Вы находитесь на странице: 1из 1

Calculation of fee amount to be charged from road users of NH - 565 from KM 425.400 - Km 466.

650 in the State of AP


(Applicable as per Fee Rules, 2008 as amended)

Rapur (at km 443.800) For the year 2018-19 (w.e.f. 01.04.2019)


MAV (4 - 6
377.4372204 Car LCV Truck/ Bus MAV (3 axles) Oversized Monthly Pass
axles)
1 Base rates 0.6500 1.05 2.2 2.4 3.45 4.2 150
A
Revised 60% of Base Rate 0.3900 0.6300 1.3200 1.4400 2.0700 2.5200 150.0000
base rates 2 Fixed increase (13*3%) B= A * 39% 0.15210 0.24570 0.51480 0.56160 0.80730 0.98280 58.50000
3 Revised base rates C= A+B 0.54210 0.87570 1.83480 2.00160 2.87730 3.50280 208.50000
4 WPI as on 06.01.07 (1993-94 series) D 208.70000 208.70000 208.70000 208.70000 208.70000 208.70000 208.70000
WPI for Dec, 18 (2011-12 series)
Variable 5 E 378.05200 378.05200 378.05200 378.05200 378.05200 378.05200 378.05200
(122.8 x 1.873 x1.641=377.437)
increase
6 40% of increase in WPI (As % of revised base rates) F=(E-D)/D*0.4 0.32458 0.32458 0.32458 0.32458 0.32458 0.32458 0.32458
7 Increase in base rates due to change in WPI G=C* F 0.17596 0.28424 0.59555 0.64969 0.93393 1.13695 67.67588
8 Revised base rates (Cummulative) H=C+G 0.71806 1.15994 2.43035 2.65129 3.81123 4.63975 276.17588

Road 9 Road Length in Kms (excluding length of bypass, if any) I 32.900 32.900 32.900 32.900 32.900 32.900
Length 10 Structure >60m on Road Length in Kms J 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
(kms)
11 Net Road Length without structures >60m ( in Kms) K=I-J 32.900 32.900 32.900 32.900 32.900 32.900

Length of the bypass costing more than Rs 10 crores


12 L 8.350 8.350 8.350 8.350 8.350 8.350
Bypass (2.6+5.75 = 8.35Km)
Length M 0.000 0.000 0.000 0.000 0.000 0.000
13 Structure on Bypass Length in Kms
(kms)
14 Net Bypass Length without structures >60m ( in Kms) N=L-M 8.350 8.350 8.350 8.350 8.350 8.350

Structure 15 Total length of Structure >60m (On Road & Bypass) O=J+M 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Length
Converted equivalent road length for Structures >60m (
(kms) 16 P = O * 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
in Kms)
17 Total tollable Road Length in Kms Q=K+P 32.900 32.900 32.900 32.900 32.900 32.900
18 Fee for the road stretch R=Q*H 23.624 38.162 79.958 87.227 125.389 152.648 276.1759
19 Fee for the bypass S = H * N * 1.50 8.994 14.528 30.440 33.207 47.736 58.113
20 Fee for the whole section T=R+S 32.618 52.690 110.399 120.435 173.125 210.761
21 Rounded off fee for single trip U 35 55 110 120 175 210 275
22 Prerounded fee for return trip V = T * 1.50 48.927 79.035 165.598 180.652 259.687 316.141
23 Rounded off fee for return trips W 50 80 165 180 260 315
24 Prerounded fee for monthly pass for 50 trips X = T * 50 * 2/3 1087.258 1756.341 3679.952 4014.493 5770.833 7025.362
25 Rounded off fee for monthly pass valid for 50 single trips Y 1085 1755 3680 4015 5770 7025
Discounted Fee for the commercial vehicles registered
26 Z = T * 0.5 16.309 26.345 55.199 60.217 86.562 105.380
within the district
Rounded off Fee for the commercial vehicles registered
27 AA 15 25 55 60 85 105
within the district

NHAI, RO, Vijayawada

Вам также может понравиться