Under progress 6
Close 46
Total 83
Vertical Cable tray installed in the shaft was Vertical Cable tray must be installed with the angle
10 Very High Open No Action Taken yet
grouted directly to the wall. support grouted in the wall
Solid bend & inspection bend are not being used Inspection bend & solid bend should be used at
13 Very High Closed
at beams in case of MS conduits beams so that future maintenance will be easier.
Wire or cable termination done without using proper Lugs and thimbles are required for proper
14 High Closed Agreed upon
lugs/thimbles termination of cables/wires.
Opening between joints is not at all recommended as Race way junction are now
Raceway junction are not properly fixed and this may lead to passage of lot of unwanted covered with flooring, so it is
18 Very High Closed
have lots of openings. elements i.e. water, insects, which may damage not visible and it was confirmed
wires. that it is already taken care.
Lighting drawings, Power drawings, LV drawing It is strongly recommended to develop drawings for
20 Electrical Drawings are available but earthing schematic drawing & Very High future upgradations and for reference in-case of any Closed
SLD was not available. fault so that it can be rectify as soon as possible
It was informed that testing of fire line has not Before false ceiling work fire ine should be tested so
24 been completed and false ceiling work has Critical that if any leakage found then it can get easily Closed
already started rectified
Fire Pump room is It was informed by PMC team that all pumps are
30 located at the basement commissioned but it was observed that all Very High All pumps must be in auto mode including DG pump. open Will be done before handover
near car parking pumps are kept in manual mode only.
Pumps are not connected with the earthing Double earthing for pump needs to be provided to
31 High Closed Agreed upon and will be done.
strips in pump house avoid any electrocution.
CIVIL STRUCTURE
2. Check for restriction at air suction side & hot air outlet
side from DG set enclosure.
Secondary containment is not provided for Diesel Secondary containment must be provided for any
37 Pump House Very High Open No Action Taken yet
tank in pump house. leakage of diesel
Proper ventilation must be provided for battery Battery is kept in LT panel room
45 Very High Closed Agreed
Room
Joints were found in the kitchen area in the Light It is recommended to avoid joints in the final
46 2nd Floor Kitchen Area Critical Closed Discuss with Neeraj Sharma
switch board during installation. termination of socket.
This diesel drum is kept in front of the DG,meter Diesel Drum must be kept far from any electrical
50 DG Area panel and 500KVA package substation without High panels and secondary containment should be Closed
any secondary containment provided for any spillage.
Cable trench under the substation might get Sealant mechanism needs to be provided for outdoor
500 KVA Package
56 filled with water during rainy season and there is critical cable trench or draining provision needs to be Open
substation panel
no provision to drain it out. provided with automatic water pumping system
58 VRV Earthing Earthing was missing of the VRV unit Critical Earthing needs to be provided for VRV Unit at terrace closed
Sprinkler point were observed over the VRV Sprinkler point should be blocked/removed from
59 Sprinkler critical Closed
electrical Panel above the panel
60 Fire Pump Room Sump Pump pit was not covered critical It needs to be covered Closed
63 Server Room Rodent Repellent was not available Critical Rodent Repellent is required for server room closed
All wires connected to the light fittings, installed Wiring joints must be avoided at all places especially
67 Light Fittings Critical Closed
outside/along the periphery, have joints at the open area.
68 MCCB Phase separator needs to be provided Critical Phase separator is required for all the MCCBs Under progress
Gland plate was missing from the bottom of the It must be provided to cover all the DBs to protect it from
69 MCCB DB Critical Open
panel the entry of vermin's and arc flash
One cable gland is not installed in the lighting DB at Cable gland supports cables installed in the DB and
70 Cable gland High Open
the reception area. absorb the mechanical stress generated by cables
71 Open
existing Electrical Pole is falling in front of main gate. Batteries must be kept in well ventilated area and away
And bared live conductors are crossing overhead at from the combustible material storages. As the cupboard
UPS Battery the entry/Exit Gate Critical is of wood, which is combustible in nature.
Wire Joints Joints found near battery rack and Fire panel Critical
74 Closed
Naked wire naked wire hanging in office floor near light fittings Critical It needs to be removed as early as possible
76
LPG line for the kitchen needs to be earthed at least two
Earthing of LPG line LPG Line for kitchen is not earthed Critical to three places at 10 m apart Open
77 Closed
It was observed that all the As built drawings, Test it is recommended to collect all the documents from the
80 documents Important Open
certificate, OEM manual of all the equipment vendor as early as possible
installed, Panel inspection certificate, PAT
(preliminary Acceptance test) certificate, FAT (final
acceptance test) certificate, performance guarantee
was not available with the maintenance team
Crack needs to be fixed and leakage needs to be removed
and proper testing of line needs to be done to maintain
the pressure in the line
Fire Extinguisher
One 4.5 kg capacity carbon dioxide or one 2/3 kg capacity
83 Fire eatinguisher at all foors are not adequate clean agent extinguisher for every 100 m2 of floor area or
part thereof with minimum of two extinguishers so
located as to be available within
High 10 m radius. (IS 2190-B-2.1 Class A - Special Hazard) Open
Date of Visit 29.03.2019
28.02.2019 15.03.2019 30.04.2019
Remarks (As discussed during Remarks (As discussed during meeting-Mr Ranjit
meeting) and project In charge)
NIL Nil
Materials has been procured however, still pending Few of the extinguishers are placed however few
As discussed it is to be planned
for the placement of extinguishers extinguisher needs to be placed at designated area.
Nil nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Fire panel is installed at the main gate.
Fire alarm Repeater panel was observed to be installed
Smoke detectors are installed in the electrical rooms,
near the main security room which was giving alarm and
Discussed during meeting and UPS room
the security personal has muted the alarm. It is
informed that one repeater panel will In server room, detectors are installed below the
recommended to remove all the false alarm and a
be provided at security gate. floor(as informed by the vendor). This couldn’t be
training needs to be provided to all the security team for
verified physically. We recommend to install smoke
the use of panel.
detectors on the ceiling also
Nil Nil
Nil Nil
Nil Nil
Completed Nil
Nil Nil
Discussed During Meeting Emergency lights supply has been provided with UPS Nil
3.4.8.1
Wherever batteries are provided, the
same shall be Fire rated paint will be applied on the door from inside
Not yet provided
segregated by 120 min fire rated and the same is in progress
construction.
Ventilation to the room shall be
provided as per
manufacturers instructions.
Nil Nil
Done Nil
Nil Nil
Nil Nil
removed Nil
Cover provided Nil
Nil
Nil Nil
Completed Nil
same as observed before