Description of Activities
1. OBJECTIVE
This standard establishes the procedure for product design.
2. INPUTSTO THE PROCESS
2.1. Inputs and Suppliers
Project Activities (SAP) - Section of PCP;
Sales Order (OV) and its annexes - Sales;
Service Order (OS) and its annexes - Sales.
2.2. Documents
EE - Electromechanical Specification.
WEG TSQ-3200-Control of Documents.
WEG TSQ-3203 - Records Control.
WEG MC-00113 -CoolingDesign Form (VTR) – Machines Air-Air.
WEG MC-00127 -Cooling Design Form (VTR) – Machines Air-Water.
WEG MC-00128 -CoolingDesign Form (VTR) –Open or ducted Machines.
WEG PR-00336 - Instrumentation Design Form.
WEG PR-00358 - Bearings Design Form.
WEG PR-00370 - Anchoring Design Form.
WII-PED-GR-039- Legal Requirements for the Products for OHSAS 18001:2008.
3. PROCEDURE
WHAT? WHO? HOW?
By:
INPUT DATA
RECIEVE - OV and its attachments (client documents
or others);
Designers or -OS and its attachments (client documents
Analysts Project or others).
Electrical or - Claim type ZC
NO
DATA ARE Mechanical
COMPLETE?
Verifying that the data is complete,
consistent and appropriate, Considering the
YES RETURN TO
REQUESTOR
state of current technology.
REVIEW IS
REQUESTED? YES
NO
According to TSQ-3200, based on internal
SPECIAL UPDATE. PREPARE SPECIAL standards, manuals and design procedures.
ELECTROMECHANICAL ELECTROMECHANICAL
YES
CHANGE
YES
ELECTROM 2
Analyzing the possibility of modifying the
AGNETIC electrical design for the modification of
DATA?
mechanical design.
NO
SPECIAL
COMPONENTS
APPLICABLE? NO
Checking if the machine has components for
YES which no project specialist exist.
Filling out form (s) of project specialist
components (MC-00113, MC-00127, MC-
FILL FORM(S) SPECIFIC
AND / OR E-MAIL 00128, PR-00336, PR-00358 and / or PR-
00370) and saving it (s) in the project folder
or sending email.
Designer or
Analyst of
IS REQUESTED
Mechanical
A CRITICAL
NO
Project Verifying the Order or Activity scheduled by
ANALYSIS OF PCP.
DESIGN AND
MANUFACTURIN
YES
FORWARD ELECTRICAL
DESIGN FOR PCP Concluding activity in SAP.
Mod. 890-4
5
S
TSQ-0003 ENG T
A
N
D Page 4 of6
A
R Rev. Nº 9 01/18
D
5
According to TSQ-3200, based on internal
standards, manuals and design procedures.
DETAIL THE MECHANICAL
DESIGN AND REGISTER
MATERIALS
YES
Analyzing QC note.
REVIEW NOTE QC
NO
OK?
Designer or
Project Analyst
Electrical and / or
2 According to TSQ-3203.
Mechanical
YES
FILE RECORDS
Mod. 890-4
S
TSQ-0003 ENG T
A
N
D Page 5 of6
A
R Rev. Nº 9 01/18
D
4. PROCESS OUTPUT
4.1.Results of theProcess
Performance calculations and / or verification;
Final Bill of material of the product;
Documentation for client;
Project Activity completed in SAP for actions of PCP.
4.2.Customers
Activity List and Technical Project completed - PCP;
Documentation to customer - Sales.