STANDARD OPERATING PROCEDURE

SOFTWARE DEPARTMENT

DOCUMENT NO: CYB/SOFT/SOP/001/18


CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 2 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Prepared By Date Signature


Godwin Agbon 20/02/2018

Godwin Agbon 24/06/2019

Reviewed By Date Signature


Okosodo Evans 26/06/2019

Joe Onwubuya 07/05/2018

Approved By Date Signature


Stanley Oduah 08/05/2018

Stanley Oduah 26/06/2019

Revision Number 04 Date of Issue: June 2019

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 3 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Table of Contents
1.0 INTRODUCTION...........................................................................................................................2
2.0 SCOPE...............................................................................................................................................2
3.0 DEPARTMENTAL/PROCESS QUALITY OBJECTIVES.............................................2
4.0 INTERNAL COMMUNICATION..............................................................................................2
5.0 DEPARTMENT / OPERATION MEETINGS.....................................................................2
6.0 INFRASTRUCTURES NEEDED............................................................................................2
7.0 DOCUMENT ARCHIVING........................................................................................................2
8.0 PROCESS DESCRIPTION.......................................................................................................2
8.1 Project Management........................................................................................................6
8.2 Requirements Gathering & Analysis......................................................................9
8.3 System Architecture & Design.................................................................................11
8.4 Coding/Development....................................................................................................13
8.5 Software Testing and Deployment..........................................................................16
8.6 Sytem Support..................................................................................................................18
8.7 Change Request................................................................................................................20
8.8 Servers Monitoring..........................................................................................................22
8.9 Internal Requisitions.....................................................................................................25
9.0 APPENDIX I: ORGANOGRAM FOR SOFTWARE GROUP.........................................27

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 4 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

1.0 Introduction

Software department develops and implements a Quality management system to


demonstrate its ability to consistently provide software products and services that meet or
exceed customers’ expectation and regulatory body requirements, and to address customers’
satisfaction through the effective application of the system, including continual
improvement and the prevention of nonconformity in accordance with international
standards and best global industry practice.

2.0 Scope

The scope of these processes covers software products and activities being carried out by
Software Department, as contained in the following key milestones that represent
chronological steps we use for software development, deployment and maintenance.

 Request initiation (Request sources includes: Marketers, Software Group,


Direct Customer Request, Stakeholders, Others)
 Software Requirements
 Software analysis, planning and design
 Coding (Development)
 Testing
 Deployment
 System Support/Maintenance

3.0 Departmental/Process Quality Objectives

 To ensure that at least 80% of our projects are completed within each project
schedule timelines.

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 5 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 To ensure that 80% of our software documents are in compliance with Capability
Maturity Model Integration (CMMI) standards templates.
 To create and implement at least one innovative solution yearly.
 To continually improve the quality of our products and services by ensuring that
customers’ complaints and incidents are resolved within 48hours.

4.0 Internal Communication

The department ensures adequate Internal communication and information flow using
various methods such as:
 Emails
 Telephones discussions
 One-on-one meetings
 Staff/team meetings
 Weekly/Monthly Reports
 And other communication means as applicable and as approved by the
management.

5.0 Department / Operation Meetings

Departmental meeting holds at least once in a month. The meeting could be


postponed to another day due to emergency presentation/meeting with a customer. It
is usually a brainstorming session, knowledge sharing or/and a forum for software
projects review.

Minutes of the meeting are fully documented and maintained in the department
intranet portal for future reference.

6.0 Infrastructures Needed

The infrastructures required by the department to achieve results are as follows:

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 6 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 Good workspace and associated utilities (chair, tables, shelves, AC, etc.)
 Necessary hardware: PCs, Laptops, Servers, etc.
 Software: Microsoft Office Suite, Microsoft operating systems, Linux operating
systems and different development tools such as Visual Studio, SQL
Management Studio, Visual Studio Team Services and Android Studio, Flutter.
 Supporting services such as Internet and LAN.

7.0 Documents Archiving

Department projects artifacts and other softcopy documents are kept in SharePoint
repository. TFS and Visual Studio Team Services are used to keep application source codes
and other development logs.

Other hard copy documents such as filled job orders are kept in shelve. Electronic means of
approval shall be accepted where necessary (Electronic Copies)

8.0 Process Description

8.1 Project Management

Process Objective: This process is to ensure software projects are delivered to time, scope
and quality.

Process Inputs:

 Go-ahead mail from Business Managers

 Job Order / Clients Requirements

 Statement of Work (SOW)

Process Control: List the process controls e.g.

 Project Schedule

 Minutes of Meeting (MOM)

 Project Status Report

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 7 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Process Owner: Project Manager

Related Documentation: List related documents for the process

 Minutes of Meeting (MOM)

 Project Schedule

 Project Plan

 Project Status report

Resources Needed:

 Manpower

 PCs

 Microsoft Office Tools

Process Output:

 Successful completion of project in line with the project schedule

 Satisfied Customer

Retained Documented Information:

 Archived emails

 Project management schedule

Key process indicators (PCI):

 Number of projects completed with Signed off

 Project Schedule Variance (80% completed within scheduled time)

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 8 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Risks:

SN RISK CONTROL/MITIGANT Opportunity

1 Lack of sufficient - Phase implementation based Employment of


resources to on priority technically sound staff
implement the request to improve productivity
- Pull resources from other
project based on priorities

- Contract out or do joint


implementation with partner.

2 Failure of working - Have standby backups Discovery of more


tools electrically or durable working tools
otherwise

Process Steps:

SN PROCESS RESPONSIBLE

1 Initiate project Project Manager

2 Define Project Scope and create Project Plan Project Manager (PM),
Development Team

3 Determine technology and work tools to be Project Manager (PM),


used for the project Development Team

4 Allocate resources and assign teams to Project Manager (PM),


project. Development Team

5 Executing. The project manager ensures that Project Team


the project executed from start to finish

6 Monitoring and Controlling. The project Project Manager


manager tracks project deliverables, monitor
and report on the progress of the project

7 Perform project closing activities and send Project Manager

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 9 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

project closure report.

8.2 Requirements Gathering and Analysis

Process Objective:

 To ensure client’s needs and wants are appropriately and fully (100%) captured and
managed throughout software project life cycle.

Process Inputs:

 Job order / SOW/Email

 Identification of needs based market trend

Process Control:

 Evaluation and validation of the client’s requirements

 Track and monitor requirements

 PM reviews and ensured projects artifacts are updated

Process Owner:

 Project Manager

Related Documentation:

 Email for project initiation or invite

 Job order

Resources Needed:

 Manpower

 Work tools (software and hardware)

Process Output:

 Software Requirement Specification document (SRS)

 Requirement definition list in TFS

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 10 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Retained Documented Information:

 Software specification document (SRS)

 Requirement definition list in TFS

Key process indicators (PI):

 All (100%) customer’s requirements (functional and non-functional) are complete,


consistent and well captured in SRS document.

Risks:

SN RISK CONTROL/MITIGANT Opportunity

1 Incomplete, -Validation of requirement by NA


ambiguous or client sign off
contradictory
requirements

2 High Requirements -Ensure client sign off on new More revenue for the
Volatility requirements company

-Ensure subsequent sprint


product backlog captures the new
requirement

Process Steps:

SN PROCESS RESPONSIBLE

1 Study and understand the customer Project Manager/SME


requirements

2 Conduct requirements elicitation using personal PM/ SME


interview, meetings, questionnaires, brainstorming
sessions, use case of business case analysis.

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 11 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

3 Study existing artifacts from customer systems PM/ SME

4 Identify the queries related to the requirements and PM/ SME


resolves the queries after discussion with the
customer
5 Prepare Requirements Specification Document, to PM/SME
fully capture and prioritize the requirements

6 Requirements validation: Review SRS with the PM/ SME


customers and get approval that the specified
requirements are valid, complete, and correct.

8.3 System Architecture and Design

Process Objective: To provide 100% transformation of requirement specifications into


detailed designs that provide functionalities of the system components and how they work
together to provide desired system.

Process Inputs:

 Software requirement specification (SRS)

 Requirement Definition List

 Statements of Work (SOW)/Job order

Process Control:

 Approved SRS

 Continuous joint design session

Process Owner: Team Lead

Related Documentation:

 Project Management Documents

 Software Requirement Specification

 Design Documents

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 12 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Resources Needed:

 Project Plan Document

 Team Lead

 Project Team

 Microsoft Office Tools

 Internet / Networking facilities

Process Output:

 Technical Design Document (TDD)

Retained Documented Information:

- Design Document

- Updated Software Requirement Specification

Key Process Indicator (PI):

 100% representation of functional software requirements in the system design

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Unclear or Incomplete The design document to be NA


Design Document validated against SRS by team
lead

2 Use of non-agreed To ensure compliance, there Ability to learn other


design methodology. should be approval of design design options
documents by head of
department

Process Steps

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 13 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

SN PROCESS RESPONSIBLE

1 The team studies the SOW/Software requirement Project team


specifications (SRS) to understand the
requirements for the proposed system
2 Based on the requirements, identify and evaluate Project team
all the possible design possibilities using several
sketches and diagrams. The best design option is
selected
3 The selected design is developed in details with Project team
technical aspects of required functionalities
defined (Process Flow diagram, entity relationship
diagram, Database Schema, Use case Scenario,
Architecture Overview etc.).
4 Design document and system architecture Project team
diagram are produced

8.4 Coding / Development

Process Objective:

To ensure 100% implementation of design and software requirements specification to


produce fit for purpose functional application.

Process Inputs:

 Software requirement specification (SRS)

 Design Documents

Process Control:

 Approval of design specifications by stakeholders

 Code Review done by development lead

 Project and Milestones review meeting

 Maintaining risks logs

Process Owner:

 Development Lead

Related Documentation:

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 14 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 Design Document

 Software Requirement Specification

 Coding Standards

Resources Needed:

 Visual Studio Team Services (TFS)

 Microsoft Visual/Android Studio

 SQL Management Studio

 Development Team

 Team Lead

 Internet / Networking facilities

Process Output:

 Functional Application from Integrated Code

Retained Documented Information:

 Updated Code in TFS

Key process indicator (PI):

 Functioning application with 100% implementation of the design specification.

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Unrealistic timelines for The project team should set a -Lessons learnt to
Coding realistic timelines for coding arrive at more
accurate timelines in
the future.

2 Resignation of key One person cannot be on a The chance to test the


developers project alone. Backup is always backup resource
available

3 Incomplete system design The project team should ensure NA


that the system design is done
in line with our agreed design

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 15 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

methodology.

4 Inconsistent code Team lead to ensure code review NA


is conducted at least once every
two weeks to ensure compliance
with company coding standards

5 Provision of backup tools like Discovery of more


Sudden malfunctioning
external hard drive and durable working tools
of development tools mandatory use of TFS.

PROCESS STEPS

SN PROCESS RESPONSIBLE

1 Develop code/modules as per design document Developer

2 Ensure coding standards are followed while Lead Developer, Developer


developing code

3 Perform unit testing and fix defects as per test Developer


cases

4 Perform code review and points out defects for fix Lead Developer
if any

5 Perform smooth Integration of build components Developer


as provided in the design document

6 Ensure updated integrated codes are updated in Lead Developer, Developer


TFS

8.5 Software Testing and Deployment

Process Objective: To ensure that the system/solution is fit for purpose and severe bugs
does not exist in production (0% Error).

Process Inputs:

 Software Requirement Specification

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 16 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 Application Under Test (AUT)/Integrated Code

Process Control:

 Review of testing milestones during review meeting, including defects raised

 Ensure all identified internal defects are fixed to reduce number of external
defects that customer will report

 Ensure closure report is sent via email

Process Owner:

 Test lead

Related Documentation:

 Test Case Document

 Bug/Test Incident Report

 Test Summary/Closure Report

Resources Needed:

 Team Foundation Server

 Telerik /Appium Studio

 Test Lead

 Development Team

 Deployment Team

 Microsoft Office Tools

 PCs, Internet and LAN

Process Output:

 Quality Software Product

Retained Documented Information:

 Test summary report

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 17 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Key process characteristics (TAT/SLA/PI):

- Quality Product delivered in line with the client’s requirements and project schedule

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Insufficient availability of The SRS, Design use cases NA


required documents to the and flow must be available to
tester the test team beforehand.

2 Lack of proper documentation Requirement documents NA


should be legible clearly
/ambiguous requirements worded, and specific.
(Business Requirements,
Software Requirement
Specification, Use Cases)

3 Software builds/Application Development team should do Improvement in the


Under Test (AUT) is handed detailed unit testing. design component
over to the test team with an and unit testing
unanticipated high number of skills
internal bugs/defects

4 Deployed application does not Ensure UAT is signed off the learnt improve ways
cover full requirements of the customer before release and to deploy app to
customer go-live meet customers
expectation

PROCESS STEPS

SN PROCESS RESPONSIBLE

1 Analyze Requirements using SRS Test team

2 Design test cases Test team

3 Execute test cases (Test implementation) Test team

4 Report incidents/bugs to development team. Test team

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 18 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

5 Fix Incidents/bugs Developer(s)

6 Do a retest and regression testing (validation of Test team


defect fixes)

7 Complete User Acceptance Testing Test team/Client

8 Close test and sign off (UAT) Test team/Client

9 Deploy solution/deliver product to client Deployment team

8.6 System Support

Process Objective: To ensure 99% smooth operations for clients using our software by
eliminating or reducing downtime.

Process inputs:

 Customer’s request

 Maintenance update

Process Control:

 Customer’s feedback

 Tester’s feedback

 Response to customers complains (via email/phone call)

Process Owner:

 Support staff

Related Documentation:

 E-mail/Ticketing Log/Issues Log

Resources needed:

 Support staff

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 19 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 Workstation/Equipment

Process Output:

 Satisfied customer

 Acceptable working solution

Key process characteristics (TAT/SLA/PI):

 Response to client issues/request within 48 hours.

Retained Documented Information:

 Archived e-mails

 Issues Log

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Insufficient resources Prioritize support activities Employment of


technically sound staff
to improve productivity

2 Work tools may Substitute work tools should be Discovery of more


malfunction available durable working tools

3 Improper training of Proper training of the trainer, use NA


end users of feedback form and validation
of the training content

Process Steps

SN PROCESS RESPONSIBLE

1 Send complaints to support via e-mail/phone. Customer/Client

2 Support staff gets details from email Support Staff

3 Support staff offers direct level support based on Support/SME

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 20 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

details from the email.

If the case is resolved, send completion message


to client, otherwise escalate by raising change
request.

8.7 Change Request

Process Objective: To ensure client’s features request/issues are resolved within the agreed
turnaround time with the client.

Process inputs:

 Fault calls from clients

 Client’s request

 Continuous improvement suggestions

Process Control:

 Review of the changes to determine if it is major, minor or quick fix.

 Approval of change prior to implementation

Process Owner: Change Control Board (CCB)

Related Documentation:

 Request email

 Change request form

Resources needed:

 Development Team

 Change Control Board

 Deployment Team

 Work Equipment

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 21 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Process Output:

 Satisfied customer

 Working Application

Retained Documented Information:

 Archived emails and other artifacts

 Filled change request forms

Key process indicators (TAT/SLA/PI):

 Updated application that meets customer’s new requirements fully

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Lack of available - Phase implementation based - Employment of


resources to on priority technically sound
implement the request staff to improve
- Pull resources from other productivity
project based on priorities

2 Failure of working - Availability of alternative - Discovery of more


tools electrically or working tools and regular durable working
otherwise backup tools

3 Lack of proper - Ensure there is roll-back plan - NA


regression testing with full backup.

- Undergo thorough regression


and functional testing

Process Steps

SN PROCESS RESPONSIBLE

1 Request for change received via email. Developer/Support Staff

2 Analyze the task to determine level of change Change Control Board (CCB)

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 22 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

3 Assign tasks to developer Unit Head

4 Consider purpose of change and its potential Change Control Board (CCB)
consequence to the QMS

5 Ensure availability of resources Unit Head

6 Implement Change Development Team

7 Conduct Regression testing Test Analyst

8 Deploy updated solution Deployment Team

9 Communicate changes and feedback to Developer / Support Staff


customers and other stakeholders

8.8 LTE Servers Monitoring

Process Objective:

 To ensure 98% availability of all LTE Billing Servers and Infrastructures for good
service delivery.

Process Inputs:

 Servers

 Network Equipment (Router, switch, etc.)

Process Control:

 Weekly Availability Report

 Visit to server room for physical routine check

 Availability of support personnel during maintenance period

 Application Monitoring Software (Porta-Monitor & Manage Engine)

Process Owner:

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 23 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

 Operation Personnel - Billing Unit

Related Documentation:

 LTE Server Infrastructure Spreadsheet

 LTE Server Infrastructure Architecture

Resources Needed:

 Manpower

 Application Monitoring Software (Porta-Monitor & Manage Engine)

 Server

 Network Equipment

Process Output:

 Up and running servers/services

Retained Documented Information:

 LTE Server Infrastructure Spreadsheet

 LTE Server Infrastructure Architecture design

 Availability Report

Key process indicators (TAT/SLA/PI):

- Services Up and Running 24/7/365 days

Risks:

SN RISK CONTROL/MITIGANT Opportunity

1 Non availability of - Provision of Generator and Discovery of another


stable power supply source of power supply

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 24 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

UPS

2 Non Availability of - Provision of LAN to access the Discovery of offline


stable internet server and services methods of application
deployment

3 Malfunction of cooling - Regular maintenance of the NA


system cooling systems

- Routine check of server room

Process Steps:

SN PROCESS RESPONSIBLE

Local LTE Server


1 Monitoring of server continuously for Billing Engineer
availability

2 Billing Personnel login into Manage Engine Billing Engineer


each day to check for alarms for Capacity
Utilization thresholds.

3 If there is any resource over utilized, purchase Billing Engineer


request is made to upgrade the resource
4 Receive purchase new resource parts and Billing Engineer
installed on the servers within period stated in
Change request form

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 25 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

8.9 Internal Requisition

Process Objective: To ensure work items, project funds and/or infrastructure


resources are made available seamless at right time.

Process inputs:

 Requisition form from department (Via intranet/manual)

Process Control:

 Validation of employee (only valid staff can make requisition)

 Approvals from concerned members

Process Owner:

Staff who makes requisition

Related Documentation:

 E-mail

 Application on SharePoint

 Physical application on memo pad

Resources needed:

 Line managers, Requesting Staff

 Procurement Officer

 Store Officer

 IT / work equipment

Process Output:

 Approved request

 Requested Item

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 26 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

Retained Documented Information:

 Request Archive in SharePoint/Memo pad request archive in


Account/Procurement

Key process indicators (TAT/SLA/PI):

 To ensure that all requested items are fully approved and are made available
seamless at right time.

Risks

SN RISK CONTROL/MITIGANT Opportunity

1 Delay in requisition  Constant reminder of approval NA


approval task to those responsible for
it.

 Possibility of delegating
pending task to another
person

Process Steps

SN PROCESS RESPONSIBLE

1 Requisition raised by a staff in the department by Requesting Staff


manually using the memo pad/form.

2 Approval of the request by hand signature Line manager

3 Second level approval of the requisition is done Head of Department

4 Third level approval of the requisition is done ED, DFA

5 Procurement received the request for processing Procurement Officer

6 Good Issues Note is signed to take delivery of the Requesting Staff, Store
resource from store Officer

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .
CLASSIFICATION : INTERNAL USE ONLY
DOCUMENT TYPE :
DOCUMENT CODE : CYB/SOFT/SOP/001/18
STANDARD OPERATING PROCEDURE Revision: 04 Issue: 02
Page 27 of 27
DEPARTMENT : SOFTWARE Date: JUNE 2019

9.0 APPENDIX I: ORGANOGRAM FOR SOFTWARE GROUP

Executive
Director

Head of
Department/
Manager

Service Delivery
Manager (SDM)

Unit Head, Unit Head,


Unit Head, Unit Head,
Financial Unit Head, Digital Project
Enterprise Technology Educational/Lea
Automation Advert/SocialCog Management/Qu
(FINTECH)/Billing rning
ality Assurance

Assistant Assistant Assistant Assistant Assistant


Manager, Senior Manager, Senior Manager, Senior Manager, Senior Manager, Senior
Programmers, Programmers, Programmers, Programmers, Programmers,
Assistant Assistant Assistant Assistant Assistant
Programmers Programmers Programmers Programmers Programmers

This item is the property of CYBERSPACE for sole use by the COMPANY to carry out its operation. It shall not be transferred
to third parties without the written permission of the management .