSP – Proportion of Slipped-Back and
system for revenue collection and viable Year Target Achievement Achievement Quality-Affected Habitations (%)
as %
Year Slipped-Back Habitations Quality Affected
tariff as the key to sustaining the power of Target
Habitations
supply in rural areas. 2006-07 15,33,498 14,48,818 94.48
2005-06 54.93 35.94
Thus, the overall picture that emerges 2007-08 21,27,722 82,090 3.86 2006-07 81.81 4.68
from a stocktaking exercise of the Bharat 2008-09 21,27,165 21,36,574 100.44 2007-08 83.45 4.97
2009-10 40,52,243 22,94,767 56.63
Nirman is that despite the fact that 2008-09 41.60 52.07
2006-07 to Average 65.45 24.41
Phase I of the programme is over, there
2010-11 98,40,628 59,62,249 60.59 http://rural.nic.in/latest/BharatNirman_QuartlyReport.pdf
are many general and specific problems http://rural.nic.in/rural/stmonth1.aspx?flag=2 Table A9: RGGVY – Achievement and Target as in 2010
which continue to plague the programme. http://rural.nic.in/IAY/Framemon.asp
Target Achievement Achievement
These are by and large procedural, imple- Table A5: Status of VPTs Coverage in Nos (%)

mentation and delivery-level problems No of villages to be provided VPTs Electrification of un/


under Bharat Nirman 62,302 de-electrified villages 1,18,499 73,357 61.9
which have resulted in underachievement
Intensive electrification 3,54,375 1,05,213 29.7
VPTs provided (nos) 61,526
of targets. In some programmes there Rural households 4,14,55,745 1,06,46,046 25.7
Achievement/Target (%) 92.54
appear to be problems in the design of the BPL households 2,46,06,500 94,52,281 38.4
Source: http://www.dot.gov.in/uso/implementationstatus.
programme itself (such as lack of clarity htm (Table 1A). http://rggvy.gov.in/rggvy/rggvyportal/plgsheethome3.jsp

Economic & Political Weekly  EPW   April 24, 2010  vol xlv no 17 23
COMMENTARY

based on the observation in the preceding exists in some of the programmes but has – (2010): Economic Survey 2009-10, Ministry of Fi-
nance, New Delhi.
paragraphs that in some instances macro not been implemented. Specific incentives Government of Rajasthan (2005-06): “Performance
level quantitative targets reveal only half for private sector participation, possibly in Review”, Audit Report (Civil), available on http://
www.agraj.cag.gov.in/agca/Chapter-3.pdf
truths. In fact, making evaluation studies the nature of tax breaks, would most cer-
Planning Commission (2007): Eleventh Five-Year Plan
at regular intervals, preferably by private tainly help motivate private players. Final- (2007-2012), Volumes I, II and III, New Delhi.
independent organisations (like universi- ly, introducing a set of incentive structures – (2009): Evaluation Report on Indira Awas
Yojana: Jammu and Kashmir, Programme Evalu-
ties or other acade­mic institutions) man- which would reward performance (if not ation Organisation, available on http://plan-
datory would strengthen the culture of ac- penalise non-performance) would go a ningcommission.nic.in/reports/peoreport/peo/
peo_iay.pdf
countability and transparency. long way in improving performance. Nichenametla, Prasad (2007): “Indira Awas Yojana
Some other principles which could im- Way Off Mark”, Business Standard, 23 May, avail-
able on http://www.business-standard.com/in-
prove performance of the programmes References dia/storypage.php?autono=285319
under Bharat Nirman are community Business Standard (2009): “Road Construction Works Ojah, Oineetom (2008): “Rural Power Plan Fails to
under PMGSY Unsatisfactory: Minister”, 17 July, Light Up Villages”, Financial Express, 10 July,
i­nvolvement, private sector participation available at http://www.business-standard.com/ available on http://www.financialexpress.com/
and incentive compatible reward systems. india/news/road-construction-works-under-pm- news/rural-power-plan-fails-to-light-up-villag-
gsy-unsatisfactory-minister/16/47/68078/on es/333624/
Community involvement and participa- (viewed on 13/03/10). Society for Development Studies (2006): Evaluation
tion would instil a sense of “ownership” – GOI (2009-10): Quarterly Report of Ministry of Rural Study of Sub-Mission (Quality) Projects under Ac-
Development (2nd Quarter of 2009-10), available celerated Rural Water Supply Programmes, Stage
non-governmental organisations can play I Evaluation Report, available on http://drd.nic.
on http://rural.nic.in/latest/BharatNirman_
a pivotal role here. In fact, this provision QuartlyReport.pdf in/monitor/Eval_study_SMP_ARWSP.pdf

‘Universities’ in Need of Reform this Act shall apply to such institution as if


it were a university within the meaning of
clause (f) of Section 2 which2 states that,
“University” means a University established
Attar Rabbani or incorporated by or under a Central Act, a
Provincial Act or a State Act, and includes any

T
such institution as may, in consultation with
A sad state of affairs is revealed he last four years have seen a the University concerned, be recognised by
when one studies the situation number of new initiatives under- the Commission in accordance with the reg-
taken by the central government ulations made in this behalf under this Act.
vis-à-vis higher education in
towards reforming university education. The Radhakrishnan Commission on
“state universities”. A decisive Two committees, the National Knowledge university education in its report (1948)
shift in higher educational Commission (NKC) and the Yashpal Com- devoted a chapter on deemed universities.
policy towards reforming the mittee have both made a number of sig- It says,
nificant recommendations towards im- During the earlier years of the nationalist
state universities is required,
proving university edu­cation. This period movement a number of institutions of high-
particularly in the context of has also seen a huge investment in higher er education were established independent
of the government and its support, deter-
the recent debates on the rise of education. The Eleventh Plan allocation
mined to work out their own destinies in the
“deemed-to-be-universities”. towards higher education is a whopping spirit of free India. Though their difficulties
Rs 84,942.79 crore, a very high increase as and discouragement were great and the
compared to the p­revious Plan. This com- mortality among them high, a few of them
mentary analyses the situation in higher survived and have justified the heroic strug-
gle they made.
education in general and also the contro-
versies vis-à-vis deemed universities. The commission suggested that in o­rder
to give these institutions university status
‘Deemed Universities’ the government may consider adopting
What exactly is a deemed university? Sur- the method of creating universities by
prisingly, the answer seems to be a bit charter. As a consequence, a provision
vague. According to Section 3 of the Uni- was included in the UGC Act of 1956 that
versity Grants Commission (UGC) Act, the institutions which have unique and
19561 the central government may, on the distinct character of their own could enjoy
advice of the UGC, declare, by notification the privileges of a university w­ithout los-
in the official gazette, that any institution ing their distinct character and autonomy.
for higher education, other than a univer- In the first 10 years after the enactment
Attar Rabbani (prince_rabbani@yahoo.com) sity, shall be deemed to be a university for of the UGC Act, eight institutions were no-
teaches political science at Ismail Yusuf the purposes of this Act. On such a decla- tified as deemed universities. In the 1970s,
College, Mumbai.
ration being made, all the provisions of the UGC decided that notification under
24 April 24, 2010  vol xlv no 17  EPW   Economic & Political Weekly