Market Rate Items

1 Steel Reinforcement for R.C.C. work including Straighteninig, Cutting, Bending,


Placing in Position and Binding all complete above Plinth Level
a Thermo Mechenically treated bars of glade Fe 500 d or more.
Against Item no. 4.3.1
Detail for One Quintals
S.No Description of Item Unit Qty Rate Amount

i Deformed Twisted Bass including quintal 1.05 4150.00 4357.50


5% wastage
ii Carriage of Steel Tonne 0.11 92.24 9.69
iii Cover Block L.S. 26.00 2.00 52.00

Labour for Strainghting, Cutting,


Bending, Binding, and Placing in
Position
a Black Smith 1st Class Day 1.00 733.00 733.00
b Beldar Day 1.00 503.00 503.00
c Sunderies 2 binding wire L.S. 26.91 2.00 53.82
5709.01
Add 1 % Water Charges 57.09
X' 5766.10
Add GST on 'X' (multiplaying 810.13
factor 0.1405)
6576.23
Add 15% on CP&OH 986.43
Y' 7562.66
Add 1% Cess on Y 75.62
7638.28
Say Rs. 76.38 Per Kg

2 Add for Using extra cement in the items of design mix over and above the
Specified Cement content their In.

Against item no. 4.5


Detail for One Quintals
S.No Description of Item Unit Qty Rate Amount
a PPC Cement Tonne 0.10 4320.00 432.00
b Carriage of Cement Tonne 0.10 92.24 9.22
441.22
Add 1 % Water Charges 4.41
445.63
Add GST on (MF 0.1405) 62.61
508.25
Add 15% on CP&OH 76.23
584.48
Add 1% Cess 5.84
590.32
Say Rs. 590.32 Per Quintal
Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in
EI 3.1
superstructure above plinth level up to floor five level in :
3.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
S.No Description of Item Unit Qty Rate
MATERIALS :
Details of Cost for 1Cum material
F.P.S (non modular) Clay flyash bricks of
class designation 7.5 ,Cement Morter 1:6
7008 (1Cement : 6 Coarse sand) 1000 0.494 4800.00

Rate as per Item Number 3.11 of


3.11 SH: Mortars Cum 0.25 3356.15

2201 Carriage of bricks 1000 0.494 276.72


9999 Sundries L.S. 2.73 2.00
LABOUR:
0123 Mason (Brick layer) 1st class Day 0.47 738.00
0124 Mason 2nd class Day 0.47 679.00
0115 Coolie Day 1.80 558.00
0101 Bhishti Day 0.20 617.00
9999 Scaffolding L.S. 8.97 2.00
Extra labour element required for lifting of
materials above floor two level upto floor
V level (0.75x1.5= 1.13)

115 Coolie Day 1.13 558.00


TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost Per Cum.
Say
n

Amount

2371.20

839.04

136.70
5.46

346.86
319.13
1004.40
123.40
17.94

630.54
5794.67 W
57.95
5852.61 X
822.29
6674.91 Y
1001.24
7676.14 Z
76.76
7752.90
7752.90
Providing and fixing magnetic catcher of approved quality in cupboard / ward robe
EI 4.1
shutters, including fixing with necessary screws etc. complete.
4.1.1 Triple strip vertical type
S.No Description of Item Unit Qty Rate
MATERIALS :
Details of cost for 1 no.
Magenatic catcher triple strip verticle
8714 type. Each 1.000 24.00

9999 Sundries including screws and fixing LS 2.60 2.00


Charges
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost Per Cum.
Say
robe

Amount

24.00

5.20

29.20 W
0.29
29.49 X
4.14
33.64 Y
5.05
38.68 Z
0.39
39.07
39.05
Providing and fixing 12 mm thick panelling or panelling and glazing in panelled or
panelled and glazed shutters for doors, windows and clerestory windows (area of
EI 5.1 opening for panel inserts excluding portion inside grooves or rebates to be
measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm
thick.

5.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)


S.No Description of Item Unit Qty Rate
Details of cost for shutters of a door
with 2/3rd panelling 200x108cm =2.16sqm.
Panel area =4x45.1x36.55cm = 0.66sqm.
MATERIAL
Plywood 4x47.2x38.65cm = 0.73sqm+
Add for wastage @ 10% = 0.07sqm.
Total = 0.80 sqm.

18mm thick marine plywood conforming


8724 to IS:710 Sqm 0.80 675.00

2201 Carriage of Plywood L.S. 1.82 2.00


LABOUR:
0111 Carpenter 1st class Day 0.57 738.00
9999 Sundries L.S. 4.42 2.00
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost of 0.66 sqm.
Cost of 1 sqm.
Say
m

Amount

540.00

3.64

420.66
8.84
973.14 W
9.73
982.87 X
138.09
1120.96 Y
168.14
1289.11 Z
12.89
1302.00
1972.73
1972.73
EI 6.1 Centrifugally cast (spun) iron socketed pipe as per IS: 3989
6.1.1 75MM
S.No Description of Item Unit Qty Rate
Details of cost for 16.92 m
(1.75mx10)-(9x0.065m) = 16.915 m.
say 16.92 m
MATERIAL
C.C.I.(spun) socketed soil, waste and
3621 vent pipe 1.80 metres long:75mm dia Each 10.50 1100
including 5% allowance for wastage

9999 Scaffolding L.S 80.73 2.00


9977 Carriage of Materials L.S. 40.38 2.00
LABOUR:
0116 Fitter (Grade-1) Day 0.35 738.00
0100 Bandhani Day 0.17 617.00
0114 Beldar Day 0.70 558.00
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost for 16.92 m pan
Cost per metre
Say
Amount

17.35.2.2

11550.00

161.46
80.76

258.30
104.89
390.60
12546.01 W
125.46
12671.47 X
1780.34
14451.81 Y
2167.77
16619.58 Z
166.20
16785.78
992.07
992.07
Providing lead caulked joints to sand cast iron/centrifugally cast (spun) iron
EI 7.1 pipes and fittings of diameter :
7.1.1 75MM
S.No Description of Item Unit Qty Rate
Details of cost for one joint
MATERIAL
1397 Pig lead Kilogram 0.88 176.00
1881 Spun yarn Kilogram 0.09 50.00
9999 Kerosene oil, fuel and other sundries L.S. 10.79 2.00
9977 Carriage of Materials L.S. 1.43 2.00
LABOUR:
0116 Fitter (Grade-1) Day 0.05 738.00
0117 Assistan fitter or 2nd class fitter Day 0.05 679.00
0114 Beldar Day 0.09 558.00
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost per metre
Say
Amount
17.58

154.88
4.50
21.58
2.86

36.90
33.95
50.22
304.89 W
3.05
307.94 X
43.27
351.20 Y
52.68
403.88 Z
4.04
407.92
407.92
Providing lead caulked joints to sand cast iron/centrifugally cast (spun) iron
EI 7.1 pipes and fittings of diameter :
7.1.1 75MM
S.No Description of Item Unit Qty Rate
Details of cost for one joint
MATERIAL
Clamps and M.S. stays including bolts
1335 and nuts for 75 mm pipe Each 1.00 37.00

9988 Carriage of materials and fixing charges L.S. 10.79 2.00


LABOUR:
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost per metre
Say
Amount
17.59

37.00

21.58

58.58 W
0.59
59.17 X
8.31
67.48 Y
10.12
77.60 Z
0.78
78.38
78.38
EI 7.1 Providing and fixing plain bend of required degree.

7.1.1 75MM

7.1.1.1 Centrifugally cast (spun) iron socket &


spigot (S&S) pipe as per IS: 3989
S.No Description of Item Unit Qty Rate
Details of cost for one joint
MATERIAL
Centrifugally Cast iron Plain bend for 75 mm
1620 pipe Each 1.00 210.00

9988 Carriage of materials and fixing charges L.S. 10.79 2.00


LABOUR:
TOTAL
Add 1 % Water Charges
TOTAL
Add GST on 'X' (multiplaying factor 0.1405)
TOTAL
Add 15% on CP&OH on "Y"
TOTAL
Add cess @ 1% on "Z"
Cost per metre
Say
Amount
17.39

210.00

21.58

231.58 W
2.32
233.90 X
32.86
266.76 Y
40.01
306.77 Z
3.07
309.84
309.84