DSS & DFDS details activity and its BOQ

BOQ
Sr. No. Job Description UOM QTY.
1 Excavation & Backfilling M3 40

2 Pipe Laying & Jointing (Above ground) INM

3 Pipe Laying & Jointing (Under ground) INM


4 Welding joint for Flange/Fitting etc. IND

5 Valve /Fitting Erection

IND
6 Structural Fabrication MT NIL
7 Structural Erection MT 5
8 Anchoring of Bolt EA 402
9 Sprinkler fixing for DSS Location -1 EA 22
10 Sprinkler fixing for DSS Location -2 EA 24
11 Nozzle Fixing for DFDS for entire circuit EA 88

Equipment Erection :
12 Alignment, Primary & Secondary grouting

a) Pump - Location 1 EA 2
b) Pump - location 2 EA 2
c) Compressor EA 1
d) Receiver Tank including Hydrotest EA 2
e) Hoist EA 2

SCOPE OF WORK FOR INSTALLATION & COMMISSIONING OF DSS & DFDSS AT BOLANI MINES
BASU ENGG SCOPE OF WORK:
1. Supply of Drawings to execute the work
2. Oxyegn, LPG Cylinder, welding machine with cutting set
3. Hydra, JCB, Temporary Ladder etc. As per site requirement
4.Supply of all materials like Pipes with feetings, pump, compressor, valves, sprinklers & Nozzles
5 Electrical and automation
6. Supply of Hoist for erection and testing
7.Water tank for location 2
8. Paint for pump house and pipe painting
9.Arrange for guest house on chargeable basis
10. Necessary supportting structure and foundation bolts including LT bolts
11. All PPEs
12. Supply of grouting materials
CONTRACTOR SCOPE OF WORK:
1. Supply ofAll consumable items
2. Grouting of pumps as others item as per site requirement ( Civil activies)
3. Civil work like painting/glass fixing etc. will be on "Manpower Supply" basis.
4. Painting of pipeline & structures and white washing of pump houses( both 1 &2).
5.Erection hoist for both the pump houses
6. Re storation of both the pump houses ( complere jobs including civil)
7.Laying of pipes, valves, sprinklers, Nozzles and others accessories as per site requirements for DSS & DFDSS
8. Testing of all sprinklers and Nozzlesafter commissioning
9. Installation of Pumps , compressor at repective location as per instruction
10. Completion of work with in 6 weeks
MS PIPE (AS PER IS :1239 MEDIUM ) :-
• 150 NB -60 MTRS
• 125 NB-430 MTRS
• 80 NB-390 MTRS
• 65 NB-220 MTRS
• 50 NB -430 MTRS
• 40 NB-1300 MTRS
• 25 NB-1460 MTRS
• 20 NB-400 MTRS
• 15 NB-500 MTRS

150 NB -30 MTRS


FOR 80,65 ,125 & 150 NB PIPE
VALVE
• 150 NB -7 NOS.
• 125 NB-2 NOS.
• 80 NB-10 NOS.
• 65 NB-2 NOS.
• 50 NB -4 NOS.
• 40 NB-8 NOS.
• 20 NB-40 NOS.
• 15 NB-40 NOS.

M16 X 150 LG

SS & DFDSS AT BOLANI MINES


alves, sprinklers & Nozzles

es( both 1 &2).

per site requirements for DSS & DFDSS