INSPECTION AND TEST PLAN FOR FABRICATION & ASSEMBLY OF 000-001
Page : 2 of 4
1. BEFORE EXECUTION
DRP001-PUC-SPE-
1.2 Welding Procedures (PQR + WPS) V-000-006, API 650
ASME IX, AWS D1.1 Third Party format H/R Q H R/A Welding Procedures
DRP001-PUC-SPE-
1.3 Welder Performance Qualifications (WPQ) V-000-006, API 650
ASME IX, AWS D1.1 Third Party format H/R Q H R/A Welders Qualifications
DRP001-PUC-PRO- DRP001-PUC-PRO-L-
1.6 Shell Plates, Nozzles,... Receiving Inspection L-000-002 000-002 paragraph 5 CON-ROT-09 H/R C H/R S
DRP001-PUC-SPE-
DRP001-PUC-SPE-V- Certificates 3.1 type, acc. To ISO-
1.7 Material Certificates W-000-017 and API
000-006,Section 6 N/A H Q R R
650 10474
RP01-PUC-SPE-C-
1.9 Civil Works Accepted for Mechanical Assembly 000-005 & Project - CON-ROT-10 H/R Q H/R S
Procedures
2. DURING EXECUTION
DRP001-PUC-SPE-
2.1 Material Identification and marking V-000-006 , API 650
API 650 N/A W C W S
BOTTOM TANK
2.2 Annular plate laying (laying, orientation, fit-up) API 650 Project Drawing N/A H C/Q W S
DRP001-PUC-SPE-
DRP001-PUC-SPE-W-
2.3 Welding works (annular plate & bottom plates) W-000-006 & API
000-006 & API 650 N/A H Q W S
650
CON-PIP-04
API 650 & DRP001- API 650 & DRP001-PUC-
2.5 Annular bottom plate NDTs (if required) PUC-SPE-W-000-006 SPE-W-000-006 CON-PIP-05 W Q W/R S
Third Party format
DRP001-PUC-SPE- ADRP001-PUC-SPE-V-
2.6 Levelling Bottom Checked V-000-006; API 650 000-006; Seciton 12 CON-CIV-40 H Q W W
CON-PIP-04
NDE´s Performed (MT, PT, RT) DRP001-PUC-SPE- API 650 (Sec. 7.3 & 8.1&
CON-PIP-05
2.7 V-000-006, API 650 , DRP001-PUC-SPE-W- H Q W/R W
(if required) ASME V 000-006 CON-PIP-03
Third Party format
DRP001-PUC-ITP-V-
DUQM ITP REF.:
INSPECTION AND TEST PLAN FOR FABRICATION & ASSEMBLY OF 000-001
Page : 3 of 4
SHELL TANK
Shell to bottom Visual Examination (fit- up and root DRP001-PUC-SPE- API 650 & DRP001-PUC-
2.9 V-000-006 SPE-W-000-006 CON-STA-19 H Q W S
pass)
CON-PIP-04
DRP001-PUC-SPE-
2.10 Shell to bottom MT/PT (root & final pass) V-000-006, API 650
API 650 paragr. 7.2.4.11 CON-PIP-05 H Q W/R S
Third Party
DRP001-PUC-SPE-
2.11 Vaccum Box Test Performed (if required) V-000-006
API 650 sec.8.6 CON-STA-16 H Q W/R W
Shell plates Welding Visual Examination and DRP001-PUC-SPE- API 650 & DRP001-PUC-
2.12 V-000-006 SPE-W-000-006 CON-STA-19 H Q W S
Welding Map
Check Levelness of Tank Shell Plate (for each Shell DRP001-PUC-SPE- DRP001-PUC-SPE-V-
2.14 V-000-006 ; API 650 000-006, paragraph 12.2 CON-STA-22 W Q W/R S
Plate) (if required)
DRP001-PUC-SPE- DRP001-PUC-SPE-V-
2.15 Check Roundness, Peaking, Bending of Tank shell V-000-006 000-006, paragraph 12.3 CON-STA-22 H Q W S
DRP001-PUC-SPE-
2.16 Appurtenances Marking and Visual Examination V-000-006
API 650 N/A W Q S S
CON-PIP-04
DRP001-PUC-SPE-
2.17 Nozzle NDE´s Performed (PT,MT) V-000-006, ASME V
API 650 sec. 5.7 & 7.3 CON-PIP-05 H Q W/R S
Third Party
DRP001-PUC-SPE-
2.18 Nozzle Reinforcement Pneumatic Test V-000-006
API 650 CON-STA-17 H Q H W
ROOF TANK
DRP001-PUC-SPE-
2.19 Roof Welding Visual Examination and Welding Map V-000-006
API 650 CON-STA-19 H Q W/R S
Vaccum Box Test Performed According to DRP001-PUC-SPE- API 650 Paragr. 7.3.3a &
2.21 V-000-006 8.6 CON-STA-16 H Q W/R W
Procedure (if required)
DRP001-PUC-SPE-
2.23 Nozzle Reinforcement Pneumatic Test V-000-006
API 650 CON-STA-17 H Q W/R W
DUQM REFINERY PROJECT/ 10121
DRP001-PUC-ITP-V-
DUQM ITP REF.:
INSPECTION AND TEST PLAN FOR FABRICATION & ASSEMBLY OF 000-001
Page : 4 of 4
3. AFTER EXECUTION
DRP001-PUC-SPE- RP001-PUC-SPE-V-000-
3.1 Tank Dimensional Control V-000-006 & API 650 006, section 12 CON-STA-20 H Q W W
DRP001-PUC-SPE- RP001-PUC-SPE-V-000-
3.3 Cleaning debris (Prior HT) V-000-006 & API 650 006, section 11 N/A S C W S
DRP001-PUC-SPE- RP001-PUC-SPE-V-000-
3.5 Cleaning & drying (after HT) V-000-006 & API 650 006, section 11 N/A S C W S
DRP001-PUC-SPE- DRP001-PUC-SPE-W-
W-000-008 & 000-008 & DRP001-PUC-
3.8 Surface Preparation DRP001-PUC-SPE- SPE-W-000-009 section CON-COA-01 W C S S
W-000-009, section 8 8 & Annex B
DRP001-PUC-SPE- DRP001-PUC-SPE-W-
W-000-008 & 000-008 & DRP001-
3.9 Painting & lining works DRP001-PUC-SPE- PUC-SPE-W-000-009 CON-COA-04 W C W S
W-000-009 section 8
DRP001-PUC-PRO-
3.12 Final Closure Authorization Q-000-009 & Project - CON-STA-15 H C H W
Procedures
DRP001-PUC-PRO-
Compilation of
3.13 Final Acceptance Q-000-009 & Project - H Q H H
Procedures Quality Records
This document should be read/used in conjunction with the following documents, as minimum: DRP001-PUC-PRO-Q-000-009, QA/QC REQUIREMENTS FOR SUBCONTRACTORS; DRP001-PUC-PRO-Q-000-008, GUIDELINES FOR THE USE OF CONSTRUCTION INSPECTION & TEST PLANS
(ITPs), and corresponding QC Forms mentioned in this ITP.