PROJECT MANAGEMENT

PROJECT :

inspe
CHECKLIST FOR SHEET PILING Ref :

Location : Start Inspection (Date/Time) :


Drawing No. / Rev. No. End Inspection (Date/Time) :
Structure :
Tolerances Required
*Temporary/Permanent

Conformance
to
Item Check-off Items Specs/Stds/
Shop drg
No
√ X NA Non-conformance Corrective Action
(with identity of Elements) Taken / OK?
1 Platform stability of plant &
machinery
2 Materials properly stacked
3 Material quality
4 Material size, weight & length
5 Pile setting out
8 Welding
9 Alignment & guides
10 Proper interlocking
11 -Marking at 1m intervals
-Penetration depth/Toe level
-Noise & vibration monitoring
12 Sheet pile recovery
-Access
-Plant & equipment
-Backfilling
-Material quality
13 Briefing to operators

Checked By :

___________________________________ _____________________ ___________


Project Manager/Designated Staff Signature Date
Sheet Piling Data (extract from specifications/drawings) :