Академический Документы
Профессиональный Документы
Культура Документы
19 Idler pulley bearing sleeves & locks check / replacement Bearing sleeve 2 Nos 2 2
20 Heat exchanger pulley belt inspection / Replacement HE belt ( 5H5V 1 Nos 1 nos 0
2120 ( combined belt-5
groove )
Heat exchanger Idler pulley bearing inspection / Alignment /
21 Replacement HE IP bearing 2 Nos 0 0
Instruments
36 Control panel wiring inspection / cleaning
37 Regulator flushing/Replacement Regulator 1 nos 1 1
38 Pressure transmitter impulse line check
Others
39 Hand gloves 12
40 Cotton waste 5kg
41 Spuuze 3
42 Insulation tap 5
43 Multimeter probe 2
44 Small tubler 1
45 Detergent powder 2kg
Total Manpower required – 13