Republic of the Philippines

PROVINCE OF BUKIDNON
Municipality of Don Carlos

OFFICE OF THE MUNICIPAL ENGINEER

BUILDING ASSESMENT ON GOVERTMENT AND PRIVATERESIDENTIAL HOUSES


(conducted after the occurrence of earthquake last November 18,2019 in Kadingilan, Bukidnon

NO. PART OF STRUCTURES DATE FINDINGS/ REMARKS RECOMMENDATIONS ESTIMATED


ESTABLISHMENT INSPECTED
INSPECTED OBSERVATIONS DAMAGED COST
1 Multi Purpose Building-1 2nd Floor Beams 11/22/2019 major cracks Unsafe For Demoition 200,000.00
Cabadiangan,DC Bukidnon 2nd Floor conc Slab pm major cracks Unsafe For Demolition 150,000.00
concrete Stair pm major craks unsafe For Demolition 50,000.00
2 Multi-Purpose Building-2 2nd floor conc. Peremeter wall 11/22/2019 major cracks unsafe for demolition/replacement 50,000.00
Cabadiangan,DC Bukidnon 2nd Floor conc. partition wall PM major cracks unsafe For demolition/replacement 25,000.00
concrete column PM minor cracks (plaster only) safe rectify with conc epoxy none
Ground floor peremeter wall PM major cracks for demolition/replacement 30,000.00
unsafe

3 Renato Bantaculo Res. Kitchen wall 11/22/2019 partial damage of Chb wall for replacement 5,000.00
unsafe
Cabadiangan,DC Bukidnon pm.
4 Barangay Hall 2nd Floor Concrete Arc 11/22/2019 Concrete Arc was parially Detouched for demolition 15,000.00
unsafe
Kawilihan,DC Bukidnon pm from the Conc column
2nd floor Concrete wall pm major cracks on almost 20% rectify with conc cement
of the entire 2nd floor wall safe and epoxy 15,000.00
ground floor column pm minor cracks (plaster only) safe rectify with concrete cement and epoxy 10,000.00
glass wall pm 15% damage on glass wall unsafe and epoxy
5 Lanie ong's residence Conc. Column 11/22/1019 Transversal Cracks on Columns Unsafe for demolition 500,000.00
with 10mm/12mm longitudinal bar only
as main reinforcement and
not plastered despite that honeycomb
had occurred after pouring
Prepared and Conducted by
Engr. SALUSTIANO G. DEITA,JR.
Engineer-I Checked and Reviewed By
Engr. JUFREY LACORTE
Municipal Engineer
Page 2

15.1 BREAKDOWN OF ESTIMATED PROCEDURES % OF TOTAL AMOUNT


I - ESTIMATED CONTRACT COST:
A. DIRECT COST:
1. Materials #VALUE! 75,000.00
2. Labor #VALUE! #VALUE!
3. Equipment Expenses/Rental
4. Materials, Testing 7 Quality Control (1%)
5. FIBECO remittance 25%
B. INDIRECT COST:
1. OCM (8% to 12% of A)
2. Contractor's Profit (10% to 12% of A%P1)
3. Contractor's Tax (10.5% of A2-A3)

Sub-total . . . . . . . . . . . . . . . . . . #VALUE! #VALUE!

(15.2) ESTIMATED GOVERNMENT EXPENDITURES:

1. Preliminary Engineering Share (1.5%)


2. Soil Exploration, Materials Test (1.5%)
3. Project Management (2%)
4. Supervision
5. Central Office Share (0.50%)
6. Regional Office Share (0.50%)
7. Mobilization/Demobilization
8. PBAC
Sub-total . . . . . . . . . . . . . . . . . .
(15.3) PHYSICAL CONTINGENCIES (up to 5% of the
estimated contract cost) #VALUE! 86.50
TOTAL ESTIMATED PROJECT COST #VALUE! #VALUE!

Prepared by: Checked by:

ENGR. SALUSTIANO G. DEITA JR. ENGR.JUFREY A. LACORTE


Engineer I Municipal Engineer

APPROVED:

MEDARDO P. PERATER
Barangay Captain
Republic of the Philippines
PROVINCE OF BUKIDNON
Municipality of Don Carlos

MUNICIPAL ENGINEER'S OFFICE

INDIVIDUAL PROGRAM OF WORKS

NAME OF PROJECT/LOCATION: Date: September 25, 2019


Conversion of Assembly Hall into 5-Offices Appropriation: Php 400,000.00
San Roque, Don Carlos, Bukidnon Source of Fund: Provincial Assistant Fund
IssueObligated Authority:
PROJECT CATEGORY Duration: 60 CD
PUBLIC BUILDINGS Desirable Starting Date:
Mode of Implementation: BY ADMIN.
PROJECT DESCRIPTION:
Provision of 5 office rooms and 2.0m x 2.0m cr,w/ tiles, painting, plumbing w/ septic vault and electrical works, including
replacement of rotten ceiling board and roofs as per approved POW

MAXIMUM EQUIPMENT REQUIREMENT TECHNICAL PERSONNEL REQUIRED


DESCRIPTION NO DESCRIPTTION NO. DESCRIPTION NO. DESCRIPTION NO.
Foreman 1
Mason 2 tile setter 3
carpenter 2 plumber 1
tinsmith 1 painter 2
electrician 1
Laborer 4
ESTIMATED COST OF PROPOSED WORK
ITEM QUANTIT DIRECT
NO. DESCRIPTION % OF TOTAL Y UNIT COST(TOTAL) UNIT COST

I conc. wall 0.00% no cracks sq.m - 300,000.00


II 0 #VALUE! rusted memsq.m none -
III Err:509 0.00%no noticeable cracks
lot - -
IV 2nd floor Concrete wall 0.00%
of the entire 2nd floor
lot wall - -
V 0 0.00% 0.00 sq.m - -
VI 0 0.00% 0 lot - -
VII 0 0.00% 0.00 0 - -
VIII 0 0.00% 0 0 - -
PHYSICAL CONTINGENCY 100.00% 86.50

#VALUE! 86.50