Вы находитесь на странице: 1из 5

BANDAR ABBAS

SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR ANCHOR FLANGE CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. . Rev.
Code
1117 ED 00 PL SP 002 A2 PAGE 1 of 5

SPECIFICATION
FOR
ANCHOR FLANGE

A2 18-APR-2015 FINAL ISSUED H.NOROOZPOUR M.PALVAN F.ATAEI


A1 09-MAR-2015 ISSUED FOR APPROVAL H.NOROOZPOUR M.PALVAN F.ATAEI
A0 15-FEB-2015 ISSUED FOR APPROVAL H.NOROOZPOUR M.PALVAN F.ATAEI

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR ANCHOR FLANGE CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. . Rev.
Code
1117 ED 00 PL SP 002 A2 PAGE 2 of 5

REVISION INDEX

REVISION REVISION
SHEET NO. SHEET NO.
A0 A1 A2 A3 A4 A5 A0 A1 A2 A3 A4 A5
1 X
2 X
3 X
4 X X
5 X X

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR ANCHOR FLANGE CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. . Rev.
Code
1117 ED 00 PL SP 002 A2 PAGE 3 of 5

Table of Content

1. INTRODUCTION .................................................................................................................................................... 4
2. SCOPE ...................................................................................................................................................................... 4
3. DEFINITIONS .......................................................................................................................................................... 4
4. REFERENCES ......................................................................................................................................................... 4
5. MODIFICATIONS, CHANGES AND/OR ADDITIONS / DELETIONS .............................................................. 5

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR ANCHOR FLANGE CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. . Rev.
Code
1117 ED 00 PL SP 002 A2 PAGE 4 of 5

1. INTRODUCTION

National Iranian Oil Engineering and Construction Company intend to construct a 26” product pipeline to transport
outlet products (Gas oil, Kerosene & Gasoline) from new Bandar Abbas refinery (Setareh Khalij Fars under
construction) to the center of country (Rafsanjan-Terminal) including 8” branch pipeline to Sirjan. This pipeline
is going to transport 300,000 BPD Gasoil, 330,000 BPD kerosene, 360,000 BPD Gasoline products through Bandar
Abbas,Ghotb-Abad and Mehraran Pump Stations with considering all passive defenses & HSE design criteria.

2. SCOPE

This specification covers the minimum requirements for the purchase of Anchor Flange for use to Bandar Abbas
Sirjan-Rafsanjan 26˝ New Product Pipeline.
This document is not all-inclusive and shall not be used to modify or supplement the CONTRACT.

3. DEFINITIONS

Within the context of this document, the following definitions will be applicable:

PROJECT: Bandar Abbas Sirjan-Rafsanjan 26˝ New Product Pipeline


CLIENT: National Iranian Oil Engineering and Construction Company (NIOEC)
END USER: Iranian Oil Pipeline and Telecommunication Company
MANAGEMENT CONSULTANT: Pars Consulting Engineers
CONTRACTOR: Consortium of ODCC/Payandan/Tehran Jonob

4. REFERENCES

Throughout this Specification, the following dated and undated standards/ codes are referred to. These referenced
documents shall, to the extent specified herein, form a part of this Specification.
For undated references, the latest edition of the referenced document (including any supplements and amendments)
applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the cited date shall mutually be agreed upon by
NIOEC and the Vendor/Contractor.

NIOEC-SP (NIOEC SPECIFICATIONS)


NIOEC-SP-50-53(1) “NIOEC Specification for Anchor Flange, 2014”

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR ANCHOR FLANGE CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. . Rev.
Code
1117 ED 00 PL SP 002 A2 PAGE 5 of 5

5. MODIFICATIONS, CHANGES AND/OR ADDITIONS / DELETIONS

This specification is based on NIOEC-SP-50-53(1).


The following modifications, changes, and/or additions/deletions to Standard No. NIOEC-SP-50-53(1) considered
covering the requirements of "Bandar Abbas - Sirjan - Rafsanjan 26" New Product Pipeline".

NO CHANGE TO
NIOEC-SP-50-53(1) (NIOEC Specification for Anchor Flange, 2014)

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14

Вам также может понравиться