Вы находитесь на странице: 1из 2

ISLAMABAD ELECTRIC SUPPLY COMPANY

INSPECTION CERTIFICATE

Contract Agreement No.


ADB-IESCO/TR-III/ICB-01/W-08
Dated 19-03-2014
Procurement of Five (05) Nos. Transmission
Lines – T/Line Material, Construction Survey,
Project Name & Date:
Tower Stacking, Construction Of Tower / Pile
Foundations, Erection, Stringing, Testing and
Commissioning Of 132KV Transmission Lines
On Turnkey Basis (Lot-II) Under Asian
Development Bank Financing-Tranche-III

ICC (Pvt.) Limited, 242-A, Anand Road Upper


Contractor:
Mall, Lahore. Pakistan

M/s. Newage Cables (Pvt.) Ltd.


33-K, Gulberg II, Lahore, Pakistan
Manufacturer:
Factory: 18KM Lahore – Sheikhupura Road,
Lahore

Inspection Call No. & Date: No. 3816 / 6237, dated April 24, 2015

Chief Engineer (PMU), IESCO, No. PMU / ADB / ICB-01 / 1810-14


Islamabad Letter Ref. No. & Date: Lot – 2 / TR-III / ADB, dated May 4, 2015

Inspection Carried out on (date): May 6th & 7th, 2015

It is certified that the material as per above Contract has been inspected at the works of M/s.
Newage Cables (Pvt.) Ltd. In accordance with the opinion based upon visual inspection and
routine tests, the following material has been accepted as per approved
drawings/specifications subject to the notes/instructions laid under this certificate and printed
overleaf.

Sr.
Total Already Now Now Now
No Description Balance
Quantity Accepted Offered Accepted Rejected
.
29.61 mm dia,
517.38 mm2, 304.02 304.02 304.02
1 NIL NIL NIL
45/7 ACSR "RAIL" KM KM KM
Conductor
9 mm Dia, Earth wire 27.74 27.74 27.74
2 NIL NIL NIL
7/3 mm KM KM KM

Page 1 of 2
ISLAMABAD ELECTRIC SUPPLY COMPANY

Notes / Instructions:

1. Station of Inspection M/s. Newage Cables (Pvt.) Ltd.


Factory: 18 KM Lahore – Sheikhupura Road, Lahore

2. Inspection carried out by 1. Mr. Masood Ahmed Burza,


Dy. Manager (Procurement), IESCO Islamabad
2. Mr. Muhammad Azeem Zardari
SDO T&G-II GSC Directorate IESCO, Islamabad

3. This certificate is issued on the basis of visual inspection and routine tests carried out at
manufacturer’s works.
4. The inspection certificate does not relieve the manufacturer in any way from the
responsibility towards the quality and quantity of the material supplied under the contract.
5. If later, any discrepancy is observed in quality or quantity of the material, the same will
be replaced by the manufacturer at its own cost.
6. The material and goods supplied are covered under warranty clause of the Contract.

Masood Ahmed Burza Muhammad Azeem Zardari


Dy. Manager (Procurement), SDO T&G-II GSC Directorate IESCO,
IESCO Islamabad Islamabad

Endorsement No. _________________ Date: ________________

Cc:

1. Chief Engineer (Development), PMU, IESCO, Islamabad.


2. Chief Engineer (Procurement), PMU, IESCO, Islamabad..
3. ICC (Pvt.) Limited, 242-A Anand Road, Upper Mall, Lahore, Pakistan

Page 2 of 2

Вам также может понравиться