FOR APPROVAL

A 01.07.2019 D.N.Duc H.C.Roh I.B.Wee FOR APPROVAL


Rev Date Prepared Checked Approved Details of Revision
Owner

Owner’s Engineer

Contractor
DOOSAN HEAVY INDUSTRIES VIETNAM

Sub-Supplier

CONSTRUCTION CORPORATION NO.1

Project

NGHI SON 2 BOT THERMAL POWER PLANT PROJECT

Title

METHOD STATEMENT FOR REPAIRING THE LEAKAGE OF


CONCRETE STRUCTURE
Document No. Rev. Page-No.
NS2-DD09-P0ZEN- A 54 Pages
METHOD STATEMENT FOR REPAIRING THE LEAKAGE OF CONCRETE
SURFACE
NS2-DD09-P0ZEN-

RECORD OF REVISION

REV. DATE PAGE AFFECTED DESCRIPTION OF REVISION

A 01.07.2019 All First Issue

Rev A Page 1 of 54
METHOD STATEMENT FOR REPAIRING THE LEAKAGE OF CONCRETE
SURFACE
NS2-DD09-P0ZEN-

CONTENTS

GENERAL................................................................................................................................................3

I. PURPOSE OF WORK....................................................................................................................3

II. PROJECT LOCATION AND PLAN..................................................................................................3

III. PROJECT TECHNICAL REQUIREMENT.........................................................................................4

IV. TIME SCHEDULE, MANPOWER AND EQUIPMENT......................................................................5

V. RESPONSIBILITY..........................................................................................................................6

VI. WORK FLOW CHART...................................................................................................................8

VII. PREPARATION.............................................................................................................................8

VIII. PILLING WORK..........................................................................................................................10

IX. CONCRETE WORK.....................................................................................................................23

X. PC GIRDER WORK.....................................................................................................................27

XI. INSTALLATION OF GIRDER........................................................................................................28

XII. CONSTRUCTION OF BRIDGE DECK SLAB...................................................................................28

XIII. CONSTRUCTION OF RETAINING WALL & QUARTER CONE.......................................................30

XIV. JOB SAFETY ANALYSIS...............................................................................................................31

XV. APPENDIX..................................................................................................................................47

Rev A Page 2 of 54
METHOD STATEMENT FOR REPAIRING THE LEAKAGE OF CONCRETE
SURFACE
NS2-DD09-P0ZEN-

1. Introduction
This working plan describes method of repair for leakage of concrete structure in Nghi Son 2 BOT Thermal
Power Plant Project at Nghi Son, Thanh Hoa province, Viet Nam
The statement consists of Site Preparation, Material Supply, Quality Plan and Safety Plan, related to
Contractor’s responsibility for implementation of the Construction works to comply with Project Specification
and Designs as well as the relevant standard of the Project.
2. Reference document
Project EHS Management Plan
Structural Drawings
Manufacturer’s instruction