EQUIPMENT INSPECTION INDEX STATE (RFCC / Utility Area))

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 REV. 0 (29 / 12 / 2013)

ETA Chipping Piping Lube Final


Equipment Erec. FDN. / Poket EL. / Formwor Oil Line Lube Oil Coupl./C Final
FDN. / Centerin 2nd Final Pre(1st) 2nd Access. Alignm. Final Oil Visual
No. Station ITEM. No. Equipment Name Dimension Weight Kw EL. + TYPE Qt'y ON SITE STR. Erection Grout. Level or k/1st (Hydro.) Line over Check(Co Remark
Check Padding g Grouting Grout. Alignm. Alignm. Assembly (Suc,/Dis Alignm. /Change Punch
(W*L*H) (Ton) Rev. Rev. State Plumb. Grout. Clen. Flush. Assem. mm.)
h.) / Change Inspect.
EQUIPMENT INSPECTION INDEX STATE (RFCC / Utility Area))
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 REV. 0 (29 / 12 / 2013)

ETA Chipping Piping Lube Final


Equipment Erec. FDN. / Poket EL. / Formwor Oil Line Lube Oil Coupl./C Final
FDN. / Centerin 2nd Final Pre(1st) 2nd Access. Alignm. Final Oil Visual
No. Station ITEM. No. Equipment Name Dimension Weight Kw EL. + TYPE Qt'y ON SITE STR. Erection Grout. Level or k/1st (Hydro.) Line over Check(Co Remark
Check Padding g Grouting Grout. Alignm. Alignm. Assembly (Suc,/Dis Alignm. /Change Punch
(W*L*H) (Ton) Rev. Rev. State Plumb. Grout. Clen. Flush. Assem. mm.)
h.) / Change Inspect.